ML20236M044

From kanterella
Jump to navigation Jump to search
Forwards Rev to Facility Monthly Operating Repts for Aug & Sept 1987.Repts Being Submitted to Correct Calculation Error in Determining Number of Hours Reactor Critical for Aug.W/O Sept Rept
ML20236M044
Person / Time
Site: Limerick Constellation icon.png
Issue date: 11/05/1987
From: Alden W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236M046 List:
References
NUDOCS 8711120018
Download: ML20236M044 (2)


Text

,

n M.'

s 1

PHILADELPHIA ELECTRIC COMPANY i

23ol M ARKET STREET

P.O. BOX 8699 PHILADELPHIA A. PA.19101

)

(215)8414000

' November 5, 1987 Docket No. 50-352 i

Director.

Office of Resource Management 4

U.S. Nuclear Regulatory Commission Washington, DC 20555 a

l Attention:

Document Control Desk j

I

SUBJECT:

Revision to the August and September, 1987 Limerick Generating Station Monthly Operating Report Gentlemen:

l Enclosed are revisions to the Limerick Generating Station Monthly Operating Reports for the months of August and l

September, 1987.

The August and September reports'were submitted

{

pursuant to Technical Specification 6.9.1.6 on September'15, 1987 j

and October 19, 1987 respectively.

The revised reports are being submitted to correct a calculation error in determining the number-of hours the reactor was critical (line 12) for the month of August..As a result,.the year-to-date and cumulative reactor critical hours figures for 1

August and September required adjusting to reflect the change.

The change is identified by a vertical bar in the right margin.

We regret any inconveniences these errors-may have' Very truly yours, f

. M. Al en 8711120018 871105 Engineer-In-Charge gDR ADOCK O g2 Licensing Section Nuclear Support Department

. Attachment

,,9 l-

_.