Safety Evaluation Granting Request for Relief RR-2-23,from Performing ASME Code,Section XI Volumetric Coverage Requirements for SG nozzle-to-safe End Welds & Associated Safe end-to-pipe Welds During Third 10-yr ISI Interval
ML20236L606
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 07/08/1998
From: Mclellan T
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20236L610 List:
References
NUDOCS 9807130092
Download: ML20236L606 (5)


Text

- __ _ - ________ _ ___ _ -_ _____-_ -________ __ _ _ ___

w.q g

t UNITED STATES g

j NUCLEAR REGULATORY COMMISSION p

2 WASHINGTON, D.C. 20666-0001 Y..W.FR.o$

SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION ON THE THIRD 10-YEAR INTERVAL INSERVICE INSPECTION REQUEST FOR RELIEF RR-2-23 WISCONSIN ELECTRIC POWER COMPANY POINT BEACH NUCLEAR PLANT. UNIT 2 DOCKET NO. 50-301

1.0 INTRODUCTION

The Technical Specifications for the Point Beach Nuclear Power Plant, Units 1 and 2, state that the inservice inspection (ISI) of the American Society of Mechanical Engineers (ASME) Code Class 1,2, and 3 components shall be performed in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable addenda as required by 10 CFR 50.55a(g),

except where specific written relief has been granted by the Commiss!on pursuant to 10 CFR 50.55a(g)(6)(i). Section 50.55a(a)(3) o' 10 CFR states that altematives to the requirements of paragraph (c) may be used when authorized by the NRC if (i) the proposed alternatives would provide an acceptab'e level of quality and safety, or (ii) compliance with the specified requirements would result in nardship or unusual difficulty without a compensatireg increase in the level of quality and safety.

Pursuant to 10 CFR 50.55a(g)(4), ASME Code Class 1,2, and 3 components (including supports) shall meet the requirements, except the design and access provisions and the preservice examination requirements, set forth in the ASME Code,Section XI, " Rules for 1

Inservice inspection of Nuclear Power Plant Components," to the extent practical within the limitations of design, geometry, and materials of construction of the components. The j

regulations r? quire that inservice examination of components and system pressure tests l

conducted during the first 10-year interval and subsequent intervals comply with the requndments in the latest edition and addenda of Section XI of the ASME Code incorporated by reference in 10 CFR 50.55a(b) 12 months prior to the start of the 120-month interval, subject to the limitations and modifications listed therein. The applicable ASME Code,Section XI, for the l

Point Beach Nuclear Power Plant third 10-year ISI interval is the 1986 Edition, no addenda.

The components (including supports) may meet the requirements set forth in subsequent editions and addenda of the ASME Code incorporated by reference in 10 CFR 50.55a(b) subject to the limitations and modifications listed therein and subject to Commission approval.

I Pursuant to 10 CFR 50.55a(g)(5)(iii), if the licensee determines that conformance with an examination requirement of Section XI of the ASME Code is impractical for its facility, 9807130092 980708 i

PDR ADOCK 05000301 Enclosure O

PDR I

l l

l

^

s 2

information shall be submitted to the Commission in support of that determination and a request.

made for relief from the ASME Code requirement. After evaluation of the determination, pursuant to 10 CFR 50.55a(g)(6)(l), the Commission may grant relief and may impose alternative requirements that are determined to be authorized by law, will not endanger life, j

property, or the common defense and security, and are otherwise in the public interest, giving due consideration to the buiden upon the licensee that could result if the requirements were imposed.

By letter dated October 16,1996, as supplemented on November 25,1997, January 27,1998, i

and April 9,1998, the licensee, Wisconsin Electric Power Company, submitted Request for I

Relief No. RR-2-23 from the requirements of the American Society of Mechanical Engineers I

(ASME) Code,Section XI. The (%tober 16,1996, submittal included four nozzle to safe-end welds, in a letter dated November 25,1997, the licensee added four nozzle safe-end to elbow welds to the request. On January 27,1998, WE submitted a letter correcting a date and

- superseding in entirety the November 25,1997, letter. Additional clarification was provided by a letter dated April 9,1998 (letter NPL 98-0258) responding to a Nuclear Regulatory j

Commission (NRC) request for additionalinformation. The staff has evaluated the information provided by the licensee in support of the lequest for relief in the following sections.

2.0 DISCUSSION Comoonent identification:

1 Class 1 Circumferentlal Piping Welds and Nozzle-to-Safe End Welds I,

Weld Nos.

RC-34-MRCL-Al-05 RC-36-MRCL-All-01A RC-34-MRCL-BI-05 RC-36-MRCL-Bil-01A RC-34-MRCL-Al-04R1 RC-34-MRCL-BI -04R1 RC-36-MRCL-All-01R1 RC-36-MRCL-Bli-01R1 Code:

The Code of record for the Point Beach Nuclear Plant, Unit 2, third 10-year inservice inspection (ISI) intervalis the 1986 Edition of Section XI of the ASME Boiler and Pressure Vessel Code.

j Code Requirement:

i Examination Category B-F, item B5.70, and Examination Category B-J, item B9.11, require l

100% surface and volumetric examination, as defined by Figure IWB-2500-8, for steam generator nozzle-to-safe end welds and Class 1 circumferential welds.

I 4

l

l' i

3 l-Altemate Requirement (as stated):

l The required surface examinations will be completed. The required volumetric examination will be completed to the extent practical.

Pursuant to 10 CFR 50.55a(g)(5)(iii), the licensee has requested relief for the following examination areas:

Cumulative Weld ID Description Coverage

  • Coverage RC-34-MRCL-Al-05 Safe end-to-S/G 44% Nonle side 86%.

Inlet nonle 100% Safe end side RC-36-MRCL-All-01A S/G outlet nonle-to-safe end RC-34-MRCL-Bl-05 Safe end-to-S/G inlet nonle RC-36-MRCL-Bil-01A S/G outlet nonle-to-safe end l

RC-34-MRCL-Al-04R1 Elbow-to-S/G inlet -

40% Two-direction 85%

nonle safe end 100% One-direction RC-34-MRCL-BI-04R1 Elbow-to-S/G inlet 17% Two-direction 70%

nonle safe end 100% One-direction RC-36-MRCL-All-01R1 S/G outlet nonle 36% Two-direction

' 84%

safe end to elbow 100% One-direction RC-36-MRCL-Bil-01R1 S/G outlet nozzle 30% Two-direction 82.5 %

safe end to elbow 100% One-direction "All welds received 100% surface examination and 100% coverage for the circumferential scans Reason for the Pronosed Altemate Rem!irement: (As stated)

PBNP Unit 2 replaced both the A and 3 Steam Generators during the U2R22 outage (Fall 1996). The examination of the components above have been examined by ultrasonic testing methods to the extent practical as required by the Code. Refracted longitudinal waves were used to perform the examination because of the acoustic l

properties of the materials involved. The use of refracted longihdinal waves prevents l.

the use of beam reflection to increase the examination volume.

V Due to the geometric changes in the nonle configuration (for welds 1 thru 4 above)

. complete coverage of the examination volume from the nonle side could not be

j 1

A 4

obtained. Coverage obtained was approximately 44% from the nonle side.

Complete coverage from the safe-end side was obtained. Therefore,44% of the weld volume received two-directional coverage and 100% of the weld received one-directional coverage. Similarly, for 5 thru 8 abcve the geometrical configuration of the piping and adjacent nonle to safe-end welds, complete coverage of the examination volume could not be obtained. The following weld examination volume coverage could be obtained:

Erm Area Coveraoe Obtained

5) RC-34-MRCL-Al-04R1 40% two-directional 100% one-directional
6) RC-34-MRCL-BI-04R1 17% two-directional 100% one-directional
7) RC-36-MRCL-All-01R1 36% two-directional 100% one-directional l
8) RC-36-MRCL-Bil-01 R1 30% two-directional 100% one-directional Altemative components could not be substituted for examination because this is a preservice examination requirement for the replacement steam generate s The welds were volumetrically examined utilizing radiographic techniques. ' acause of the piping and wall thickness, the source for the radiography must h:

aced in the center of the pipe. To duplicats this technique for inservice inspec' ?. significant exposure would be obtained. The radiation exposure in a steam ge.srator head near the nonle is estimated et 12 rem /hr. An entry to position a source holding fixture in

~ he nonle would take approximately 10 minutes. Therefore, the radiation exposure t

associated with performing radiography of one weld (neglecting exposure from other associated with the evolution) would be approximately 1.2 rem.

Since the radiation exposure associated with the examination technique is excessive, the proposed alternate is to perform the required volumetric examination utilizing ultrasonic exam! nation to the extent practical.

In the April 9,1998, letter, the licensee stated:

The intent of this request is to apply to future inservice examination of these welds.

The preservice volumetric examination techniques included both ultrasonic and radiographic examination. The ultrasonic examination techniques resulted in a limited examination to the extent as delineated in the relief request. Because of the limitations, a subsequent radiographic examination technique was used and achieved full coverage of the subject welds. Both volumetric examination techniques employed were performed with consideration to Paragraph IWB-2200 of the ASME Code.

The request for relief is directed at using the ultrasonic examination technique for subsequent inservice examinations. The radiographic technique can be employed in subsequent inservice examinations. However, the radiation exposure associated with applying this technique is excessive. Due to the configuration and wall thickness of these welds, the source is required to be positioned in a fixture within the inside.

diameter of the pipe. As delineated in the relief request, the radiation exposure associated with the inspection of one weld would be approximately 1.2 rem. For this

I 5

i reason, relief is requested from the ASME Code volumetric coverage requirements I

for ultrasonic examination so the ultrasonic examination technique can be used for future inservice examinations in lieu of the radiographic examination technique.

j i

3.0 EVALUATION The Code requires 100% surface and volumetric examination of Class 1 nozzle-to-vessel welds. However, due to nozzle geometry and configuration, examination of the subject nozzle I

wolds could not be performed to the extent required by the Code. Therefore, the Code

]

coverage requirements are impractical for these welds. To meet the Code requirements, j

design modifications would be necessary to provide access for examination. Imposition of j

these requirements would create a burden on the licensee.

{

The licensee can complete a significant portion (279%) of the Code-required volumetric examination for each of the subject nozzle-to-vessel welds. In addition, a complete "outside diameter" surface examinatico can be performed. This combination of examinations should detect any pattern of degradation that may occur; therefore, reasonable assurance of the j

continued structural integrity will be provided.

j

4.0 CONCLUSION

1 1

The staff has reviewed the licensee's submittal and concludes that the Code examination coverage requirements are impractical for the welds specified in Request for Relief No. RR-2-23 and that reasonable assurance of the structural integrity has been provided by the examinations that can be completed. Therefore, relief is granted pursuant to 10 CFR 50.55a(g)(6)(i) for the third 10-year ISI interval at Point Beach Nuclear Plant, Unit 2, for the current interval. The relief granted is authorized by law and will not endanger life or property or the common defense and recurity and is otherwise in the public interest giving due consideration to the burden upon the licensee that would result if the requirement was imposed on the facility.

Principal contributor: T. McLellan Date: July 8, 1998