Forwards Rev 2 to TMI-2 Fire Protection Program Evaluation, Reflecting Mods Consistent W/Current Unique Shutdown Condition.Proposed Rev to Tech Specs Will Be Submitted Separately.Fee Paid
ML20236S346
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/17/1987
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236S347 List:
References
4410-87-L-0146, 4410-87-L-146, NUDOCS 8711250076
Download: ML20236S346 (2)


Text

..

h v

II.,

i GPU Nuclear Corporation Nuclear

=ss48o e

Middletown. Pennsylvania 17057-0191 I

K 717 944-7621 TELEX 84 2386 Writer's Direct Dial Number:

J (717) 948-8461 November 17, 1987 4410-87-L-0146/0224P

, US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Dear Sirs:

w.

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

{

Operating License No. DPR-73 Docket No. 50-320 TMI-2 Fire Protection Program Evaluation Attached is a revision to the TMI-2 Fire Protection Program (FPPE). This I

o revision reflects modifications that are consistent with the current unique shutdown condition of TMI-2.

The revised FPPE retains only one fire area (i.e., the TMI-2 Reactor Building). Section 3.2 of.the'FPPE evaluates the consequences of a fire and concludes that-the. safe shutdown condition of TMI-2 would not be impaired and an off-site release greater than the limits specified'in 10 CFR Part 100 would not result. -This document further concludes (Section 3.2) that this change is i

not an Unreviewed Safety Question as defined by 10 CFR 50.59 and, thus, in general,'it does not require NRC approval prior to implementation.

The attached proposal, however, contains some changes that will also require a revision to the TMI-2 Technical Specifications (e.g., deletion of deluge / sprinkler systems and halon systems). GPU Nuclear is currently

(

preparing a change to the TMI-2 Technical Specifications, based on the j

attached proposal, which will be submitted separately for NRC review and

^j approval for these specific requirements.

As a special case, Technical Specification 3.7.11, " Penetration Fire Barriers," allows some flexibility in determining which penetration fire

]

barriers need be inspected to comply with the Limiting Condition for Operation

]

(LCO). This LCO slmply specifies that those barriers which protect l

Safety-Related areas are required to be functional. Thus, based on the i

attached proposal, which establishes one fir a ea (the Reactor Building),

h

[

%gh F

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation

_3

mgg, -

T w

e/ MlNA

> ' n%

g' 4

lDocumentControlLDesk" -

November 17, 1987 k' @ L 4410-87-L-0146 s..

1:

j %{

i GPUlNuclearfintends-to' delete theLinspection of fire penetration barriers and 9/M "Tthe requirement'to perform an hourly firewatch when the barriers'are h!,

' fnon-functional,f(

Reference:

Section..D'.l.j of the NRC BTP APCSB 9.5-l' Appendix A

- comparison)'between internal fireizones.

a y

Per thefrequirements' of.10 'CFR.170, an' application fee of' $150.00 is.' enclosed.

W -

Sincerely,,

,y

. R. Standerfe

,, s.

Director,_TMI-2

, L JFRS/RDW/emli

-' L y

P

Attachment:

R Enclosed:. GPU Nuclear Corp. Check No.- 008237' y

fcc:, :: Regio _nal-Administrator, Region 1 '- W. T. Russell Directior, TMI-2. Cleanup _ Project Directorate - Dr. W. D. Travers

l., ? -

J;*

L 4

u, r (%'

fi o

e' 4

& A

,'f

- k, l

f

'i I

^

l_., G ':

u; i

' ? l:.

t

__ _ _ _m.

m__.

-___2__.__.__

_______m__.

_______a

- - - -m ma_

m--