ML20236J227

From kanterella
Jump to navigation Jump to search
Requests Names of Individuals to Be Assigned to Design QA Audit of GE Advanced Bwr,Per J Sniezek 871022 Memo.Te Murley Draft Memo Re Design QA Audit of GE Encl
ML20236J227
Person / Time
Issue date: 11/03/1987
From: Rubenstein L
Office of Nuclear Reactor Regulation
To: Partlow J, Roe J, Shao L
Office of Nuclear Reactor Regulation
References
NUDOCS 8711050207
Download: ML20236J227 (4)


Text

_ _ _ - _ - _ _ _ _

November 3, 1987 I

l MEMORANDO." FOR: Jack W. Roe, Director l

Division of License Performance l

& Quality Evaluation James G.

Partlow, Director l

Division of Reactor Inspection and Safeguards Lawrence Shao, Director Division of Engineering and Systems Technology FROM:

Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects

SUBJECT:

DESIGN QA AUDIT OF GE's ABWR On October 22, Jim.Sniezek requested preparation of the subject QA audit and defined the team makeup as described in the attached draft memo.

Please provide the names of the individuals you will assign to the audit. Also feel free to modify the memo. Contact me or Dino Scaletti (ABWR-PM) on X28795 and X28282, respectively, if you have any questions or comments.

original signed by Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects

Enclosure:

As stated cc:

F. Miraglia D. Crutchfield 8711050207 071103 PDR TOPRP Et1VGENE R. Starostecki C

pga CONTACT:

L. Rubenstein or D. Scaletti NRR/PDSNP NRR/PDSNP Ext. 28795 Ext. 28282 b, DISTRIBUTION:

Central File g LRubenstein AThadani JStone "NRC PDR' DScaletti CHaughney PDSNP Reading JRichardson SWiess

/

PDSNP \\

sP P

0 !L[I, DScalett t

stein 11/3 /F G

7 I"Q

ry ~;

3

)

3 i

- [f n stevy.

je UNITED STATES s-g

.s

. ? g

.; i NUCLEAR REGULATORY COMMISSION j

WASHINGTON, D. C. 20555 J5 r

k.

/

November 3, 1987' j

MEMORANDUM F0P.: Jack W. Roee Director j

Division of License Performance l

8 Quality _ Evaluation James'G. Partlow,_ Director.

Division of Reactor Inspection and Safeguards j

Lawrence Shao, Director l

Division of Engineering and Systems Technology FROM:

Lester S. Rubenstein, Director i

Standardization ~and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects f

SUBJECT; DESIGN QA AUDIT OF GE's ABWR On October 22, Jim Sniezek requested preparation of the subject 0A audit 4

'and defined the team' makeup as described in the attached draft memo. Please y~

' provide the names of the individuals you will assign to the audit. Also feel free,to modify the memo. Contact me or'Dino Scaletti (ABWR-PM) on X28795 and X28282, respectively, if you have any questions or comments, l

l s$

CN_

s 9, Q M

Lester ubenstein, Director Standardization and Non-Power i

Reactor Project Directorate Division of Reactor Projects III, IV, l

V and Special Projects

Enclosure:

As stated cc:

F. Miraglia D. Crutchfield R. Starostecki CONTACT:

L. Rubenstein or D. Scaletti NRR/PDSNP NRR/PDSNP Ext, 28795 Ext. 28282

y ;w u.~

'q

?;, s L.

~j j

[ll' f

g,.

_ NUCLEAR REGULATORY COMMISSION-l s p::

l

?

. UNITED STATES

....ji:j-[

i

}

y rj.

' WASHINGTON, D. C. 20555 J

A...

MEMORANDUM:FOR:' Frank J.-Miraglia..

l Associate. Director for Projects j

'RichardW.Starostechi!

4 Associate ' Director.:for Inspection and :

a

' Technical Assessment' j

.i FROM:

Tho' mas E; Murley,'Oirector -

]

1

' Office 'of Nuclear' Reactor ' Regulation

.1

SUBJECT:

DESIGN;QA-AUDITOFGENERALELECTRICCO,(ABWR)'

' On. Sept' ember 29,;1987, General Electric. company (GE) ' applied for a design

]-

certification for'their' Advanced Boiling Water. Reactor (ABWR) in accordance

^with 10 CFR 50 Appendix 0 and the Commissions recently issued Standardization

'. Pol icy. Although'GE is the sole applicant for the design' certification, the e

L ABWR' design' was. aljoint technical effort be' tween Hitachi, LToshib'a 'an'd GE.

[Because of this joint design effort, which has been' essentially complete-since 1985, special; attentionLto the Appendix B design QA requirements is warranted; I

.especially for'those-portions of the'ABWR designed by Toshiba and Hitachi, o

ni

' Therefore. I am directing the staff to perform an audit of the GE 1

ABWR design process in February.1988. The Associate Director for Projects.has been assigned the' lead responsibility for establishing and coordinating the GE l

QA audit.- It is anticipated that the audit' will be a concentrated effort by a interdisciplinary ' team of-approximately 6-10 experienced staff people over a 8-10' day period. The audit should be' preceded by an initial visit by 2-3 experienced personnel in' January 1988 to identify areas of importance on which

~

i j

--the audit team should focus-their attention.

____-___m.__....

Ll

m..

Cj t

(

r

{'{[ i

's.

ro m

' E, I\\. '

1 2-i r

l

'The. Directors of DEST, DRIS, DLPQ and DRSP,are directed to assign the isenior staff members to participate in this audit The assigned team members

- should be identified to ADP within 1 week's.of the date-of this memorandum and j

y 4 be prepared to. visit San Jose in early February. The team will be composed of the following staff:

)

1 1.

Team Leader - Chief, QAB

'j 2.

'O. Scaletti, PDSNP

.j 3.

DLPQ, QAB Member

q

'4.

DEST Member a

5.

DRIS Member l

, 6.

Region Representative, QA.

J 7..~ Region Representative, with construction, QA Experience

]

This audit will provide the basis for the staff's review of the ABWR

.as it relates to design QA.

n i

Thomas E. Murley, Director Office of Nuclear Reactor Regulation 4

)

CONTACT:

D. Scaletti PDSNP Ext. 28282

_L_-_____