ML20236J171
| ML20236J171 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/04/1987 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8711050173 | |
| Download: ML20236J171 (1) | |
Text
. _.
TENNESSEE VALLEY AUTHORITY CHATTANOOGA TENNESSEE 374ol SN 157B Lookout Place NOV 041987 U.S. Nuclear Regulatory Commlusion ATTN: Document Control Desk Washington, D.C.
20555 I
. Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennesseo Valley Authority
)
50-326 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 - NRC INSPECTION REPORT NOS.
50-327/87-52 AND 50-328/87 ESSENTIAL RAW COOLING WATER (ERCW) SYSTEM AS-DUILT VERIFICATION INSPECTION Our response to Stewart D. Ebneter's letter dated September 25, 1987, to S. A. White, which transmitted Inspection Report Nos. 50-327/87-52 and 50-328/87-52, citing three violations, two unresolved items, and four weaknesses, will be submitted by November 9, 1987.
John T. LaPoint, Sequoyah Deputy Site Director, requested this 2-week extension from Frank McCoy, NRC l
Section Chief, SQN Inspection Programs, Division of TVA Projects, who agreed to the extension request on October 26, 1987.
If you have any questions, please telephone M. R. Harding at 615/870-6422.
Very truly yours, TENNESSEE VALLEY AUTHORITY R.de ey, Director Nuclear Licensing and Regulatory Affairs cc:
Mr. G. G. Zech, Assistant Director for Inspection Programs Office of Special Projects U.S. Nuclear Regulatory Commission 101 Harletta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. J. A. Zwolinski, Assistant Director e
for Projects Division of TVA Projects Office of Special Projects U.S. Nuclear Regulatory Commission 4350 East-West Highway EWW 322 Bethesda, Maryland 20814 Sequoyah Resident Inspector Rh"
/'
\\h N N [ $ sy, Tennessee l
Soddy 37379 i
B711050173 973394 Opun4 En@om gDR ADOCK 05000327 nm