Advises That Walkdown Performed to Verify Installation of Battery Room Spray Protection Per Sser 5,Paragraph 8.3.2,as Described in Util .Walkdown Confirmed That Lines in Question,As in Unit 1,do Not Pass Over Batteries
ML20236M536
Person / Time
Site: Vogtle  
Issue date: 11/11/1987
From: Bailey J
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1413, NUDOCS 8711130168
Download: ML20236M536 (2)


Text

_._

)

Georgia Power Company ;

d

?.l Routs 2, Box 299A

}4 Waynesboro, Georgia 30830 Telephone 404 554-9961 g

- 404 724 8114 Southern Company Services, Inc Post Office Box 2625 -

. Birmingham, Alabama 35202 3

l*

Telephone 205 870 6011 Vogtle Proj.ect

]

i November 11, 1987 i

l

(

United States' Nuclear Regulatory Commission' File: X7BC35

~ ATTN:. Document. Control Desk Log: GN-1413 I

Washington, D.C.

REF:- (1) Hiller (NRC) to Conway (GPC), ICSB Site Visit, dated 11/25/86 I'

(2) Bailey (GPC) to Donton (NRC), GN-1218, dated 12/12/86 (3) Bailey (GPC) to Denton (NRC), CN-1293, dated 01/06/87 i.

NRC DOCKET NUMBER 50-425 CONSTRUCTION PERMIT NUMBER CPPR-109 I

V0GTLE ELECTRIC GENERATING PLANT UNIT 2 l

REOUEST FOR ADDITIONAL INFORMATION: BATTERY ROOM SPRAY j

Gentlemen:

During the NRC ICSB site visit a potential' water spray hazard was identified (reference 1) in the safety-related battery rooms. Water spray from a crack in the eyewash / shower lines could cause the safety-related batteries to be j

' degraded..A design fix was proposed (reference 2) by installing insulator l

-wrap with two layers of a metallic sheath on the eyewash / shower lines.

The metallic sheath ~ joints were staggered such that no direct leakage path would l

be created.

This design fix was accepted by your staff in SSER 5 paragraph

~

8.3.2.

A. commitment was also made (reference 3) to install a like modification on Unit 2.

i A walkdown was performed by GPC on Unit 2 which verified the installation of the battery room spray protection in accordance with SSER 5 paragraph 8.3.2 and as ' described in reference 2.

In addition, as is the case for Unit 1, the walkdown confirmed that the lines in auestion do not pass over the batteries.

3 If your staff reauires any additional information, please do not hesitate to contact me.

I Sincerely, j

i 8

J. A. Bailey l

Project Licensing Manager i

8711130168 871111 l

ADOCK 050 g 4 D

PDR E

g

f

-l k -

' ~ '

' United States Nuclear Regulatory Commission L Filet X7BC35 l4 November 10,1987 L Logi. GN-1413 l

Page 2.

l l

cJAB/KWK/1g NRC. Regional Administrator.

xc NRC. Resident Inspector M.JA. Miller (2) l R. E. Conway'-

.J. P. O'Reilly~

.]

P. D. Rice

--G..Bockhold, Jr.'

-j

'L..T. Gucwa.

j R. A. Thomas R. W. McManus

~!

R.' Goddard,, Esquire l

B. W. Churchill, Esquire 1

J. E. Joiner, Esquire l

Vogtle Project File i