ML20236J336

From kanterella
Jump to navigation Jump to search
Forwards Revised Emergency Diesel Generator Reliability Program Guidelines W/Apps to Assure That USI A-44 Consistent W/Program.Review Requested by 870814.Guidelines Will Be Principal Ref for Resolution of USI B-56.W/o Encl
ML20236J336
Person / Time
Issue date: 07/21/1987
From: Serkiz A
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To: Baranowsky P, Chopra P, Haass W, Clay Johnson, Murphy E
Office of Nuclear Reactor Regulation, NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
REF-GTECI-A-44, REF-GTECI-B-56, REF-GTECI-EL, TASK-A-44, TASK-B-56, TASK-OR GL-84-15, NUDOCS 8708060144
Download: ML20236J336 (2)


Text

P. Baranowsky, NRR/0EAB MEMORANDUM.FOR:

P. Om Chopra,- NRR/SELB l l JS p C. Johnson, RES/RHFB W. Haass, NRR/RVIB E, Murphy, NRR/EMTB A. Notafrancesco, NRR/SPLB A. Rubin,'RES/RHFB FROM:

A. W. Serkiz, B-56 Task Manager Reactor and Plant Safety Issues Branch Division of Reactor and Plant Systems, RES

SUBJECT:

REQUEST FOR REVIEW 0F EDG RELIABILITY PROGRAM GUIDELINES (REF SAFETY ISSUE B-56)

Enclosed are the EDG reliability program guidelines, with appendices, which have been prepared by SAI. Revisions and additions have been made pursuant to views exchanged at the June 23, 1987 meeting. Please review this package and providi me with your acceptance (as currently written), or required revisions (as written by you) by August 14,1987. This tight schedule'is necessary'to -

assure that USI A-44 (which is scheduled to be sent to the EDO in August 1987) is consistent with the staff's views regarding an adequate EDG reliability program.

In particular, your attention is directed to: 1) determining the adequacy of the main elements of an EDG reliability program as outlined in Table 1 (page 1-3),

and requirements as outlined in the main report, 2) EDG reliability / unavailability goals and calculational methods as outlined in Appendix A. Appendix A needs to be reviewed by NRR/SELB since this appendix will be the basis for revising RG 1.108 (or writing a new RG to be consistent with Generic Letter 84-15), and

3) reviewing of contents of the appendices to determine if adequate supplemental guidance is provided for both reviewer and user.

As previously discussed with you, if you require reassignment of work priorities, please discuss this request with your Branch Chief or Section Leader and ihvolve me as required. Resolution of USI A-44 is dependent on a satisfactory resolution of B-56.

These guidelines will be the principal reference for the B-56 resolution.

Originalsigned byt A. W. Serkiz, B'56 Task Manager Reactor and Plant Safety Issues Branch

Enclosure:

As stated Division of Reactor'and Plant Systems, RES cc: W. Lanning, NRR/0EAB A. Thadani, NRR/ SAD F. Rosa, NRR/SELB W. Minners, RES/DRPS J. Craig, NRR, SPLB J. Burns, RES/ EMS E. W. Merschoff, NRR/RVIB W. Schwink, NRR/ILR8 C. Y. Cheng, NRR/EMTB h' g OFC MRPS:RPSIB :D S:RPSIB  : SI  :  :  :

NAME : ASerkiz:jf :P orian l.__.__

DATE :07/$\/87  : 07/]/ /87 :07/6/87  :

OFFICIAL RECORD COPY B708060144 870721 PDR GTECI GELA PDR:

i 1 1 l

DISTRIBUTION: 007 RES Circ RES Chron RPSIB R/F DRPS C/F .

KKniel PNorian I ASerkiz CDCSf NLf 007 (pl0 fg)

"PDR 1 i

I l

l l

i l

l l

l l

l l

l l

l 1

- - - _ _ _ _ _ . _ _ _ _ _ _