ML20236R738
| ML20236R738 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 11/17/1987 |
| From: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8711240001 | |
| Download: ML20236R738 (2) | |
Text
_ _ _ _
- g. :
p
{.
,ji
~
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA A, PA.19101 (215)841-4000 November 17, 1987 I
'.Mr.
Robert Gallo
- -'~
iChief,10perations. Branch LU. S. Nuclear Regulatory Commission Region I' Attention:
Document ~ Control-Desk Washington,'D.C.
20555
SUBJECT:
! Operational Team Assessment - Reference Material Requirements
'l
DeareMr~. Gallo:
y l
InLaccordance with.your. request.of September 21, 1987,
..certain reference materials have been furnished to your office to L
assistLyou in preparation for the operational assessment of i*
selected Peach. Bottom operating; crews.
This letter of transmittal will~ serve.to summarize the various documents delivered t'o'the NRC on October 13, 30 and November 6, 1987.
L
' l )'-
,Index and description of all malfunctions available on l
the' Limerick: simulator using the Peach-Bottom training O
idisk.
r b
'2)-
Performance' objectives for team training exercises.
3)
Specific evaluation. objectives for use with simulator training scenarios.-
4)
Draft of the position description for shift manager,
' Peach Bottom Atomic. Power Station.
5) l Compilation of all Peach Bottom simulator training scenarios analyzed for suitability with the Limerick simulator.
6)
Text of classroom materials used during the " People -
Foundation of Excellence" training course.
- 7).
' Outline of classroom activities. scheduled to supplement the crew's simulator performance sessions.
B711240001 871'117 I
i PDR ADOCK 05000171.
I l
P PDR
}
l y
R____
n,_,..-
gr 9q
- p. ;';
4
~..e,
q s.c :
p;"
lMr.-'. Gallo1:
November'17',~1987
-Page 2 of 2 t.
on LWe:: appreciate; the cooperation.and -'ef fort ' extended-by the
- Operations Branch, in view of your extensiveTprevious-3 Commitments.- If'you'have'.any questions,' feel free.to call Mr.
. Robert W.: Bulmer,; Superintendent! Nuclear.. Training,Section at
~
", - (215).'495-7044for Mr. Richard G.'Andrews,.' Peach Bottom Training-
' V Coordinator at?(717)-.456-7014 ext. 5038.
c.x Sincer'ely, Joseph 1W. Gallagher Vice President Nuclear ~ Services y
i-
- cc:l Addressee 1
.'Dickinson ' M. ' Smith, Vice Presidenti, PBAPS Graham M.
Leitch,.Vice' President, LGS
~
. John 1B. Cotton,-. Operations ~ Superintendent,.PBAPS' g;
4 Robert W.'Bulmer,-Superintendent Nuclear Training Section Richard G. Andrews,. Training-Coordinator, PBAPS.
DAC.
r
t
o r;
e H
D