Ack Receipt of Re Meeting Scheduled for 870727 W/ Util to Acquaint NRC W/Technical Details Re Spent Fuel Rod Consolidation Program at Plant.Location of Meeting Cannot Be Changed to St Paul,Mn Due to Time & Budget Constraints
ML20236M786
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 08/06/1987
From: Wigginton D
Office of Nuclear Reactor Regulation
To: Ogren P
MINNESOTA, STATE OF
References
NUDOCS 8708110235
Download: ML20236M786 (2)


Text

_ _ _ _

AUG 0 61987 Honorable Paul Anders Ogren DISTRIBUTION:

Minnesota House of Representatives LDocketFiles PKreutzer I

State Office Btt', ding DWigginton DMossburg, PMAS St. Paul, Minnesota 55155 GHolahan NRC PDR DDilanni Local PDR

Dear Mr. Ogren:

OGC-Bethesda Thank you for your letter of July 24, 1987 regarding the meeting scheduled on Friday, August 14, 1987, with Northern States Power Company (the licensee). The meeting will serve to acquaint the NRC of the technical details associated with a proposed demonstration program for consolidating the spent fuel at the Prairie Island Nuclear Generating Plant. The meeting was requested by the licensee to inform the NRC of the planning phase of the demonstration program. A copy of the meeting notice with attached agenda is enclosed.

In regard to a change of the meeting place from Bethesda, Maryland, to St. Paul, Minnesota, we are unable to meet this request at this time because of time and budget constraints. We anticipate the meeting will cover highly technical details (i.e., structural and system analysis, physics, etc.) related to the spent fuel rod consolidation program and that a large complement of the NRC staff will be involved. This issue is being treated in the same manner as other licensing issues with potential safety implications. We plan to place all of the licensee's preliminary submittals, meeting handouts, and the meeting summary on the Prairie Island docket, thus making all the information received by NRC regarding this matter available to the general public at the NRC public document I

i room located in Washington, DC and the local public document room in the Environmental Conservation Library, Minneapolis Public Library, 300 Nicollet Mall, Minneapolis, Minnesota.

Since you expressed interest in this matter, we will furnish your office with a copy of all information received by NRC including meeting summaries.

l In the meantime, if you have further questions, feel free to contact the l

Prairie Island Project Manager, Dominic C. Dilanni (301-492-7743).

Sincerely,

/s/

David L. Wigginton, Acting Director kDR hhhkh[hhhh82 Project Directorate III-3 P

PDR Division of Reactor Projects l

Office of Nuclear Reactor Regulation j

l i

l

Enclosure:

As stated 1

cc: See next page

  • See previous concurrence I

S b/A s

Office:

  • LA/PDIII-3
  • PM/PDIII-3
  • 0GC States Progfam PD/P III-3 l

l Surname:

PKreutzer DDilanni/tg SSwartz DWigginton

]

Date:

07/1?/87 07/29/87 07/30/87 08/05/87 08/f/87 i

4l 6

)

s-Mr. D. M. Musolf Prairie. Island Nuclear Generating Northern States Power Company Plant cc:

Gerald Charnoff, Esq.

Mr. R. Anderson Shaw, Pittman, Potts and Trowbridge Minnesota Institute of Concern 2300 N Street, N.W.

for Public Health Washington, DC 20037 HCR 84 PO Box 1397B Walker, Minnesota 56484 Dr. J. W. Ferman Mr. C. Laszewski Minnesota Pollution Control Agency St. Paul Pioneer Press l

520 Lafayette Road 345 Cedar Street l

St. Paul, MN 55155 St. Paul, Minnesota 55104 Mr. E. L. Watzl, Plant Manager Joseph Campbell', Sr.

Prairie Island Nuclear Generating Plant Prairie Island Community Council l

Northern States Power Company 5750 Sturgeon Lake Rd.

Route 2 Welch, MN 55089 Welch, Minnesota 55089 k

t Jocelyn F. Olson, Esq.

Dr. Raymond W. Throm i

g Special Assistant Attorney General Director of Environmental Health

~"

L J-Minnesota Pollution Control Agency Minnesota Department of Health j

'r 1935 W. County Road, B2 717 Delware Street SE j

l Roseville, Minnesota 55113 P.O. Box 9441 1

'y Minneapolis, Minn.

55440 U.S. Nuclear Regulatory Commission Resident Inspector's Office 1719 Wakonade Drive East L

Welch, Minnesota 55089-Regional Administrator, Region III U.S. Nuclear Regulatory Comission

~

Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. William Miller, Auditor i

Goodhue County Courthouse l

Red Wing, Minnesota 55066 j

I l

i v"

. fl, q.

'=..q,.,,

. y...

..y z,$Q.;_ ;.

"[.ggf:llh = ?g.CQ,5y yu y.

EC.$ c.i' xm.

x#

- UNITED STATES

.c.dU e : C

'8 fI $,(g.....d Mg ;.t.

  • M, y. s%#c'yf f.M NUCLEAR REGULATORY COMMISSION

)

n!

wAaHWGTON,S.C.30855

"^

p-

--r m.

JUL 2 71987 C

l l

4* *

  • Docket No. 50-282 and 50-306 MEMORANDUM FOR:

David L. Wigginton, Acting Director Project Directorate III-3 Division of Reactor Projects FRON:

.Dominic C. D11 anni. Project Manager..

Project Directorate III-3 Division of Reactor Projects

SUBJECT:

FORTHCOMING MEETING WITH NORTHERN STATES POWER C(MPANY REGARDING THE DEMONSTRATION OF SPENT FUEL ROD

~

s

, CONSOLIDATION PROGRAM

~,

y.

DMik & TIME:

~

f August 14, 1987 a

t 8:00 AM - 5:00 PM

.h

]

LOCATION:

Room P-ll4, Phillips Bldg.

t

-Bethesda, MD PURPOSE:

Northern States Power Company will describe a proposed

)

demonstration program for spent fuel rod consolidation for the spent fuel assemblies existing'at:the Prairielsland Nuclear Gererati.ng Plant. The meetingiha

-ty"thei licensea Writhe purpose 4f keepM.s been reques.ted g the WC

'a informed on the planning phase of the demonstration program and a copy of the meeting agenda is enclosed.

~.

Participants:

NRC

~

NSP i

Hansraj Ashar Laura McCarten Dick Clark Tom Parker

\\

Tim Collins 1

Dom Dilanni Dave Jeng Westinghouse Nu Tech Elmer Bassler Dr. J. K. Smith Bill Boyd Wayne Benniger Bob Laubham oQ mLKy:

Dominic C. DiIanni, Project Manager

/ " ' b l l ' _.

9,. 94'?

I Project Directorate III-3 U I /

3 :p Division of Reactor Projects

-l 7

Meetings between ERC technical staff and applicants. or licensees.areppen 4

fodinterestedmem6ers,ofthepublic.-petitioners interveners or-ether

n '

1 o

~ ~ - ~ --

7 Mr. D. M. Musolf Prairie Island Nuclear Generating Horthern States Power Company Plant ec:

Gerald Charnoff, Esq.

Mr. R. Anderson Shaw, Pittman, Potts and Trowbridge Minnesota Institute of Concern 2300 N Street, N.W.

for Public Health j

Washington, DC 20037 HCR 84 PO Box 1397B Walker, Minnesota 56484 Dr. J. W. Ferman Mr. C. Laszewski Minnesota Pollution Control Agency St. Paul Pioneer Press 520 Lafayette Road 345 Cedar Street St. Paul, MN 55155 St. Paul, Minnesota 55104 Mr. E. L. Watzl, Plant Manager Joseph Campbell, Sr.

Prairie Island Nuclear Generating Plant Prairie Island Community Council Northern States Power Company 5750 Sturgeon Lake Rd.

Route 2 Welch, MN 55089

(

Welch, Minnesota 55089 t

Y Jocelyn F. Olson, Esq.

j F

Special Assistant Attorney General Minnesota Pollution Control Agency

~

1935 W. County Road, B2 j

y Roseville, Minnesota 55113 U.S. Nuclear Regulatory Comission Resident Inspector's Office 1719 Wakonade Drive East Welch, Minnesota 55089 Regional Administrator, Region III O.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. William Miller, Auditor Goodhue County Courthouse Red Wing, Minnesota 55066 O

i

l t, l[

~' "

i) s

)

NSP/j!iRC INFORMATIONAL. MEETING ON PRAIRIE ISLAND SPENT FUEL ROD CONSOLIDATION PROGRAM BATE: AUGUST 14, 1987 TIME: 8:00 AM LOCATION: Room P-114, Phillips Bldg.

-I.

Introduction Tom Parker NSP II, Project Overview Laura McCarten NSF l

III. Process Description Elmer Bassler W

e.

IV. Analysis Critica ity Bill Boyd

'W f,

Therm 6-Hydraulic Bob Laubham W

Accident Wayne Henniger W

Structural Dr. J. A. Smith NUTECH y

V.

Conclusion Laura McCarten NSP e

--