ML20236N850
| ML20236N850 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 06/22/1987 |
| From: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20236N852 | List: |
| References | |
| P-87227, NUDOCS 8708120132 | |
| Download: ML20236N850 (2) | |
Text
W G rubiic service-
- < =
P.O. Box 840 Denver, CO 80201- 0840 June 22, 1987 R.O. WILLIAMS, JR.
Fort St. Vrain VICE PRESIDENT Unit No. 1 NUCLEAR OPERATIONS P-87227 NOTE:
This transmittal contains Emergency Preparedness exercise information that should not be released to the Public Document Room before August 7, 19 K U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Docket No. 50-267
SUBJECT:
FOSAVEX-87 SCENARIO SUBMITTAL
REFERENCE:
NRC Letter, Collins to Lee, dated 2/9/84 (G-84049)
Gentlemen:
Enclosed please find one copy of the detailed scenario for the 1987 Fort St. Vrain Radiological Emergency Exercise (FOSAVEX-87). This is being submitted in accordance with the 45-day schedule identified in the referenced letter.
The exercise will be a full-scale exercise with full participation by State and Local agencies. The exercise will involve a radiological l
release of such magnitude that a General Emergency should be declared l
and analysis of Ingestion Pathway effects should take place.
Please note that as in past exercises, the primary coolant inventory will be increased by several orders of magnitude to attain the release, and that no such release can feasibly occur with the actual primary coolant inventory available in the Fort St. Vrain core.
4 f] h %
gemu 5%r F
m
_ e
--W"""
P-87227 June 22, 1987 Two copies of the F0SAVEX-87 scenario have been sent to NRC, Region IV, and two copies to Battelle Pacific Northwest Laboratories as directed by Mr. J.B. Baird of the NRC, Region IV staff. Any minor k
changes to the scenario as submitted, will either be sent to the addressees or, depending on the time frame, will be immediately presented to, and discussed with, the observation team upon their arrival onsite.
If you have any comments or questions, please contact Mr. M.H. Holmes at (303) 480-6960.
I Sincerely (
dk R.O. Williams, Jr.
Vice President, Nuclear Operations cc:
Regional Administrator, Region IV ATTN:
Mr. J.E. Gagliardo, Chief Reactor Projects Branch (two copies)
Mr. R.E. Farrell Senior Resident Inspector Fort St. Vrain (cover letter only)
Battelle Pacific Northwest Laboratories 2955 George Washington Way Richland, WA.
99352 ATTN:
Mr. James D. Jamison (two copies)
FEMA, Region VIII (one copy)
R0W/ojc
Enclosure:
FOSAVEX-87 Scenario b
-....,,_a
,,.e
~= w f