ML20236R409

From kanterella
Jump to navigation Jump to search
Ack Receipt of Review & Comments on Util Commitment to Excellence Action Plan Submitted Per NRC Order Shutting Down Plant on 870331.Comments Forwarded to Util for Consideration in Revising Plan
ML20236R409
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 11/19/1987
From: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Bacus C
PENNSYLVANIA, COMMONWEALTH OF
References
NUDOCS 8711230260
Download: ML20236R409 (2)


Text

_ _ _ - _ - _ _ _ ._ -

19 NOV 1987 Mr. Charles Bacus Secretary for Policy and Planning Office of the Governor Harrisburg, Pennsylvania

Dear Mr. Bacus:

Thank you for your review and comments on the Philadelphia Electric Company (PECo) Commitment to Excellence Action Plan (CTEAP) submitted in response to our order shutting down the Peach Bottom plants on March 31, 1987. We have forwarded your comments to PECo for their consideration in revising the plan.

Your concerns about the ability of the NRC and INPO to identify problems like the operator inattentiveness problem at Peach Bottom were previously addressed in our letter of July 13, 1987.

Currently, we are waiting for PECo to respond to our concerns about the inability of corporate management to identify, address and correct problems.

Based on the announcement of a corporate reorganization made by PECo on October 9, 1987, we expect that a formal submittal describing the new organization will be made in the near future. We also anticipate a staff level meeting near the site to discuss their plans for reorganization and revisions to their action plan to address our concerns. The time and place of the meeting will be announced at a later date.

Your comments within the scope of the shutdown order will be factored into our review of the PECo plan and its revision. We will inform you of the results of our evaluation of all issues relevant to the shutdown order.

Once again we would like to thank you for your comments. We will continue to keep your staff informed of future developments at Peach Bottom.

Sincerely, ,

4 Original Signed By

. u'sseff Regional Administrator 8711230260 871119 PDR ADOCK 05000171 P PDR OFFICIAL RECORD COPY CHARLES BACUS - 0001.0.0 11/12/87 l p

O Charles Bacus 2 19 NOV 1987 CC:

J. W. Gallagher, Vice President, Nuclear Operations Dickinson M. Smith, Manager, Peach Bottom Atomic Power Station John S. Kemper, Senior Vice President, Engineering and Production Thomas S. Shaw, Jr. , Vice President, Production ,

Troy B. Conner, Jr. , Esquire W. H. Hirst, Director, Joint Generation Projects Department, Atlantic Electric G. Leitch, Nuclear Generation Manager j Eugene J. Bradley, Esquire, Assistant General Counsel (Without Report) J Raymond L. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations l W. M. Alden, Engineer in Charge, Licensing Section Doris Poulsen, Secretary of Harford County Council Public Document Room (PDR)

Local Public Document Room (LPDR) ,

Nuclear Safety Information Center (NSIC) '

NRC Resident Inspector Commonwealth of Pennsylvania bcc:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

Section Chief, DRP Robert J. Bores, DRSS Linville/rh1 Miller Wenzinger ft I an Russell 11/[/87 11/h/87 11/ /87 11/lL/87 11/)7/87 11/q/87 0FFICIAL RECORD COPY CHARLES BACUS - 0002.0.0 11/06/87 i

- _ _ _ . _