Text
.
3 3
h AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 7'
3
! 3 ErFECTIVE DATE
!4 REOutSITION PURCHASE REO NO.. _..
2 AMENDMENTtMODiFICATION NO 5 PHOJECT NO fH apeutetw 8
see block 15c RES97039/RESC98441- - - - - - - - - - - -
~
T ADMINISTERED BV (11 other than stem 6l s IS$uED OT
-[
jT U.S. Nuclear Regulatory Cormiission Division of Contracts and Property Mgt.
Attnr T 7 I 2 Contract Management Branch l
Washington DC 20555-i l
s NAMf AND ADDRESS of CONTRACTOR INo, estut, county, stat. and ZIP Cod.)
{ IX) 9A. AMENDMENT OF sOUCITATION NO es. DATED tsEE vTEu i t Scientech, Inc.
11140 Rockville Pike, suite 500 Rockville, MD 20852 10A MODIFICATION OF CONTRACT < ORDER NO Con # NRC 04-97-039 to8 DATED ($EE ITEM 131 cops lFAciuTv cooE X
04 74 1997
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS O The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of OffersOi= i aded. Di= aat t ad e-Offers rnust acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
d By completing items 8 and 15, and returning.
copies of the amendment; (b) By acknowledging receipt of this amendment of each copy of the
. offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILUAc OF YOUR AC-
' KNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TC THE HOUR AND DATE SPECIFIED MAY RESULT IN P. EJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already subn.itted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received pnor to the operung hour and date specified.
i2 Accounting ANo ApeROeRiATiON DATA o,. u..
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, IT MODIFIES THE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14.
trJ A. THis CHANGE ORDER ts ISSUED PURSUANT TO. (Sp.cify authontv) THE CHANGES SET FoRTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO IN ftgy toA,
- s. THE AaOVE NUMSERED CONTRACTtORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES tauch as chang.a en paymg offes., appropnahon date, etc.l SET FORTH IN ITEM 14. PURSUANT TO THE AUTHomTY OF FAR 43 lo3(bl.
C. THIS SUPPLEMENT AL AGREEMENT is ENTERED INTo PURSUANT TO AUTHORITY OF:
FAR 52.243 2 Changes Cost Reistbursement X
D 61NER isp.cefy typ. of modification and aumontyl E. IMPORTANT: Contractor is not. X is required to sign this document and return two copies to the issuing office.
1s. DESCNFnON OF AMENDMENT /MOOtFICATION torg.nued by UcF s.ction h.aden0s. mctueene.ohestaten/ contract outH.ct matt.e wh.r. f.esstH.3 See attached continuation sheet.
Ofi 9807240018 990717 9
PDR CONTR l
NRC-04-97-039 PDR
<a-r
)y s i
[
E-t.,m.
Co cum.ni
..,n.e m it.ni SA., ioA. = e ioeo,. ce,.no.a.
m n. unch.no.a.w sua vore..no.ei.ct.
IsA. NAME AND TITLE Of slGNER ff and IsA. NAME AND TITLE oF CONTRACTING OFFICER {Typ. et pnnt)
Melissa H. A.orfmuth Stephen Pool u
Contracts Manager r
m n /)
EmCA
[
16C DATE s4GNED 1st UNfTYJA tsOF A
] onw ise RA q
tst TE NED ivQcLORpDMFFE
+
h Ib
/
s.onemer. or comri one 07 09-1998 i
F ts.enetu
.e e.<n]oa,wns.o to mont sT--,o,tM so (REv io sa, i-m I_ _ _ - -
- odh 8' Con # NRC-04-97-039 l
' CONTINUATION PAGE l
The purpose of this modification is to incorporate a within-scope change to
-task area 2.to add specific code improvement subtasks which were not priced
'into the basic contract or its option years.
The contract estimated cost will be increased by $115,552, and the fixed fee is increased by $8,089 for a total 2CPFF-increase of $123,640. Accordingly, the contract is modified as follows:
- 1. Pursuant to FARf52.243-2, the following cubtasks are hereby added to TASK AREA'2 of the contract:
Subtasks:
.3.
Code Improvement.s (e)
In accoriance with the draf t NRC-SQA Plan, the contractor shall develop j
a script to automate the process of generating a PC version of SCDAP/RELAP5 from the' UNIX version of the code. The contractor shall test and assess the software, and generate.an executable of SCDAP/RELAP5 MOD 3.2 for PC.
The contractor shall document the script and results of assessment.
Completion date: July 31, 1998 (f).
The contractor shall provide support for an HSK (Switzerland) staff who will be-on assignment at NRC/RES to separate the SCDAP modules from the RELAP5/SCDAP code. The contractor shall develop SCDAP-specific interfaces that will couple-the SCDAP code with ar.y T/H code similar to that coupling PARCS with RELAPS.
The. support will be limited to consultation on the RELAPS code and the procedures we develope,d in coupling PARCS with RELAPS.
Completion Date: June 30, 1999 7.
Pilot Codes 1
(a)
' Dual Lagrangian Numerical Scheme The. contractor shall develop a dual Lagrangian numerical scheme for thermal-hydraulic computation of two-phase flows with capabilities for
' branching and merging that will be fixed in space.
This may include an upgrade to an existing pilot code to test the numerical schemes on selected problems / data.
The contractor shall document the developed methodology, the pilot code,' and results of testing.
Completion Date:
August 31, 1999 Key Personnel:
Prof.
V.
Ransom, Purdue Univ.
(b)
De-couple Interfacial Temperature from the Pressure Field The contractor shall modify the interfacial temperature in T/H flow computations to de-couple the temperature from the local pressure field to eliminate / moderate-unphysical numerical oscillations.
This may include the use"of a:p~ilot code to test the methodology.
Documentation of the results
'in accordance with the draft NRC-SQA Plan shall also be accomplished by the contractor.
Completion Date:
August 31, 1999
. Key. Personnel:
Prov.
.V.
Ransom, Purdue Univ.
Page 2 of 3
__d---
D-~
~ = - - - ~ - ~ - - -
FAGM D i 'l l S I O N OF CONTRACT 3 301 415 $?61 g7,g7,g99g ggg$$
p, 2
Mod # 8 Con # NRC-04-97-039 2.
As a result of the above, Section B.3, Consideration and obligation, parggraphs (a), (e), and. (f) are deleted in their entirety and the following parcgraphs are substituted in lieu thereof i
"(c) The total estimated cost to the Government for full performance of contract is $2,711,986.69, of which the sum of $2,521,997.59 represents the i
actimated reimbursable costs, the amount of $182,489.88 represents the fixed foo, and the amount of $7,499.22 represents the facilities capital cost of money. These amount do not include amounts for unexercised future option ysors.
(e)
The amount currently obligated with respect to this contract is
$2,450,847.28 of which the sum of $2,279,153 represents reimbursable costs,
$6973.22 represents FCCM, and $164,721.06 represent the fixed fee.
(f)
It is estimated that the amount currently allotted will cover performance through September 30, 1998."
3.
Section F.6, Duration of Contract Period, is revised as follows:
"This contract shall commence on 4/24/97 and will expire on 4/23/99.
However, the contract period for work described in Modification No.
8, Task Arca 2, will expire on 8/31/99.
The term of this contract may be extended at the option of the Government for an additional 3 one-year options.
Should the NRC exercise an option years, the optional years will be exarcised and commence in ril."
- 4. A summary of obligations, from the award date through the date of this modification, are provide below:
Total FY 97 Obligations: $
947,847.28 Total FY 98 Obligations: $1,503,000.00 Cumulative Obligations:
$2,450,847.28
- 5. This modification obligates FY 98 funds in the amount of $50,000.
- 6. The following clause for government furnished property is hereby incorporated into this contract at Section H.8:
H.8 GOVERNMENT FURNISHED EQUIPMENT / PROPERTY (DEC 1995)
(a) The NRC will provide the contractor with the following items for use under this contract:
- 1. DEC Alpha CPU NRC Prop. No. 064995 Ser. No. 2A41771635
- 2. Monitor NRC prop. No. 064999 Ser. No. AB430010VU (b) Only the equipment / property listed above in the quantities shown will be provided by the Government. This property is subject to the provisions of l
the Government Property clause under this contract.
All other l
shall be squipment/ property required in performance of the contract furnished by the Contractor.
(END-OF-CLAUSE) l
- 7. All other terms and conditions remain unchanged.
Page 3 of 3 se i