ML20236Q855
| ML20236Q855 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/17/1987 |
| From: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| P-87406, NUDOCS 8711200323 | |
| Download: ML20236Q855 (3) | |
Text
_
SAFEGUARDS.
INFORMATION r
o O eubiicservice-
= = < =. -
16805 WCR 19 1/2, Platteville, Colorado 80651 l
' November 17, 1987 Fort St. Vrain-Unit No'. 1
'P-87406 1
U. S.-Nuclear Regulatory Commission Attn: Document Control Desk q
Washington, D.C.
20555 1
Docket No. 50-267 i
~
~
SUBJECT:
Security Plan Revision 20
REFERENCE:
- 1) Public Service Letter, dated 11/17/87- (P-87407) l r)
- 2) Fort St. Vrain Physical
\\
Security Plan Revision 18
- 3) Fort St. Vrain Physical Security Plan Revision 19 l
- 4) NRC Letter, dated 09/22/87 From K. L. Heitner to R
O. Williams, Jr. (G-87336).
Gentlemen:
In accordance with the provisions of 10 CFR 50.54 (p), Revision 20 of l-the Fort St.
Vrain Physical Security Plan with Appendix "B",
" Security Training and Qualification Plan",
and Appendix "C",
" Safeguards Contingency Plan", are submitted for review and approval as the operational Security Plan for Fort St. Vrain. Appendix "A",
" Security Plan for the Protection, Receipt and Storage of Special-l Nuclear Material and Special Measures During Refueling Operations",
(Confidential), is being submitted as Revision 20, with changes, l
under separate cover.
Explanations of changes are documented under-j' attachment two of this letter.
l 8711200323 871117 f
DR ADOCK 0500 7
aNcwsuRE cONTuNs SAFEGUARDS 1 U[
SAFEGUARDS INFORMATION UPON SEPARATION THIS INFORMATION-PAGE IS DECONTROUJ:D c -_-
I
.8AFEGUARDS INFORMATION g
V P-87406 November 17, 1987 This revision was developed utilizing. Revisions 18 and 19.of the-Fort St. Vrain Physical. Security Plan as base. documents. As of this date, Revision 18,.which had been developed to meet 'the-requirements dictated by the Federal Register /Vol. 51,. No.149/ Monday, August 4, 1986/ Rules and Regulations, Page'27821, 27822 and 27825,.has not yet' received Commission approval.
Recent discussions with NRC personnel have indicated that certain portions of Revision 18 may not meet with. Commission-approval for-inclusion in 'the Fort St.
Vrain Physical ' Security Plan. These concerns are documented under' attachment one of this letter.
In addition to the above, construction activities pertaining to the Circulating Water Makeup Pumphouse are continuing and appropriate' notification will be made upon completion of these activities.
We request that the enclosed information be withheld from public disclosure pursuant to the provisions of 10 CFR 2.790'(d)
'and 10 CFR 73.21.
If you have any questions concerning'.these. matters, please contact' 4
f"N Mr. M. H. Holmes at (303) 480-6960.
R b
I Sincerely, j
R. O. Williams, r.
Vice President, Nuclear Operations Fort St; Vrain Nuclear Generating Station R0W:BJB/mit
Attachment:
1 - Item of Concern 1
2 - Table of Changes to Fort St. Vrain 1
Physical Security Plan (Revision 20).
{
3 - Physical Security Plan (Revision 20).
4 - Appendix "B", " Security Training and-Qualification Plan", Fort St. Vrain Physical Security Plan (Revision 20).
5 - Appendix "C", " Safeguards Contingency.
Plan", Fort St. Vrain Physical Security i
Plan (Revision 20).
- ENCLOSURE CONTAINS SAFEGUARDS WORMHON SAFEGUARDS UPON SEPARATION THIS PAGE IS DECONTROLLED INFORMATION 4
1 '
l
._______________._____1a
SAFEGUARDS INFORMATION-r
\\
P-87406 November 17, 1987 cc: Regional Administrator, Region IV Attn: Mr. T. F. Westerman, Chief Pro.jects Section B Mr. R. E. Farrell Senior Resident Inspector Fort St. Vrain I
(-)
V i
4 l
I
,- x
\\v ENCLOSURE CONTAINS SAFEGUARDS INFORMATION UPON SEPARATION THIS PAos is oncoNraouro SAFEGUARDS INFORMATION