ML20236K891

From kanterella
Jump to navigation Jump to search
Requests Commission Reconsideration of Proposal for External Review of Plant Included in Author Re Establishment of Ad Hoc Committee W/Expertise in Transportation & Radiologic Emergency Planning
ML20236K891
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 09/17/1987
From: Gregg J
HOUSE OF REP.
To: Zech L
NRC COMMISSION (OCM)
Shared Package
ML20236K884 List:
References
NUDOCS 8711100013
Download: ML20236K891 (2)


Text

7~ ~ x

,pi

)

s y

y 1, u,

,J 4'

4

.q

,s n

i ;h

(

l.'

. [.

r t

r WOUookREGG 1

2%$.N's7m h

[, g t20 Distnice, New Hias7smtt

.N t

Po;tt (00v flo40,

3f2'28-03 5

?

wa'amnoton omcs I

. i' cc- ; Cannon 8vsonho '

1

'5 NAs NH 3 60

'0 0

(603)483-0800 q

. ' WAYS AND MEANS '

~

g hgffgh h

s[nfmIH0$s70 h

ghId COMMITTEE oN' Je03) n2-53ss u

HOUSE OF REPRESENTATNES-WASHINGTON, DC 20515-Septe'mberL17, 1987' t

m I.

Honorable Lando Zech, Chairman.

4 Nuclear _ Regulatory Co'mmission 1717~H. Street, N. W.

Washington, D.

C.

20555_

q

1

Dear 1 Commissioner Zech:

g

'The problems. surrounding the: licensing of the'SeabrookLNucl' ear

Station continue.to be,a1. source _of.greaticonsternation.for the..

1 2

citizens of New Hampshire. :In; addition to the feelings ofl exclusion j

c f rom the hearings which.will1be holds in, Concord during1 th'e next'few' u

j weeks,_there is growing. anxiety.over the feasibility;ofQthe emergency (j

plans prepared by the utility for possible radiologic" incidents.

j LAlthough I-.am certainlyLnot technically.qualifledito judge.the-adequacy of the Seabrook plans, it is : obvious ~to me ;that any plan:

based.on'public cooperationjcan only be effective if the residents of?

the area have confidence that they will'be properly protected.

q Because of the vested interest inherent in the role;of the utility, a

any plan developed by them will certainly be" viewed.by;the affected citizenry as lacking credibility.

Unfortunately even'though such ll plans'would undoubtedly be thoroughly reviewed by'the.NRC,'and-1 l

probably FEMA, public confidence is likely tostill be lacking.

_d In order to overcome this potential._ credibility problem,11.would ask that'the commission reconsider the proposal for an external. review.

1 1

of the Seabrook~ plans which was included in my letter to you: dated February 20, 1987.

As you may recall, I suggested'the establishment:

of an ad hoc committee possessing clear expertise.in transportation and raBTologic' emergency _ planning.

AW an' example of how such a body-might,be constituted, I proposed:a panel comprised;ofLthe Director of Civil' Defense and the Commissioner-of Highways, or their equivalents,4 from the affected states, an expert in emergency planning from' FEMA,.

1 an expert.in emergency transportation _trom:the' Office'of Emergency.

1 Transportation of the U.S.

Department of Transportation, with the-panel chaired by the Chairman of the National!Research Council's Transportation Research Board, or his designee.

If' the public's concerns, are lto be_ adequately address,ed, every

' effort must be'made.to assure that the evacuation plans.are truly, q

workable.

We.must provide maximum confidence in-the> feasibility of

.such plans before allowing'the plant to come;on line.

Sincerely,,

d 9711100013 871103 1

PDR ADOCK 05000443 U

PDR ember off ngress y.

JG:rb K

I~

y..*

i

,sug i

4 g

i DIVISION DIRECTOR'S OFFICE DIVISION.0F RADIATION PR01ECTION AND EMERGENCY PREPARE 0 NESS j-

/

87-67 2*

DATE/.

9/28/87 1

1.

ACTION NUMBER:

4 3.

SUBJECT:

Concerns Re:

Evacuation Plan for Spahrnnk 4.

REQUESTOR:

Judd Greqq 5.

ACTION REQUESTED:

Response

l l

6.

ASSIGNED TO:

EPB Matthows (BRANCH)

(INDIVIDUAL) 7.

EXPECTED COMPLETION DATE:

10/2/87 8.

EXTENDED COMPLETION DATE:-

9.

COMPLETION DATE:

10.

DOCUMENTATION OF COMPLETION:

  • * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *IRECTOR'S RETURN THIS SHEET AND THE INCOMING WITH RESPONSE TO ACTION TO D UFFICE_F,0R SIGNATURE / CONCURRENCE Q