ML20236Q913
| ML20236Q913 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/14/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gipson D DETROIT EDISON CO. |
| Shared Package | |
| ML20236Q915 | List: |
| References | |
| 50-341-98-08, 50-341-98-8, EA-98-253, NUDOCS 9807210116 | |
| Download: ML20236Q913 (3) | |
See also: IR 05000341/1998008
Text
_
_
_
_
- . _ _ - - _ _ . - _ _ _ _ _ - _ - - - _ _ _ _ _ _ _ _ _ _
o
esun
- g
g
UNITED STATES
4
NUCLEAR REGULATORY COMMISSION
[
o
REGION lil
g
j
801 WARRENVILLE ROAD
%...../e
LISLE. ILLINOIS 60532-4351
July 14, 1998
EA 98-253
Mr. D. R. Gipson
Senior Vice President
Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
FERMI 2 INSPECTION REPORT 50-341/98008(DRP) AND NOTICE OF
VIOL.ATION
Dear Mr. Gipson:
On June 18,1998, the NRC completed an inspection at your Fermi 2 reactor facility. The
enclosed report presents the results of that inspection.
,
!
During the 6-week period covered by this inspection period, the inspector observed that
operators were attentive to control board parameters. Control board attentiveness allowed plant
operators to promptly detect equipment malfunctions including feedwater and recirculation speed
controller malfunctions and reactor power oscillations caused by secondary system steam flow
imbalances. Engineering and maintenance efforts to repair these equipment problems are
continuing.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and the
circumstances surrounding it are described in detailin the subject inspection report. The
violation is of concem because a procedure allowed the defeat of control room annunciators that
were described in the Updated Final Safety Analysis Report without determining whether a safety
evaluation was needed.
The NRC has concluded that information regarding the reason for the violation, the corrective
)
actions taken and planned to correct the violation and prevent recurrence, is already adequately
i
addressed. Therefore, you are not required to respond to this letter unless the description
therein does not accurately reflect your corrective actions or your position. In that case, or if you
'
choose to provide additional information, you should follow the instructions specified in the
l
enclosed Notice.
f
!
9907210116 990714
f
ADOCK 05000341
'
G
/6D-
>
,
,
-.
__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _
o
.
D. Gipson
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
Origuni signed by
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No.: 50-341
License No.: NPF-43
Enclosures:
1.
2.
Inspection Report 50-341/98008(DRP)
I
l
,
DOCUMENT: R:\\lnsprpts\\ powers \\ferm\\fer98008.drp
To receive e copy of thle document,ledcote in the box *C* s Copy without ettechment/ enclosure *E' = Copy with attachment / enclosure
- N* = No copy
(, ,
l@ Rlli g d
lP Rlll
l
Rlli
l
OFFICE
Rill
a
NAME
ESchvhfa6Vdp
BBu]M&s
GGrant 4h
DATE
074/9f
\\
074/98
0$98 OO
07/ /98
.
OFFICIAL RECORD COPY
._
_ _ _ _ .
_ _ _ - _ _ _ .
. _ _ _ _ _ _ _ _ _ _ _ - - - _ - _ _ _ _
.
. _
.
..
l
D. Gipson
-2-
l
cc w/encis:
N. Peterson, Director -
L
Nuclear Licensing
l,
P. A. Marquardt, Corporate
Legal Department .
!
Richard Whale, Michigan Public
Service Commission
l
Michigan Department of
Environmental Quality
,
Monroe County, Emergency
1
Management Division
Emergency Management
,
E
Division, MI Department
l
of State Police
Distnbution-
J. Lieberman, OE w/enets
'
l
J. Goldberg, OGC rdencls
B. Boger, NRR w/encls
CAC (E-Mail)
!
Project Mgr., NRR w/encls
. C. Paperiello, Ril: w/encls
J. Caldwell, Rlll w/encls
B. Clayton, Rlli w/encis
SRI Fermi w/encls
DRP w/encls
TSS w/encls .
DRS (2) w/encls
Rlli PRR w/encls
l
- PUBLIC IE-01 w/encis
Docket File w/encls
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
i
J
l