-_ _ - _ _ _ _ - _.

g Westinghouse Electric Company Waltz Mill Test Reactor (TR-2)

Decommissioning Plan Errata Sheet The Westinghouse Test Reactor (TR-2) Final Decommissioning Plan should be revised as follows:

1. Pg. 2 Figure 2-13 "WTR Decommissioning Project Responsibility Matrix" should be replaced with Rev 1 to Figure 2-13, see attached.
2. Pg. A Technical Specification Section 6.2.3 (B) " Proposed changes to the facility or to procedures required by Specification 6.4, that..." should be revised to read " Proposed changes to the facility or to procedures required by Specification 6.3, that..."
3. Pg. A Technical Specification Section 6.4 " Experiments Reviews and Approvals" replace " Experiments may be conducted without prior NRC Approval... Radiation Safety Committee" with *No experiments will be conducted under the TR-2 Possession Only License" 9807210026 980710 PDR ADOCK 05000022 P

PDR I

b L

FIGURE 2-13 (Rev 1)

WTR DECOMMISSIONING PROJECT RESPONSIBILITY MATRIX i

ESBU Division Quality Systems Ocneral Regulatory Affairs Assessment Manager 5

0 i

Radiation Safety i

Comraittee r---------------

i e

i I

Radiation l

Safety Waltz Mill Site Omccr

^ " ' "

Manager

-~~~~~

(NOTE)

Pmj.ect Director e

i I

e s

i i

8 Industrialliygiene, f

Safety and Remediation Tearr Quality Facilities Environmental Program Assurance M*"*8*'

Manager Compliance Manager 1

Project Technical Lead I

Security Safety Radiation Mottison OTS Duratek Safety Knudsen IIcalth Access Environmental Omcer Operations Physics Control Lead (NOTE)

Manager Manager NOTE: The WM Radiation Safety Omcer reports to the Industrial liygiene, Safety and Environmental Compliance Manager and is also the Secretary of the Radiation Safety Corranittee.

11t-2 Fig 2-13 Rev I RESPON 117 i-l'

_ _ _ _ _ - _ _ _ _ _