ML20236R014

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1998 for Grand Gulf Nuclear Station,Unit 1.Rept Reflects Rev on yr-to-date Outage Rate Resulting from Rev on Planned RF06 Duration from 32 Days to 36 Days.Revised May 1998 Rates,Provided
ML20236R014
Person / Time
Site: Grand Gulf 
Issue date: 07/15/1998
From: Eaton B
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20236R016 List:
References
GNRO-98-00057, GNRO-98-57, NUDOCS 9807210190
Download: ML20236R014 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ - _ _

r

==Enterg.,y.

w e r "*

'"c-Port Gcson, MS 39150 f

Tel 60 t 437 2129 l

Bill Eaton i

Generat Manager. Plant Operabons Grand Gulf Nuclear Subon July 15, 1998 I

U.S. Nuclear Regulatory Commission

' Mail Station P1-137 Washington, D.C. 20555 Attention:

Document Control Desk

SUBJECT:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 l

License No. NPF-29 l

Monthly Operating Report l

GNRO-98/00057 Gentlemen:

In accordance with the requirement of Technical Specification 5.6.4, Entergy Operations is providing the Monthly Operating Report for Grand Gulf Nuclear Station Unit 1 for June 1998.

Please note, this report reflects a revision on the Year-To-Date Forced Outage Rate resulting from c revision on the " Planned" RF09 duration from 32 days to 36 days. This revision was made after til May 1998 monthly reports had been sent out. The revised May Monthly and Year-To-Date Forced Outage Rates are 40.3% and 7.7%, respectively.

If you have any questions or require additional information, please contact this office.

Yours truly, h

I WAE/SDlJcg attachments: 1.

Operating Status 2.

Average Daily Power Level 3.

Unit Shutdown and Power Reductions

. cc:

(See Next Page)

7

_ ', a b V '

9007210190 900715 3

DR ADOCK O 6

d GNRO-98/00057 Page 2 of 3

[

cc:

Mr. D. C. Hintz (w/a) l Mr. N. S. Reynolds (w/a) l Mr. Jager Smith (w/a)

Mr. H. L. Thomas (w/o)

Ms. K. D. Weaver (w/a)

Mr. Ellis W. Mershoff (w/a)

Regional Administrator i

U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 400 Arlington, TX 76011 Mr. Jack Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission l

Mail Stop 13H3 i

Washington, D.C. 20555 l

l

~

1 I~

l I

.. _ _ _ _.. - _ -. _ _