_ _ _ _

  • i

' Docket No. 50-346.

f License No. NPF-3 j Serial No. 1408 i Enclosure'  !

f APPLICATION.FOR AMENDMENT- I TO FACILITY OPERATING LICENSE NO. NPF-3 FOR 1 l

DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 l

l l Attached are requested changes to the Davis-Besse Nuclear Power Station, Unit No. 1 Facility Operating License No. NPF-3. Also included are the Safety Evaluation and Significant Hazards Consideration.

The proposed changes (submitted under cover letter Serial No. 1408) concern Section 6.0, Administrative Controls:

l Figure 6.2-1 Davis-Besso Nuclear Power Station Offsite/Onsite Organization; Specification 6.3, Facility Staff Qualifications;-

l Specification 6.5, Review and Audit; Specification 6.6, Reportable Event Action; and Specification 6.7, Safety Limit Violation.

By .

M 'h D. C. Shelton, Vice President, Nuclear Sworn to and subscribed before me this 31st day of July, 1987.

k /d / Ok Notary Public,~ State of Ohio i"

My commission expires 6!/ /

//

970B060020 870731 PDR ADOCK 05000346 P PDR L____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . - - - - - _ _ _ _ _ _ _ _ _ _

1 l

Docket No. 50-346 License No. NPF-3 Serial No. 1408 Attachment 1 Page 1 SAFETY EVALUATION INTRODUCTION The purpose of this Safety Evaluation is to review proposed changes to the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A Technical Specifications. The proposed changes involve revising the Technical Specifications to reflect recent organization, j position, and title changes in Figure 6.2-1, Davis-Besse Nuclear Power l Station Offsite/ nsite Organization and in Section 6.0, Administrative I Controls.

SYSTEMS AFFECTED None REFERENCES l

Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix '

A, Technical Specifications.

FUNCTIONS OF AFFECTED SYSTEMS N/A PROPOSED AMENDMENT REQUEST DISCUSSION As discussed below, the proposed License Amendment Request revises the I following sections of the Davis-Besse Nuclear Power Station, Unit No. 1 Operating License, Appendix A Technical Specifications.

Figure 6.2-1 (page 6-2) - Revise figure to: 1) Include the following title changes: Administration Senior Vice President to Finance and Administra-tion Vice President; Senior Vice President, Nuclear to Vice President, Nuclear; and Performance Engineering Manager to Performance Engineering Director; 2) Add the position of Executive Vice President. The Finance and Administration Vice President and the Vice President, Nuclear report directly to the Executive Vice President, instead of to the President and Chief Operating Officer; 3) Change the reporting requirements for the Technical Support Department. The Technical Support Department reports directly to the General Superintendent, Outage and Program Management, j instead of to the Plant Manager; 4) Change the reporting requirements for l the Plant Services Department. The Plant Services Department reports directly to the Maintenance Planning Superintendent instead of to the Plant Manager. The Maintenance Planning Superintendent reports directly 4

l t

Docket No. 50-346 License No. NPF-3 Serial No. 1408 Attachment 1  :

Page 2 )

)

i to the General Superintendent, Outage and Program Management; and 5)

Separate the Chemistry and Health Physics Department into the Chemistry l Department and the Radiological Controls Department. The Chemistry Super- ]

intendent is scheduled to report to the Plant Manager commencing August 3, 1987. The Radiological Controla Superintendent is scheduled to report to the Plant Manager commencing August 3, 1987. All the changes are adminis- l trative in nature.

6.3.1 (page 6-5) - Change Chemistry and Health Physics General Superinten-dent to Radiological Controls Superintendent. This change reflects the separation of the Chemistry and Health Physics Department and is consistent j with Regulatory Guide 1.8, September 1975. This is an administrative ]

change. j

\

6.5.1.2 (page 6-6) - Change Station Review Board member from Chemistry and Health Physics General Superintendent to Radiological Controls Sun r-intendent. This change reflects the separation of the Chemistry and Health Physics Department. This is an administrative change.

6.5.1.2 (page 6-6) - Delete "or Performance Engineering Manager". This j posi; ion has been elevated to Performance Engineering Director, which is I incitded as an Engineering Director. This is an administrative change, j 6.5.1.2 (page 6-6) - Change Station Review Board member from Operations Qualny Assurance Manager to Engineering Assurance Supervisor. This  ;

change reflects the current position title. This is an administrative l change.

6.5.1.6.e (page 6-7) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.1.7.c (page 6-8) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.1.8 (page 6-8) - Change title of Senior Vice President, Nuclear to I Vice President, Nuclear. This is an administrative change.

6.5.2.2 (page 6-9) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.9 (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.10.a (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.10.b (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

Docket No. 50-346 License No. NPF-3 Serial No. 1408 Attachment 1 Page 3 6.5.2.10.c (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.6.1.b (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.7.1.b (page 6-13) - Change title of Senior Vice President, Nuclear to l Vice President, Nuclear. This is an administrative change.

6.7.1.d (page 6-13) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

DISCUSSION OF UNREVIEWED SAFETY QUESTION I

The proposed changes are administrative. Therefore, the implementation of l these proposed changes would not:

1 Increase the probability of occurrence of an accident previously evaluated in the USAR because the accident conditions and assumptions are not affected by the proposed Technical Specification changen. The l proposed changes do not involve a test, experiment, or a modification l to a system. The proposed changes are administrative in nature and do  !

not increase the probability of occurrence of an accident previously evaluated (10CFR50.59 (a) (2) (1)) .

Increase the consequences of an accident previously evaluated in the USAR because the accident conditions and assumptions are not affected by the proposed Technical Specification changes. The proposed changes do not  !

involve a test, experiment, or a modification to a system. The proposed I changes are administrative in nature and do not increase the consequences of an accident previously evaluated (10CFR50.59(a)(2)(1)) .

Increase the probability of occurrence of a malfunction of equipment j important to safety previously evaluated in the USAR because the proposed l changes do not involve a test or experiment, and no station equipment is i being modified. The proposed changes are administrative in nature and do not increuse the probability of occurrence of a malfunction of equipment important to safety (10CFR50.59(a)(2)(1)) .

Increase the consequences of a malfunction of equipment important to safety previously evaluated in the USAR because the proposed changes do not involve a test or experiment, and no station equipment is being modified. The proposed changes are administrative in nature and do not increase the consequences of a malfunction of equipment important to safety (10CFR50.59(a)(2)(1)).

Create the possi!'lity for an accident of a different type than any evaluated previously in the USAR because the accident conditions and assumptions are not affected by the proposed Technical Specification

i Docket Wo. 50-346 l License No. NPF-3 l Serial No. 1408 l Attachment 1 '

Page 4  ;

d changes. The proposed changes do not involve a test or experiment, or a ]

modification to a system and do not affect any plant equipment or oper-ation procedures which could impact the probability of an accident. The proposed changes are administrative in nature and involve no accident scenario. On matters related to nuclear safety, all accidents are bounded 1 by previous analyses and no new accidents are involved (10CFR50.59(a)(2)(11)).

Create the possibility for a malfunction of a different type than any evaluated previously in the USAR because no station equipment is being modified by the proposed Technical Specification changes. The proposed changes do not involve a test or experiment, or a modification to a system and do not affect any plant' equipment or operational procedures which could impact the probability of a malfunction. The changes are i administrative in nature and involve no malfunction scenario '

(10CFR50.59 (a) (2) (ii)) .

Reduce the margin of safety as defined in the basis for any Technical Specification because the amendment does not affect any operating practices or limits nor any equipment or system important to safety. The proposed changes are administrative in nature and will not reduce the margin of safety (10CFR50.59(a)(2)(iii)) .

I CONCLUSION I I

i Based on the above, it is concluded that the proposed Technical l l Specification changes do not constitute an unreviewed safety question.

I i

l I

l

__-___m.._m______.________--.._-_--a_---_- --- ---

Docket No. 50-346 License No. NPF-3 Serial No. 1408 Page 1 SIGNIFICANT HAZARDS CONSIDERATION IW1RODUCTION The purpose of this Significant Hazards Consideration is to review proposed changes to the Davis-Besse Nuclear Power Station, Unit-No. 1 Operating License, Appendix A Technical Specifications. The proposed changes involve revising the Technical Specifications to reflect recent organization, position, and title changes in Figure 6.2-1, Davis-Besse Nuclear Power Station Cffsite/Onsite Organization and in Section 6.0, Administrative Controls. '

SYSTEMS AFFECTED None REFERENCES Davis-Besse Nuc3 ear Power Station, Unit No. 1 Operating License, Appendix A, Technical Specifications.

FUNCTIONS OF AFFECTED SYSTEMS N/A PROPOSED AMENDMENT REQUEST DISCUSSION As discussed below, the proposed License Amendment Request revises the following sections of the Davis-Besse Nuclear Power Station, Unit No. 1 ,

Operating License, Appendix A Technical Specifications.  !

Figure 6.2-1 (page 6-2) - Revise figure to: 1) Include the following title changes: Administration Senior Vice President to Finance and Administra- y tion Vice President; Senior Vice President, Nuclear to Vice President, j Nuclear; and Performance Engineering Manager to Performance Engineering j Director; 2) Add the position of Executive Vice President. The Finance and Administration Vice President and the Vice President, Nuclear report directly to the Executive Vice President, instead of to the President and Chief Operating Officer; 3) Change the reporting requirements for the Technical Support Department. The Technical Support Department reports directly to the General Superintendent, Outage and Program Management, l instead of to the Plant Manager; 4) Change the reporting requirements for j the Plant Services Department. The Plant Services Department reports j directly to the Maintenance Planning Superintendent instead of to the #

Plant Manager. The Maintenance Planning Superintendent reports directly

(

)

1 l

i

Docket No. 50-346 License No. NPF-3 Serial No. 1408 Attachment 2 Page 2 l

to the General Superintendent, Outage and Program Management; and 5) '

Separate the Chemistry and Health Physics Department into the Chemistry Department and the Radiological Controls Department. The Chemistry Super-intendent is scheduled to report to the Plant Manager commencing August 3, 1987. The Radiological Controla Superintendent is scheduled to report to the Plant Manager commencing August 3, 1987. All the changes are adminis-trative in nature.

6.3.1 (page 6-5) - Change Chemistry and Health Physics General Superinten- )

dent to Radiological Controls Superintendent. This change reflects the separation of the Chemistry and Health Physics Department and is consistent with Regulatory Guide 1.8, September 1975. This is an administrative change.

6.5.1.2 (page 6-6) - Change Station Review Board member from Chemistry and Health Physics General Superintendent to Radiological Controls Super-intendent. This change reflects the separation of the Chemistry and Health Physics Department. This is an administrative change.

6.5.1.2 (page 6-6) - De3ete "or Performance Engineering Manager". This l position has been elevated to Performance Engineering Director, which is included as an Engineering Director. This is an administrative change. i l

l 6.5.1.2 (page 6-6) - Change Station Review Board member from Operations Quality Assurance Manager to Engineering Assurance Supervisor. This change reflects the current position title. This is an administrative change. ,

l l l 6.5.1.6.e (page 6-7) - Change title of Senior Vice President, Nuclear to l

Vice President, Nuclear. This is an administrative change.

6.5.1.7.c (page 6-8) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.1.8 (page 6-8) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.2 (page 6-9) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.9 (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.10.a (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.5.2.10.b (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

l L____.______________________________________.______.___________.__ _ _ _ _ _ _ _ _ _ _ _ _

i I

. Docket No. 50-346 License No. NPF-3 Serial No. 1408 Attachment 2 j Page 3  ;

)

6.5.2.10.c (page 6-12) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.6.1.b (page 6-12) - Change title of Senior Vice President, Nuclear to j Vice President, Nuclear. This is an administrative change. I 6.7.1.b (page 6-13) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

6.7.1.d (page 6-13) - Change title of Senior Vice President, Nuclear to Vice President, Nuclear. This is an administrative change.

SIGNIFICANT HAZARDS CONSIDERATION The proposed changes do not involve a significant hazards consideration because the operation of the Davis-Besse Nuclear Power Station, Unit No. 1 in accordance with these changes would not:

Involve a significant increase in the probability or consequences of an l accident previously evaluated because the accident conditions and assumptions are not affected by the proposed Technical Specification changes. The proposed changes do not involve a test, experiment or a modification to a system. The proposed changes are administrative in nature and do not increase the probability or consequences of an accident previously evaluated (10CFR50.92(c)(1)).

I Create the possibility of a new or different kind of accident from any accident previously evaluated because the accident conditions and assumptions are not affected by the proposed Technical Specification changes. The proposed changes do not involve a test, experiment or a modification to a system and do not affect any plant equipment or operational procedures which could impact the probability of an accident.

The proposed changes are administrative in nature and involve no accident scenario. On matters related to nuclear safety, all accidents are l bounded by previous analysis and no new accidents are involved I

(10CFR50.92 (c) (2)) .

Involve a significant reduction in a margin of safety because the amend-ment does not affect any operating practices or limits nor does it affect any equipment or system important to safety. The proposed changes are administrative in nature and will not reduce the margin of safety I (10CFR50. 92 (c) (3)) .  !

CONCLUSION On the basis of the above, Toledo Edison has determined that the amendment l request does not involve a significant hazards consideration.

L.__ .

ei 1i la 1e g y _,

-- 1 ii

~ !!

i!_ 1. I - - -  !

l"" l l lII I!

! l'--"i! g'! Il !Il 1 I ~

5

?!)

i i j ((

=bl ll !

e*

-- lIl gE la I

- 'l >

Ig!

15 i l

-r

  • $"l!

gIl I g I g i8 5 4 l -

E!i

{!E \ -

I i' l / iji EEE .

I I vc l / s- t.

4 1

e l

-lE

!-! I x1

= ,

c: 5. 1 8 I I

8: / yl -

I:g i

g gr y I  : - ..;

' Es "I 15

  • l 8 l: - l. 8 i i  ! 45 I

I E 5! .t;;:5 i

I! - l l

3" 8

E

$"57 l

! - "I i i5 .39 I!1 i

8 I <\ sm 1

!  ! d t: W l l

- [I! EE8 l w t i  ! N#

I I EG I l fe h

'I I - 2 I 1 -

g i

!z  !

E I

g r1 p-l I

lI IEl t l 3!

gjE -

3!!

i

, I i!! ! Iji '33

/

l I

Ilil

t.  :

l I

I  !

N l

lI Q l

-l. -:

O I I EI \ s

[ 5?

b"C 4.- .

e eli (Q DAVIS.BESSE, UNIT-1 6-2 111 [3 Amen &nent No. 72. 27 78 98 i

L