ML20236H811
| ML20236H811 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 06/26/1998 |
| From: | Desmond N BOSTON EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-96-05, GL-96-5, LTR.#2.98.086, NUDOCS 9807070364 | |
| Download: ML20236H811 (2) | |
Text
.-_
C h"' ""
GL96-05 Pilgrirn Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360-5599 Nancy L Desmond Regulatory Relations Group Manager June 26,1998 BECo Ltr. #2.98.086 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Docket No. 50-293 License No. DPR-35 RESPONSE TO SAFETY EVALUATION - JOINT OWNERS' GROUP PROGRAM ON PERIODIC VERIFICATION OF MOTOR OPERATED VALVES
Reference:
1.
Safety Evaluation on Joint Owners' Group Program on Periodic Verification of Motor Operated Valves Described in Topical Report NEDC-32719 (Revision 2), dated October 30,1997 2.
Generic Letter 96-05, " Periodic Verification of Design Basis Capability of Safety-Related Motor Operated Valves," dated September 18,1996 3.
BECo Letter No.97-064, " Generic Letter 96-05: 180-Day Response,"
dated June 18,1997 On June 18,1997, Boston Edison transmitted to the Nuclear Regulatory Commission a letter stating our intent to follow the Joint Owners' Group (JC 3) periodic verification program for MOVs as outlined in Topical Report NEDC-32719. On October 30,1997, the NRC issued the referenced Safety Evaluation (SE) that, within the conditions and limitations described in the SE, stated the Staff considers the JOG Program on MOV periodic verification an acceptable industry-wide response to Generic Letter 96-05.
The JOG had agreed that after the issuance of the SE, participating utilities would notify the NRC of their plans to implement the JOG program described in Revision 2 of the topical kO report which was the subject of the SE.
f 4
q/
Y b
Ab 93 P
PDR 298086. doc
o.
By this letter, Boston Edison is providing the requested SE response. Boston Edison plans
- to continue participating in the JOG MOV Periodic Verification Program as a member of the Boiling Water Reactor Owners' Group and plans to implement the program elements described in Topical Report NEDC-32719, Revision 2.
Should you have any questions regarding the above subject matter, please contact Walter Lobo at 508-830-7940.
s Nancy L. Desmond WGlJib/GL 96-05 g ocym cc:
Mr. Alan B. Wang, Project Manager Project Directorate 1-1 Office of Nuclear Reactor Regulation Mail Stop: 1482 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20852 U.S. Nuclear Regulatory Commission Region i 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station l
l j
j l
298086. doc 1