Responds to NRC Ltr Re Violations Noted in Insp Repts 50-348/87-23 & 50-364/87-23.Corrective Actions:Setpoints on Pressure Actuated Switches Corrected & Personnel Reinstructed
ML20236L396
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 11/02/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NT-87-0480, NT-87-480, NUDOCS 8711100313
Download: ML20236L396 (2)


Text

%'(&;,

N :

~

NT-87-0480 -

!L[

k J.,. ; [ iabama Pdwer Company ;

j

)y 9

,, ' j Post office Box 264.1 l

600 North 18th Gtreet jfQf I

4M<

Birmingham; Alabama 35291-0400 --

'l h

Telephone 205 2501835 U '

N

['~

Ft. P. Mcdonald

(

Alabama Power j

r

Senior.Vice President :

$b' the southem electnc system 0

j y

an f

, kk November 2, 1987 Qh

)

atb"7 M

Docket No.I50-348 50-364 l

L'

[

~U. S.' Nuclear Regulatory Commission Attention: Document' Control Desk

(

( { Washington,._D. C. 20555.

v

SUBJECT:

J. M. Farley Nuclear Plant-NRC Inspection of August 19;- September. 10, 1987'

.i i

RE:-

' Report Number 50-348/87-23 50-364/87-23 j

Dear Sir:

h This letter refers to the violation cited in the subject inspection reports

which state:.

"During the Nuclear Regulatory Commission (NRC) inspection conducted August L

.19 through~ September.10,.1987, a violation of NRC requirements was gg identified. The violation involved failure to implement procedures

' required by Technical Specification Section 6.8.1'.

In accordance'with the g'. n

" General Statement of Policy and Procedure for NRC Enforcement Actions,".10 he "

W CFR Part 2, Appendix C (1986),.the violation!is cited below:

Technical Specification 6'.8.1.c requires that applicable written procedures covering surveillance and-test activities of safety related equipment be established, implemented, and maintained.

.The setpoints for the pressure switches which energize the

' control room status lights to: indicate that normal air pressure c-s is available in'the air receivers to start the emergency diesel

'y

' driven generators are specified by design documents A-170750 for i

f' Unit.1'and 205968-for Unit 2.

The pressure switches for diesel generators 1-2A;.la and 2B are specified to close at 420 psig and

,J t

remair closed.until the pressure is reduced to 370 psig. The r-spoints for the pressure switches are maintained by calibration procedureLFNP-O-IMP-425.3 " Pressure Activated Switches

.(Generic)".

Contrary to' C e above, prior to July 30, 1987 procedure FNP-O-IMP-41 U " Pressure Actuated Switches (Generic)" had not been fully implemented in that the setpoints of the pressure switches on the air start receivers to diesel generators 1-2A, la and 2B were calibrated to close at 420 psig and open at various e

[

setpoints ranging from approximately 406 to 422 psig. Thus the i

~

normal air pressure status lights on the main control board in

/

)

the control room were frequently not illuminated when there was gll v

8711100313 871102

/

0 PDR ADOCK 05000348 o

,G' PDR

\\

3,5 1

)

~

.i y.

i U. S. Nuclear. Regulatory Commission November 2, 1987 Page 2 actually sufficient air pressure in the air receivers to start the diesel engines.

1 This is a Severity Level IV violation (Supplement I)".

Admission or Denial The above violation occurred as described in the subject reports.- This j

discrepancy had not been recognized because the subject status lights do not'have an audible alarm associated with them. There are low air pressure

' alarms which have an associated audible alarm; these alarms are relied upon by operating personnel, t

Reasons for Violation The above violation was caused by personnel error in that Instrumentation q

and Controls (I&C) personnel had used a setpoint different than that specified in the setpoint' document.

1 Corrective Action Taken and Results Achieved i

The setpoints have been corrected on the switches in question.

Corrective Action Steps Taken to Avoid Futher violations The appropriate I&C personnel will be reinstructed to:

1.

Meet the requirements of setpoint design documents, and l

t 2.-

Meet the requirements of FNP-O-AP-8 if changes are required to t

setpoint documents.

Date of Full Compliance I

November 15, 1987 Affirmation I affirm that this response is true and complete to the best of my knowledge, information, and belief. The information contained in this letter is not considered to be of a proprietary nature, m

Yours v

truky, 0:

0 go l

R. P. McDo52ild I

RPM:emb cc:

Mr. L. B. Long Dr. J. N. Grace il l

Mr. E. A. Reeves f

Mr. W. H. Bradford il