Submits Status Update & Revised Completion Schedule for Corrective Actions Identified in Util Response to Violation from Insp Repts 50-259/87-14,50-260/87-14 & 50-296/87-14. List of Commitments Encl
ML20236S780
Person / Time
Site: Browns Ferry  
Issue date: 11/23/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8711300091
Download: ML20236S780 (3)


Text

. _ _ _ _. _ _ _ - _ _ - _ _ _ _ _

r

=

l TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37401 5N 157B Lookout Place NOV 231987 4

l U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Hashington, D.C.

20555 Gentlemen:

In the Matter of

)

Docket Nos. 50-259 Tennessee Valley Authority

)

50-260

)

50-296 BROWNS FERRY NUCLEAR PLANT (BFN) UNITS 1, 2, AND 3 - NRC INSPECTION REPORT NOS. 50-259/87-14, 50-260/87-14, AND 50-296/87 COMMITMENT DATE REVISION FOR VIOLATION CORRECTIVE ACTIONS This letter provides a status update and a revised completion schedule for the corrective actions identified in TVA's response to violation number 1 identified in the subject inspection report. Our original response on this matter was provided in a letter from R. Gridley to G. G. Zech dated July 20, 1987.

The corrective actions originally addressed in this letter included a commitment to:

1.

Perform a special test to verify the adequacy of Surveillance Instructi 4.7.E.5 to correctly set the damper positions required to support the postaccident ventilation valve alignment of the control room emergency ventilation system (CREVS).

2.

Perform a test before restart in which the capability of the CREVS to pressurize the control building to a positive pressure will be demonstrated.

The violation response stated that "... the above corrective actions be completed before the loss of power and loss of coolant accident (LOP /LOCA) restart test which is currently scheduled for December 1,1987."

The BFN schedule for completion of these commitments is being revised to be dependent on the event (LOP /LOCA test) only and not the date.

The original commitments and the revised completion schedule are provided in enclosure 1.

This item was discussed with Mr. J. Watt, NRC Office of Special Projects, on October 29, 1987.

8711300091 871123 PDR ADOCK 05000259 O

PDR y

An Equal Opportunity Employer

. n I

U.S. Nuclear Regulatory Commission NOV 281987 If there are any questions, please telephone Dave J. Skridulis at (205) 729-2070.

Very truly yours, TENNESSEE VALLEY AUTHORITY

]

/

i R. Gridley, D, rector Nuclear Licensing and Regulatory Affairs Enclosures cc (Enclosure):

Mr. G. G. Zech, Assistant Director Regional Inspections Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission Region II 101 Marietta St., NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-West Highway EWW 322 Bethesda, Maryland 20814 Browns Ferry Resident Inspector Browns Ferry Nuclear Plant Route 2 P.O. Box 311 Athens, Alabama 35611 l

I l

List of Commitments 1.

A special test will be performed to resolve the question on proper system configuration to be utilized in SI 4.7.E.5.

2.

The Restart Test Program will perform a test to prove capability of CREV to pressurize the control room.

BFN's schedule requires the above corrective actions to be-complete before our LOP /LOCA Restart test.