Georgia Power Company ;
d
?.l Routs 2, Box 299A
}4 Waynesboro, Georgia 30830 Telephone 404 554-9961 g
- 404 724 8114 Southern Company Services, Inc Post Office Box 2625 -
. Birmingham, Alabama 35202 3
l*
Telephone 205 870 6011 Vogtle Proj.ect
]
i November 11, 1987 i
l
(
United States' Nuclear Regulatory Commission' File: X7BC35
~ ATTN:. Document. Control Desk Log: GN-1413 I
Washington, D.C.
REF:- (1) Hiller (NRC) to Conway (GPC), ICSB Site Visit, dated 11/25/86 I'
(2) Bailey (GPC) to Donton (NRC), GN-1218, dated 12/12/86 (3) Bailey (GPC) to Denton (NRC), CN-1293, dated 01/06/87 i.
NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 I
V0GTLE ELECTRIC GENERATING PLANT UNIT 2 l
REOUEST FOR ADDITIONAL INFORMATION: BATTERY ROOM SPRAY j
Gentlemen:
During the NRC ICSB site visit a potential' water spray hazard was identified (reference 1) in the safety-related battery rooms. Water spray from a crack in the eyewash / shower lines could cause the safety-related batteries to be j
' degraded..A design fix was proposed (reference 2) by installing insulator l
-wrap with two layers of a metallic sheath on the eyewash / shower lines.
The metallic sheath ~ joints were staggered such that no direct leakage path would l
be created.
This design fix was accepted by your staff in SSER 5 paragraph
~
8.3.2.
A. commitment was also made (reference 3) to install a like modification on Unit 2.
i A walkdown was performed by GPC on Unit 2 which verified the installation of the battery room spray protection in accordance with SSER 5 paragraph 8.3.2 and as ' described in reference 2.
In addition, as is the case for Unit 1, the walkdown confirmed that the lines in auestion do not pass over the batteries.
3 If your staff reauires any additional information, please do not hesitate to contact me.
I Sincerely, j
i 8
J. A. Bailey l
Project Licensing Manager i
8711130168 871111 l
ADOCK 050 g 4 D
PDR E
g
f
-l k -
' ~ '
' United States Nuclear Regulatory Commission L Filet X7BC35 l4 November 10,1987 L Logi. GN-1413 l
Page 2.
l l
cJAB/KWK/1g NRC. Regional Administrator.
xc NRC. Resident Inspector M.JA. Miller (2) l R. E. Conway'-
.J. P. O'Reilly~
.]
P. D. Rice
--G..Bockhold, Jr.'
-j
'L..T. Gucwa.
j R. A. Thomas R. W. McManus
~!
R.' Goddard,, Esquire l
B. W. Churchill, Esquire 1
J. E. Joiner, Esquire l
Vogtle Project File i
.1323V l
l.
l I
1 1
t l
i I
-