ML20236P616

From kanterella
Jump to navigation Jump to search
Advises of Typo Discovered in Table 2 of 870813 Rept of Startup Testing for Cycle 8.Measured Zero Power Isothermal Temp Coefficient Reported as +.020 x10-4 Delta Rho/F & Should Be Corrected to +0.20 X 10-4 Delta Rho/F
ML20236P616
Person / Time
Site: Calvert Cliffs Constellation icon.png
Issue date: 11/10/1987
From: Mikaliake J
BALTIMORE GAS & ELECTRIC CO.
To: Russell W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
FCM-87-230, NUDOCS 8711180066
Download: ML20236P616 (1)


Text

- _ _ _ _

9 TALTIMORE

'G AO ' AND' l'

ELECTRIC

. CHARLES CENTER e P.O. BOX 1475 BALTIMORE. MARYLAND 21203,

i..-

^ NUCLEAR ENGINEERING SERVICES DEPARTMENT j.,'

". CALVERT CUFFS NUCLEAR POWER PLANT LU$$Y MARYLAND 20657 November 10,1987 FCM 87-230

U. S. Nuclear. Regulatory Commission Region 1 631 Park Avenue King of Prussia,.PA 19406 ATTENTION:

Mr. W. T. Russell -

Regional Administrator

SUBJECT:

Calvert Cliffs Nuclear Power Plant 3

Unit No. 2; Docket No. 50-318 Reoort of Startuo 'Testine for Cvele 8

REFERENCES:

(a)' Mr. J. A. Tiernan (BG&E), to Mr. W. T. Russell (NRC), letter dated August 13, 1987, Report of Startup Testing for Cycle 8 Gentlemen:

A typographical error was discovered in Table 2 of Reference (a). The measured zero po'wer isothermal temperature coefficient was reported as +.020 x10-4 delta rho / F, 0

10-4 delta rho / F.

All analytical work and and should be corrected to +0.20 x review / acceptance criteria were performed using the correct measured value.

Very truly yours,

~

Principal Engineer uel Cycle Management JAM /JES/Imt cc:

D. A. Brune, Esquire J. E.

Silberg, Esquire R. A. Capra, NRC S. A.McNeil, NRC T. Foley/D. C. Trimble, NRC T. Magette, DNR

[

0

\\

8711180066 871110

/

PDR ADOCK 05000318:

P PDR