Text
e
>R RP
UNITED STATES
t
g
NUCLEAR REGULATORY COMMISSION
. '8 '
REGION lil
o
g
y
801 WARRENVILLE ROAD
2
LISLE, ILLINOIS 60532 4351
% . * * * o$
%
July 2, 1998
Mr. Oliver D. Kingsley
President, Nuclear Generation Group
Commonwealth Edison Company
ATTN: Regu!atory Services
Executive Towers West 111
1400 Opus Place, Suite 500
Downers Grove, IL 60515
SUBJECT:
LASALLE INSPECTION REPORT 50-373/98010(DRP); 50-374/98010(DRP) AND
Dear Mr. Kingsley:
On June 5,1598, the NRC completed an inspection at your LaSalle facility. The inspection focus
was primarily on routine operations at the station. In addition, the inspection included a review of
the status of the LaSalle Restart Action Plan actions. The enclosed report presents the results
of that inspection.
During this 6-week inspection period, overall performance at the LaSalle station was acceptable.
However, human performance errors continued to be of concem, particularly those adversely
impacting plant configuration control. For example, a failure to understand independent
verification requirements resulted in removal of the incorrect out-of-service tags and operation of
the incorrect control room ventilation system dampers. In addition, personnel began
maintenance work on the electrohydraulic control system without the planned out-of-service in
place. Your staff has made progress in the implementation of the action plan items discussed in
the LaSalle Restart Action Plan. However, human performance improvements achieved through
implementation of extensive actions in the LaSalle Restart Action Plan are not yet self-
sustaining. Continued management focus is warranted in this area.
Based on the results of this inspection, the NRC has determined that a violation of NRC
requirements occurred. This violation involved the failure to follow procedure requirements for
performing independent verification activities when non-licensed operators were returning control
room ventilation system equipment to service. Specifically, the operators did not independently
verify that the dampers they were repositioning were the correct dampers, and as a result
repositioned the wrong dampers.
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your respcnse, in part, to
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
/
9807130010 980702
ADOCK 05000373
G
_ _ _ _ _ _
O. Kingsley
-2-
You are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos.: 50-373; 50-374
Enclosures:
1.
2.
Inspection Report 50-373/98010(DRP);
50-374/98010(DRP)
See Attached Distribution
DOCUMENT NAME: G:\\lasa\\las93010.drp
To receive a copy of this document, indicate in the box *C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" a No copy
OFFICE
Rlli
.
lAl
Rll!
lE
Rlli
l
Rlli
l
,
NAME
Vegel:co M &
Hills 41/l.n
Grant
. DATE
06/3d98
'
06/S/98 '
06/ /98
06/ /98
OFFICIAL RECORD COPY
-
. - _ _ _ _ _
--
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
s
'
e-
O. Kingsley
-2-
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its '
enclosures, and your response will be placed in the NRC Public Document Room.
Sincerely,
/s/ Marc L. Dapas for
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos.: 50-373; 50-374
Enclosures:
1.
2.
Inspection Report 50-373/98010(DRP);
50-374/98010(DRP)
l
See Attached Distribution
,
See Previous Concurrences
DOCUMENT NAME: G:\\lasa\\las98010.drp
To receive a copy of this document, Indicate in the box *C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy
OFFICE
Rlli
l
Rlli
l
Rlli
b
l
NAME
Vegel:co
Hills
Grant //M )fr
DATE
07/ 198
07/ 198
07/.2/98
OFFICIAL RECORD COPY
,#
,'
,
s
,
O. Kingsley
-3-
cc w/encis:
M. Wallace, Senior Vice President
- D. Helwig, Senior Vice President
G Stanley, PWR Vice President
J. Perry, BWR Vice President
D. Farrar, Regulatory
Services Manager
1. Johnson, Licensing Director
DCD - Licensing
F. Dacimo, Site Vice President
T. O'Connor, Station Manager
P. Bames, Regulatory Assurance
4
Supervisor
R. Hubbard
N. Schloss, Ecc nomist
Office of the Attomey General
State Liaison Officer
Chairman, illinois Commerce
Commission
Distribution
SAR (E-Mail)
Project Mgr., NRR w/encls
C. Paperiello, Rill w/encls
J. Caldwell, Rlll w/encls
B. Clayton, Rlll w/encls
SRI LaSalle w/encls
DRP w/encls
l
TSS w/encls
DRS (2) w/encls
Rlli PRR w/encls -
PUBLIC IE-01 w/encls
Docket File w/encls
,
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)
l
l
10002.7
.