ML20236K491

From kanterella
Jump to navigation Jump to search
Forwards Rev 1 to 860317 Application for Amends to Licenses DPR-42 & DPR-60.Rev Updates Original Request W/Addl Tech Spec Clarifications & Improvements Identified by Plant Personnel & Senior NRC Resident Inspector
ML20236K491
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 07/27/1987
From: Musolf D
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM), Office of Nuclear Reactor Regulation
Shared Package
ML20236K493 List:
References
NUDOCS 8708070136
Download: ML20236K491 (2)


Text

__ _ _ _ _

Northem States Power Company I i

414 Nicollet Mall  !

Minneapolis, Minnesota 55401 Telephone (612) 330 5500 July 27, 1987 Submitted in accordance with 10 CFR Part 50, Section 50.90.

Director Office of Nuclear Reactor Regulation US Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555

)

PRAIRIE ISLAND NUCLEAR GENERATING PLANT Dociet Nos. 50-282 License Nos. DPR-42 j 50-306 DPR-60 Revision 1 to the Lir c a Amendment Request dated March 17, 1986 Attached is a revision to our License Amendment Request dated March 17, 1986 The purpose of this revision is to update the original request with additional Technical Specification clarifications and improvements that l have been identified by the plant staff and the Senior NRC Resident l Inspector.

l The attached revised Exhibit A should be substituted for Exhibit A of the original submittal. Revised pages contained in the attached Exhibit B should be substituted for the corresponding pages contained in the origi-nal submittal.

A number of new pages are provided in Exhibit B that were not included in the original submittal. These pages have been marked up and should be inserted with the pages contained with the original submittal.

Exhibit C contains a cross-reference between the changes described in Revision 1 of Exhibit A and the page revisions contained in Exhibit B.

Please contact us if you have any questions related to this revision or i if additional information is required to supplement it.

l l

l  !?RSIBER8585l iga 1 P p f)07

/ ,

J

Director of NRR Nodhern States Power Company i July 27, 1987 Page 2 i

A license amendment fee for this submittal is not needed because it is a l revision to a License Amendment Request for which a fee has already been paid.

I

~[23 %__52 b-e---,

David Musolf Manager - Nuclear Support Services c: Regional Administrator III, NRC Sr NRR Project Manager, NRC Sr Resident Inspector, NRC G Charnoff Minnesota Pollution Control Agcucy (State Contact)

Attn: Dr J W Ferman Attachments: Exhibit A, " Revision 1 to License Amendment Request Dated March 17, 1986, Evaluation of Proposed Changes to the Technical Specifications Appendix A of Operating License DPR-42 and DPR-60" Exhibit B, " Proposed Changes Marked Up on Proposed Rev 0 Technical Specification Pages" Exhibit C, "Crossreference Between Revision 1 Changes and the Exhibit A Safety r"aluations" l

l