ML20236N812
| ML20236N812 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1987 |
| From: | Neron G, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| MP-11090, NUDOCS 8711170018 | |
| Download: ML20236N812 (5) | |
Text
- _. _
j
-t AVERAGE DAILY UNIT POWER LEVEL
]
1 DOCKET NO. 50-336 l
I UNIT Millstone Unit 2 l
l DATE 871109 COMPLETED BY G. Neron TELEPHONE (203) 447-1791 l
Extension 4417 l
MONTH OCTOBER 1987 1
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) j I
1 857 17 853 2
858 18 841 I
]
3 831 19 854 4
857 20 854 f
1 5
857 21 852 6
859 22 853 7
858 23 853 8
859 24 854 9
858 25 889 10 859 26 851 11 859 27 850 l
12 857 28 850 l
13 857 29 850 l
14 856 30 849 i
15 854 31 851 16 854 l
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day 1
in the reporting month.
Compute to the nearest whole megawatt.
j l
l0@}05000336 B71031 Dq R
i PDR Q
)
$,A 1
i l
u----------
OPERATING DATA REPORT DOCKET NO. 50-336 DATE 871109 COMPLETED BY E Neron TELEPHONE (203) 447-1791 Extension 4417 OPERATING STATUS i
1.
Unit Name: Millstone Unit 2 l Notes: Items 21 and 22 l
i 2.
Reporting Period: October, 1987 l
cumulative are weighted l 3.
Licensed Thermal Power (MWt): 2700 l
averages. Unit operated l J
4.
Nameplate Rating (Gross MWe): 909 l
at 2560 MW thermal prior l 5.
Design Electrical Rating (Net MWe): 870 l
to its uprating to the l
6.
Maximum Dependable Capacity (Gross MWe):888.751 current 2700 MWth power l 7.
Maximum Dependable Capacity (Net MWe): 857.25 l level.
I 8.
If Changes Occur in Capacity Ratings (1tems Number 3 Through 7)
Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, If Any (Net MWe): N/A 10.
Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 745 7,296 103,872 12.
Number Of Hours Reactor Was Critical 745.0 6,817.3 75,955.6 13.
Reactor Reserve Shutdown Hours 0
0 2,205.5 i
14.
Hours Generator On-Line 745.0 6,765.4 71,838.3
)
15.
Unit Reserve Shutdown Hours 0
0 468.2 l
16.
Gross Thermal Energy Generated (MWH) 2,008,169 18,046,978 182,794,864
)
17.
Gross Elec. Energy Generated (MWH) 657,700 5,942,100 59,659,579 18.
Net Electrical Energy Generated (MWH) 634,583 5,725,190 57,209,197 19.
Unit Service Factor 100.0 92.7 69.2 20.
Unit Availability Factor 100.0 92.7 69.6 21.
Unit Capacity Factor (Using MDC Net) 99.4 91.5 65.0 22.
Unit Capacity Factor (Using DER Net) 97.9 90.2 64.0 23.
Unit Forced Outage Rate 0.0
- 7. 3 15.4 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Scheduled date for End of Cycle Refuel Outage: 1/2/88; Duration: Approximately 8 weeks 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved-INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A-
eo u
)
S rt u ro R
r c
t rE e
17 one snoL m
91 C oR nof(
a 74 i
Ii S
2 14
&tt t st) cn
- at r1 e
7 n eAe reo6 n
n4 o s
v G a e p1 1
o o4i u
e ph e0 6t r
s a
r t eSR -
t 3 s9e) n C
P i r G
i 3l 0 N3 e bP ytE b
1 0t i
rnR i
l 1
0i 2 x h rt eU h
5M 7 G(E xonvN x
8 EfEE(
E
.EEYE t
5 OMTBN n
4 NAA O
e NDDH n5 T
EP oe m
n ET TE pd amho) n KI EL mo roti0i CN LE oC mcrnt OU PT C
aSf oc=l D
M r
mu O
ccd d nx C
Si esd oE m4 t uuRi(
ee l l ano t
aamiirar td S
so d uuot vere N
yC onnt newuh O
S h aauoroDt tMMAC pP (O I
T 7
e-C 8
M1234 5
U 9
D 1
e 3
E e
R stt R
nnr R
E eeo E
E B
cvp N
W O
iE e O
O T
L R
N P
C O
D n
N H
3 o
A T
r i
N f
o t
S O
ogt a
N M
nc n
W di a i
O T
ot e m
D R
htR a
T O
t u x
U P
eh n E
H E
MS w S
R o
)
e
)
D n
s n
T i
n i
I a
e a
N 2
l c
l U
n p
ni p
o x
oL x
s E
i.
E a
(t t&
(
e
.s c
R ee ig r
rT rn o
u ti r
l r snern i o eivEi a
R ai. a n
F e rtl l o) c yT a a p i s t ngr rnx t r nanort oE au enit osi(
ro mel atit uH pt el anar D(
ninuurire ouif gemeh s q a e e pd pt l
aEMRROAOO e
e-p RABCDEFGH y
T 2
de l
d u ed e
ce t
rh a
oc D
FS FS o
N 1
a
1 REFUELING INFORMATION REQUEST l
1.
Name of facility:
Millstone 2-2.
Scheduled date for next refueling shutdown:
January 2, 1988 3.
Schedule.date for' restart following refueling: March 1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
None at this time i
\\
i 5.
Scheduled date(s) for submitting ~ licensing action and supporting information:
None at this time 6.
Important licensing considerations associated with refueling, e.g.,
j new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
None 1
7.
The number of fuel assemblies (a) in the core and (b) in the spent l
fuel storage pool:
)
(a) In Core: (a) 217 (b) 512 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
I Currently 1277 3
9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1994, Spent Fuel Pool-Full Core off load capacity is reached 1998, Core Full Spent Fuel Pool 2009, Spent Fuel Pool, Full Core off load capacity is reached-contingent upon license approval to store consolidated fuel.
1 1
g 4
KORTHEAST UTILITIES cenerai Omces seiden street. Beriin. Connecticut UsisN2 Nits $iNcc
~
t P.O. BOX 270 -
.4
.e en..na acata cw'a HARTFORD, CONNECTICUT 061410270
[ [ $ '[U,,
[ f,' *.',
2 (203) 665-5000 k
L' J
l I
a November 10, 1987 MP-11090 Re:
10CFR50.71(a) 1 U.S. Nuclear. Regulatory Commission Document Control Desk j
Washington, D. C. 20555
'(
.]
Reference:
Facility Operating License No. DPR-65 j
Docket No. 50-336 i
j
Dear Sir.:
i 4
This letter is forwarded to provide the report of operating and. shutdown experience relating to Millstone Unit 2 Monthly Operating Report 87-10 in accordance with Appendix _A Technical Specifications, Section 6.9.1.3.
3 One additional copy of the report is enclosed.
l Very truly yours, j
NORTHEAST NUCLEAR ENERGY COMPANY tl@fkMtf-Ste hen E. Scace Station Superintendent Millstone Nuclear Power. Station SES/GN:faj Regional Administrator, Office of Inspection and Enforcement, Region I-cc:
Director, Office of Inspection and Enforcement, Washington', D. C. (10)
Director, Office of Resource Management William Raymond, Senior Resident Inspector d
$o 7
- _ _ - -