ML20236S117
| ML20236S117 | |
| Person / Time | |
|---|---|
| Issue date: | 11/18/1987 |
| From: | Crutchfield D Office of Nuclear Reactor Regulation |
| To: | Hind J, Martin T, Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20236S119 | List: |
| References | |
| NUDOCS 8711240232 | |
| Download: ML20236S117 (4) | |
Text
)
v-
,f[
k UNITED STATES -
- y
([ g NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C,20555
j 5
k.... p#
November 18, 1987 9
MEMORANDUM FOR: Thomas T. Martin, Director Division of Radiation' Safety and Safeguards, RI J. Philip Stohr,. Director Division of Radiation Safety and
. Safeguards, RII John A. Hind, Director Division of Radiation Safety and Safeguards, RIII Richard L. Bangart, Director Division of Radiation Safety and Safeguards, RIV Ross A. Scarano, Director Division of Radiation Safety and l
Safeguards, RV FROM:
Dennis M. Crutchfield, Director l
Division of Reactor Projects - III, l
IV, V and Special Projects j
Office of Nuclear Reactor Regulation
~
SUBJECT:
REGULATORY RESPONSIBILITIES FOR BYPRODUCT. MATERIALS IN NON-POWER REACTORS In a July 14, 1987 memorandum on the same subject as above, you were requested to comment on the need for a general policy regarding the Regulatory Responsibilities for Byproduct Materials in Non-Power Reactors. Your' responses indicate that an NRC policy in this area would be useful. Accordingly, we have -
drafted a policy which I am enclosing for your review and comment. Your review should consider the procedures being used_at non-power reactors
}
/)l l
CONTACT:
T. Michaels II NRR/PDSNP t
Ext. 28251
/
8711240232 871118' PDR-ORG NRRB
NovemberL18, 1987-'
i' l
- 2..
y to determine whether there.may be'any problems with its implementation. The-policy combines one of your' suggestions in response to.our July,14,1987.
1 memorandum in' addition to criteria 'ds yeloped in Policy and ~ Guidance Directive FC 83-19,'also enclosed.
I
.i Original signed by l
Dennis M. Crutchfield
)
Dennis M.. Crutchfield, Director Division:of Reactor Projects:- III, IV, V and Special Projects.
I l
Office of Nuclear Reactor Regulation.-
Enclosures:
As stated i
l L
cc:
R. Cunningham, NMSS R. Fonner, OGC T. Martin, ED0 J. Metzger, NMSS
.l D. Nussbaumer, GPA 1
, DISTRIBUTION:,
i hCentral g F11e; '
l NRC PDR 1
PDSNP Reading l
DCrutchfield LRubenstein EHylton TMichaels
\\.
PDSNPfjk P
N-( D D
I' TMich5els:cw l
,tein
~
DCr hfield 7
11//0 /87 11//.3 /8B 11//f /87
.11/
87
'l 1
l l
4
-2
.l to determine whether there may be any problems with its implementation. The policy combines one of your suggestions in response to our July 14, 1987 memorandum in addition to criteria developed in Policy and Guidance Directive FC 83-19, also enclosed.
' N.
Dennis M. Crutchf eld, rector Division.of Reactor Projects - III,
.IV, V and Special Projects
(
Office of Nuclear Reactor Regulation' j
l
Enclosures:
As stated cc:
R. Cunningham, NMSS R. Fonner, OGC T. Martin, EDO J. Metzger, NMSS D. Nussbaumer, GPA I
l
\\
i i
l
h I
1 t
Enclosure DRAFT POLICY FOR APPLICATION OF LICENSE BOUNDARIES AT NON-POUER REACTORS'
,j 1.
The 10 CFR Part 50 license would apply over areas bounded by the area, defined by the Price-Anderson Agreement covering the. license. Outside
.i this boundary'the fiRC byproduct material license or Agreement State license would apply.
2.
The exception to the first criterion is the possession and use of byproduct material for performance of industrial radiography. A firm which holds an NRC Agreement State license which authorizes performance l
J of. radiography may perform radiography at reactor sites pursuant to that license.
3.
Occasionally a reactor licensee may wish to perform industrial radiography at the reactor site.
If the site is located in an Agreement State, the license for the performance should be obtained from the Agreement State.
If the site is in a non-Agreement State, a separate license issued pursuant to 10 CFR Part 34 should be obtained from the NRC by the reactor licensee.
1 I
e l
l m