Text
_ _ _ - _ - _
S PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA A. PA.19101 (215)841 4500 JOHN S. KEMPER November 5, 1987 N"N."U?ll"O' <YI,.
E Docket-Nos. 50-277 50-278 i
Mr. Steven A. Varga, Director Division of Reactor Projects I/II U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555
SUBJECT:
Generic Letter 83-28 Peach Bottom Atomic Power Station
References:
1)
Letter from S.
L.
Daltroff, PECo, to R.
Bernero, NRC, dated July 23, 1986 2)
Letter from J. W. Gallagher, PECo, to S. A. Varga, NRC, dated August 10, 1987
Dear Mr. Varga:
i This letter provides an update on the status of the one-time vendor manual update program and. maintenance procedure update program for Peach Bottom Atomic Power Station pursuant to Generic Letter 83-28, Items 3.1.2 and 3.2.2.
The three remaining maintenance procedures to be updated were completed prior to September 14, 1986, as committed to in the Reference 1 letter.
The Reference 1 letter indicated that we expected to complete the one-time vendor manual update program, with the exception of the emergency diesel-generator manuals, in October l
1986.
During review of completed documentation and continuing efforts to improve our Nuclear Records Management System we determined that an additional 20 manuals required vendor contact to fully implement our commitment to the Generic Letter.
Vendor l
contact has been made for these manuals, and we are awaiting their response.
l 1
J The diesel generator manual update project, as discussed in our Reference 2 letter, is proceeding as scheduled
,Ogf with a draft of the updated manuals to be forwarded to PECo for review by December 11, 1987.
To ensure that tne' draft of the manuals is of high quality and satisfies our specifications, d9 i
8711100328 871105 PDR ADOCK 05000277 P
H
.Mr.'Stevan~A. Varga Novembar 5,.1987' Page 2
-PECo's diesel generator. project engineer is making perio'ic I
d visits to the vendor to review. portions of1the manual as-they.are
-]
~
completedLand monitor the progress of the project.
Additionally,.
the: vendor'has'been encouraged by PECo.to assign additional.
l personnel.to the project, if necessary, to. maintain the-schedule..
j 1
If you have any questions.or' require additional.
information,-please'do not hesitateLto contact us.
H l
Very truly yours,
.k$dWf l
//
\\
l cc:
' Addressee W. T. Russell, Administrator,-Region I, USNRC
)
W. R. Butler, Project Directorate.I-2, USNRC T.
P. Johnson, PB USNRC Resident Site Inspector i
Madan Dev, Reactor Engineer, Region'I, USNRC l
t 1