Submits Addl Info Re 870514 Proposed Amend 158 to License DPR-54 Concerning Hydrogen Purge Sys,Per Telcon Request. Operating Procedure Which Will Remain in Effect During Final Disposition for Hydrogen Purge Blowers Developed
ML20236J118
Person / Time
Site: Rancho Seco
Issue date: 10/29/1987
From: Firlit J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Kalman G
NRC
References
AGM-NPP-87-346, TAC-65417, NUDOCS 8711050140
Download: ML20236J118 (2)


Text

- _ _

i

$(suun

- SACRAMENTO MUNICIPAL UTILITY DISTRICT O P. O, Box 15830, Sacramento CA 95852 1830,(916) 452-3211 AN ELECTRIC SYSTEM SERVING THE HEART OF CALIFORNIA l DCT 2 01981 i

AGM/NPP 87-346 U. S. Nuclear Regulatory Commission Attn: George Kalman, Project Manager Philips Bldg., Mail Stop P-214 7920 Norfolk Avenue Bethesda, MD 20014 l DOCKET 50-312 l I

RANCHO SECO NUCLEAR GENERATING STATION J LICENSE NO. DPR-54 d PROPOSED AMENDMENT NO.158 ADDITIONAL INFORMATION

Dear Mr. Kalman:

I l

The District submitted Proposed Amendment No.158, to the NRC on May 14 with a >

follow-up letter on September 25, 1987. Per a subsequent telephone conversation additional information with regard to the Hydrogen Purge System L was requested, j It is the District's intention that the existing hydrogen purge blowers be removed from service and isolated. The portions of the system required for the operability of the hydrogen monitors and radioactivity samplers will remain in service. Also, the dedicated containment penetrations for

. connection of an external recombiner will remain isolated, with essential <

power from the valves removed. l 1

Operating procedures will remain in effect while Nuclear Engineering continues to develop a final disposition for the hydrogen purge blowers. Surveillance requirements will be discontinued because the Hydrogen Purge System is no longer required for combustible gas control.

l In addition to a combustible gas control system for accident mitigation, i 10CFR50.44(e) also requires that the plant retain a controlled purge j capability for post accident recovery. This capability is available by use of '

Containment Purge and Pressure Equalization Systems. These systems are currently under surveillance per Section 4.11 of the Rancho Seco Technical Specifications.

The reactor building purge isolation valves are closed with their breakers de-energized during normal operation per Tech Spec 3.6.7; however, the system can be made operational when required. The containment pressure equalization valves close on ,a containment isolation signal to isolate the purge and equalization systems from the contairiiaent. When the containment pressure stabilizes, the equalizing valves can be opened to reduce containment pressure i before purging the containment. Both systems exhaust to the reactor building f exhaust stack which is monitored by high range noble gas effluent monitor.

8711050140 871029 PDR ADOCK 05000312 (I :D l

2 PDR \

\

HANCHO SECO NUCLEAR GENERATING STATION O 1444o Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935

r. -

~

4 1

N ,

i;]

y , ,},- '.

.p If ? ,

AGM/NPP 87-346 George Kalman' .

- 2'- ,

-1 0

Please contact me if you h' ave any questions. Members of your staff with  ;-

~

questions requiring ^ additional information.or clarification may contact i

' Jerry Delezenski at (209) 333-2935 extension 4914. ,

, .i o: 4

- Sincerely,  !

)' .

oseph F. Firlit-

< - Assistant General . Manager, Nuclear Power Production