ML20236P454
| ML20236P454 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 07/07/1998 |
| From: | Bono H UNION ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| ULNRC-3858, NUDOCS 9807160345 | |
| Download: ML20236P454 (3) | |
Text
_______ ____ ________ _ - - -
~
r Union Electne Po 1%x 620 Cafeway hant Fulton, MO 65251 July 7,1998 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Step PI-137 Washington, DC 20555-000)
ULNRC-3858 hb
'P//ggg Gentlemen:
UE oOCxET NUMuER s0 483 CALLAWAY PLANT UNIT I UNION ELECTRIC CO.
FACILITY OPERATING LICENSE NPF-30 COMMITMENT TRACxlNG SYSTEM SUMM ARY OF COMMITMENT REVISIONS AND del.ETIONS Fuel Cycle Nine The enclosed summary of Commitment deletions for fuel cycle nine is submitted pursuant to Callaway Plant procedure APA-ZZ-00540, Commitment Management Program. The deleted Commitments enclosed meet the criteria for reporting on a refuel cycle basis as described in the Nuclear Energy Institute's Guidelines for Managing NRC Commitments.
If you should have any questions on the above or attached, please contact Jim Nurrenbern at (573) 676-8826.
. kl N
H. D. Bono Supervising Engineer, QA Regulatory Support ilDB/JDN/tmw
- - c, 0 0 Enclosure I ' ' ' ' ' " '
i 9807160345 980707 PDR ADOCK 05000483 P
PDR e subsnitary af Amoren Corporation
r ULNRC-3858 July 9,1998 Page 2
]
l l
U. S. Nuclear Regulatory Commission (Original and I copy) cc:
Attn: Document Control Desk Mail Stop PI-137 Washington, DC 20555-0001 Mr. Ellis W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064 Senior Resident inspector Callaway Resident Oflice U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Ms. Kristine M. Thomas (2 copies)
Licensing Project Manager, Callaway Plant Oflice of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 13E16 Washington, DC 20555-2738 Manager, Electric Department Missouri Public Service Commission PO Box 360 JetTerson City, MO 65102 Mr. Thomas A. Baxter Shaw, Pittman, Potts, & Trowbridge 2300 N. Street N.W.
Washington, DC 20037 l-
e a
Er. closure ULNRC-3858 Page1 7/09/1998 AmerenUE has endorsed the Nuclear Energy Institute's Guideline for.Wnaging NRC Commitments. The Guideline has been incorporated into Callaway procedure APA-ZZ-00540, Commitment Management Program. The following Callaway Commitments deleted between refuel eight, November,1996 and refuel nine, May, 1998 meet the criteria of the NEl Guideline for those Commitments deleted or revised requiring NRC notification within the next refuel outage interval summary report.
CTSN 41866 and 41885. These Commitments incorporate requirements from the Callaway Plant Process Control Program for the solidification of radioactive waste. These Commitments may be deleted because Callaway Plant no longer solidifies radioactive waste.
CTSN 43262. This Commitment was made to ensure the requirements of NRC Generic Letter 95-07 were completed. Pursuant to GL 95-07, the evaluation of safety related power operated gate valves potentially susceptible to thermal binding and pressure locking has been completed. This Commitment may be deleted as all the requirements associated with GL 95-07 are complete.
l