ML20236R738

From kanterella
Jump to navigation Jump to search
Summarizes Various Documents Delivered to NRC on 871013 & 30 & 1106 to Assist in Preparation for Operational Assessment of Selected Plant Operating Crews,Per NRC 870921 Request
ML20236R738
Person / Time
Site: Peach Bottom  
Issue date: 11/17/1987
From: Gallagher J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Gallo R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8711240001
Download: ML20236R738 (2)


Text

_ _ _ _

g. :

p

{.

,ji

~

PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA A, PA.19101 (215)841-4000 November 17, 1987 I

'.Mr.

Robert Gallo

-'~

iChief,10perations. Branch LU. S. Nuclear Regulatory Commission Region I' Attention:

Document ~ Control-Desk Washington,'D.C.

20555

SUBJECT:

! Operational Team Assessment - Reference Material Requirements

'l

DeareMr~. Gallo:

y l

InLaccordance with.your. request.of September 21, 1987,

..certain reference materials have been furnished to your office to L

assistLyou in preparation for the operational assessment of i*

selected Peach. Bottom operating; crews.

This letter of transmittal will~ serve.to summarize the various documents delivered t'o'the NRC on October 13, 30 and November 6, 1987.

L

' l )'-

,Index and description of all malfunctions available on l

the' Limerick: simulator using the Peach-Bottom training O

idisk.

r b

'2)-

Performance' objectives for team training exercises.

3)

Specific evaluation. objectives for use with simulator training scenarios.-

4)

Draft of the position description for shift manager,

' Peach Bottom Atomic. Power Station.

5) l Compilation of all Peach Bottom simulator training scenarios analyzed for suitability with the Limerick simulator.

6)

Text of classroom materials used during the " People -

Foundation of Excellence" training course.

7).

' Outline of classroom activities. scheduled to supplement the crew's simulator performance sessions.

B711240001 871'117 I

i PDR ADOCK 05000171.

I l

P PDR

}

l y

R____

n,_,..-

gr 9q

p. ;';

4

~..e,

q s.c :

p;"

lMr.-'. Gallo1:

November'17',~1987

-Page 2 of 2 t.

on LWe:: appreciate; the cooperation.and -'ef fort ' extended-by the

Operations Branch, in view of your extensiveTprevious-3 Commitments.- If'you'have'.any questions,' feel free.to call Mr.

. Robert W.: Bulmer,; Superintendent! Nuclear.. Training,Section at

~

", - (215).'495-7044for Mr. Richard G.'Andrews,.' Peach Bottom Training-

' V Coordinator at?(717)-.456-7014 ext. 5038.

c.x Sincer'ely, Joseph 1W. Gallagher Vice President Nuclear ~ Services y

i-

cc:l Addressee 1

.'Dickinson ' M. ' Smith, Vice Presidenti, PBAPS Graham M.

Leitch,.Vice' President, LGS

~

. John 1B. Cotton,-. Operations ~ Superintendent,.PBAPS' g;

4 Robert W.'Bulmer,-Superintendent Nuclear Training Section Richard G. Andrews,. Training-Coordinator, PBAPS.

DAC.

r

t

o r;

e H

D