ML20236N896

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-443/98-03 on 980602-04.No Violations Noted.Overall Performance of Emergency Response Organization Was Sufficient to Demonstrate W/Reasonable Assurance That Onsite Emergency Plans,Adequate
ML20236N896
Person / Time
Site: Seabrook 
Issue date: 07/09/1998
From: Wiggins J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Feigenbaum T, Harpster T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
Shared Package
ML20236N899 List:
References
50-443-98-03, 50-443-98-3, NUDOCS 9807160048
Download: ML20236N896 (3)


See also: IR 05000443/1998003

Text

_ _ - - - - _

--

- - - - - - - - -

- - - - - -

.

July 9, 1998

l

Mr. Ted C. Feigenbaum

Executive Vice President and Chief Nuclear Officer

Seabrook Station

North Atlantic Energy Service Corporation

c/o Mr. Terry L. Harpster

P.O. Box 300

Seabrook, NH 03874

SUBJECT:

NRC-EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION

REPORT NO. 50-443/98-03

Dear Mr. Feigenbaum:

The enclosed report documents an inspection for public health and safety, led by

Mr. D. Silk at Seabrook, New Hampshire. The inspection evaluated the performance of

your emergency response organization during the June 3,1998, Seabrook Station full-

participation exercise. The inspectors discussed the findings of this inspection with your

staff on June 4,1998.

Based on the results of this inspection, it was determined that the overall performance of

the emergency response organization was sufficient to demonstrate with reasonable

assurance that onsite emergency plans are adequate and that your organization is capable

of implementing them. Simulated events were accurately diagnosed, emergency

declarations were timely and accurate, offsite agencies were notified in a timely manner

and protective action recommendations were appropriate. However, your organization

could have been more aggressive in pursuing assessment and mitigation strategies during

the exercise. As such, an exercise weakness was identified pertaining to the delay in

efforts to assess and mitigate the simulated release through the stuck open steam

generator safety relief valve. Your post-exercise critique process was assessed as very

good as your staff was appropriately self-critical. No violations of NRC requirements were

identified. No response to this letter is necessary.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

ORIGINAL SIGNED BY:

9807160048 980709

~

f

gDR

ADOCK 05000443

James T. Wiggins, Director

1

PDR

Division of Reactor Safety

Docket No.

50-443

Enclosure:

Inspection Report No. 50-443/98-03

f

I

s

_

.

. .

T. Feigenbaum

2

cc w/ encl:

B. D. Kenyon, President - Nuclear Group

J.' S. Streeter, Recovery Officer - Nuclear Oversight

SN. A. DiProfio, Station Director - Seabrook Station

R. E. Hickok, Nuclear Training Manager - Seabrook Station

D. E. Carriere, Director, Production Services

L. M. Cuoco, Senior Nuclear Counsel -

W. Fogg, Director, New Hampshire Office of Emergency Management

D. McElhinney, RAC Chairman, FEMA Rl, Boston, Mass

R. Backus, Esquire, Backus, Meyer and Solomon, New Hampshire

D. Brown-Couture, Director, Nuclear Safety, Massachusetts Emergency

j

Management Agency

>

F. W. Getman, Jr., Vice President and General Counsel- Great Bay Power

Corporation

,

R. Hallisey, Director, Dept. of Public Health, Commonwealth of Massachusetts

l

Seacoast Anti-Pollution League

D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire

S. Comley, Executive Director, We the People of the United States

i

W. Meinert, Nuclear Engineer

L.- A. Elisa 11, Regional Director, FEMA RI (EP Exercise & EP inspection Reports)

i

l

I

I

L

l

L

L

!

t...

_

_

. _ . _ _ _ _ _

_._._.__._.______...__.__________________.__________________E

_ _ _ _ _ _ ,_ - - - - __

_

--

..

I

l

T. Feigenbaum .

3

Distribution w/ encl:

Region I Docket Room (with concurrences)

PUBLIC

Nuclear Safety Information Center (NSIC)

NRC Resident inspector

H. Miller, RA/W. Axelson, DRA

C. Cowgill, DRP

J

R. Summers, DRP

'

C. O'Daniell, DRP

J. Wiggins, DRS

L. Nicholson, DRS

C. Miskey, DRS (2)

Distribution w/ encl: (Via E-Mail)

B. McCabe, OEDO

C. Thomas, PD l-3, NRR (COT)

J. Harrison, PD l-3, NRR

R. Correia, NRR (RPC)

F. Talbot, NRR

D. Screnci, PAO, ORA

' D. Barss, NRR

'

inspection Program Branch, NRR (IPAS)

{

DOCDESK

,

DOCUMENT NAME: G:\\EP&SB\\ SILK \\ SEA 9803. INS

Ta receive a copy of this document, Bruscate in the box: "C" = Copy without attachment / enclosure

"E" = Copy with attachment / enclosure

  • N'=

No copy

g

,

OFFICE

Rl/DRS

g Bl/DRPg

Rl/DRS

Al 9

RI/DRS

l

l

NAME

DSilk (>bb% CCowgill 'j(g\\W MModes \\\\\\

JUiggins Q/

DATE

06/29/98

V

D6i i55 i@ ': 07/%/98

7/6)/98

07/ /98

'

OFFICIAL RECORD COPY