ML20236H596
| ML20236H596 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/28/1987 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20236H594 | List: |
| References | |
| 50-289-87-14, 50-320-87-06, 50-320-87-6, NUDOCS 8711040224 | |
| Download: ML20236H596 (1) | |
Text
_ _
APPENDIX A NOTICE OF VIOLATION
'1 GPU Nuclear Corporation Docket Nos.
50-289
)
Three Mile Island Nuclear Generating Station 50-320 i
As a -result of the inspection conducted on July 20-24, 1987, and in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix.C) the following violation j
was identified.
A.
Item V of Appendix E to 10 CFR 50 requires licensees who are authorized to operate a nuclear power facility to submit any changes to the emergency plan or procedures to the Commission as specified in 10 CFR 50.4(b)(5) within 30 days of such changes, i
Contrary to the above, GPU Nuclear Corporation failed to submit to the NRC Revisions 1-04 " effective June 2, 1987" and 1-03 (no effective date j
given) of " Operation of the Parsipp)any Technical Functions Center",
5000-ADM-3054.01 (Rev 1-04, EP-033.
This violation has been categorized 3
as Severity IV per Item D of Supplement VIII to Appendix C to 10 CFR 2.
j l
Pursuant to the provisions of 10 CFR 2.201, GPU Nuclear Corporation is j
hereby required to submit to the office within thirty days of the date of i
this letter which transmits this Notice, a written statement or explanation in reply, including:
(1) the reasons for the violation; if 4
admitted; (2) the corrective steps which have been taken and the results achieved; (3) the corrective steps which will be taken to avoid further violations; and (4) the date when full compliance will be achieved.
Where good cause is shown, consideration will be given to extending this response time.
8711040224 B71020 DR ADOCK 050 9
0FFICIAL RECORD COPY
- _ _ _ _ _ _ _ _ _ -