ML20236S248
| ML20236S248 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/16/1998 |
| From: | Patrick W CENTER FOR NUCLEAR WASTE REGULATORY ANALYSES |
| To: | Linehan J NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
| Shared Package | |
| ML20236S250 | List: |
| References | |
| CON-FIN-D-1035, CON-FIN-J-5164, CON-FIN-J-5186, CON-FIN-J-5190, CON-FIN-J-5206, CON-FIN-J-5210, CON-FIN-J-5226, CON-NRC-02-97-009, CON-NRC-2-97-9, REF-WM-11 HLWR, NUDOCS 9807240223 | |
| Download: ML20236S248 (1) | |
Text
-_
Center for Nuclear Waste Regulatory Analyses 6220 CULEBRA ROAD e P.O. DRAWER 28510 SAN ANTONIO, TEXAS. U.SA 78228-0510 July 16,1998 (210) 522-5160
- FAX (210) 522-5155 Contract No. NRC-02-97-009 Account No. 20-1402-158 l
U.S. Nuclear Regulatory Commission Attn: Mr. John J. Linehan, Director Office of Nuclear Material Safety and Safeguards Program Management, Policy Development and Analysis Staff Mail Stop 8-A23 Washington, DC 20555 l
Subject:
CNWRA Program Manager's Periodic Report on Activities of the Center for i
Nuclear Waste Regulatory Analyses for Period 10-FY98
Dear Mr. Linehan:
'lhe attached " Program Manager's Periodic Report" (PMPR) documents the progress and financial status of the Center for Nuclear Waste Regulatory Analyses (CNWRA) for the period June 6 through July 3,1998. Its contents comply with the requirements of section F.1.5. of the referenced contract. A diskette containing the PMPR in Wordperfect 8 format is also enclosed.
Cost variance analyses are provided for the Division of Waste Management (D1035), Tank Waste Remediation System (J5164), Three Mile Island Unit 2 Independent Spent Fuel Storage Installation (J5186), Dry Transfer System (J5206), Centralized Interim Storage Facility (D1035), Private Fuel Storage Facility (J5226), West Valley Demonstration Project (J5190), and Savannah River Site Aluminum-Based Spent Fuel (J5210) Job Codes (JCs), as well as for composite spending on this contract. All variances are expressed with regard to the current operations plans.
During period 10, three schedule changes were made as reflected in table 2. Ten deliverables were transmitted as indicated in table 3.
q[
Please contact me or Mr. Henry Garcia if you have questions regarding this re rt.
l Sincer y urs, 3
//
l}.
esley C. Patric h///
President HFG/lg g
Enclosures cc:
B. Mechan J. Greeves C. Haugimey
,l C. Paperiello M. Weber S. Bahadur D. DeMarco E. Ten Eyck M. Federline l
B. Stiltenpole (38)
E. Brach CNWRA Directors / Element Managers W. Kane H. Thompson S. Boyanowski (SwRI Contracts) 9807240223 980716 PDR WASTE WM-11 pog Washington Office
- Twinbrook Metro Plaza. #210 *12300 Twinbrook Parkway
- Rockville, Maryland 20852-1606 wwn a u w
_____a 1
_ - - _ - _ _