ML20236S593

From kanterella
Jump to navigation Jump to search
Forwards Inservice Insp Rept for Trojan Unit 1 Nuclear Generating Plant. Rept Constitutes Final Insp for First 10-yr Interval.No Findings of Significant Nature Discovered During Exam
ML20236S593
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/23/1987
From: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236S595 List:
References
NUDOCS 8711250272
Download: ML20236S593 (1)


Text

__ _,

y l

l'

)

l W Gerier-d ElechicWiy 1

' David W. Cockfield ' Vice President, Nuclear l

November 23, 1987 Trojan Nuclear Plant Docket 50-344

,N License NPF-1 U.S. Nuclear Regulatory Commission

' ATTN:

Document Control Desk JWashington DC 20555

Dear' Sir:

1987 Inservice Inspection Report E

Attached is the report of the Inservice Inspection performed at the Trojan Nuclear Plant during the 1987 refueling outage. This report is submitted Lpursuant'to Subsection IWA-6220 of the 1974 Edition of Section XI of tho' LAmerican-Society of Mechanical Engineers Boiler and Pressure Vessel Code and constitutes the final inspection report for the first 10-year interval.

No findings of a significant nature were discovered during the examination.

Sincerely, Attachment c:

Mr. John B. Martin Regional Administrator. Region V U.S. Nuclear Regulatory Commission Mr. Dave Yaden. Director - w/o attachment State of Oregon Department of Energy Mr

-R.

C. Barr - w/o attachment NRC Resident Inspector Trojan Nuclear Plant Mr. A. Snook, Chief t

.Boller and Elevator Safety Programs Oregon Department of Commerce f

8711250272 871123 1k gDR ADOCK 05000344 PDR I

(

121 S W Ealmon Sneet Pomind. Oregon 97204 i