ML20236M044
| ML20236M044 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 11/05/1987 |
| From: | Alden W PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20236M046 | List: |
| References | |
| NUDOCS 8711120018 | |
| Download: ML20236M044 (2) | |
Text
,
n M.'
s 1
PHILADELPHIA ELECTRIC COMPANY i
23ol M ARKET STREET
- P.O. BOX 8699 PHILADELPHIA A. PA.19101
)
(215)8414000
' November 5, 1987 Docket No. 50-352 i
Director.
Office of Resource Management 4
U.S. Nuclear Regulatory Commission Washington, DC 20555 a
l Attention:
Document Control Desk j
I
SUBJECT:
Revision to the August and September, 1987 Limerick Generating Station Monthly Operating Report Gentlemen:
l Enclosed are revisions to the Limerick Generating Station Monthly Operating Reports for the months of August and l
September, 1987.
The August and September reports'were submitted
{
pursuant to Technical Specification 6.9.1.6 on September'15, 1987 j
and October 19, 1987 respectively.
The revised reports are being submitted to correct a calculation error in determining the number-of hours the reactor was critical (line 12) for the month of August..As a result,.the year-to-date and cumulative reactor critical hours figures for 1
August and September required adjusting to reflect the change.
The change is identified by a vertical bar in the right margin.
We regret any inconveniences these errors-may have' Very truly yours, f
. M. Al en 8711120018 871105 Engineer-In-Charge gDR ADOCK O g2 Licensing Section Nuclear Support Department
. Attachment