ML20236G999

From kanterella
Jump to navigation Jump to search
Responds to Telcon Re License Change Application ECR 97-02809,incorporating end-of-cycle Recirculation Pump Trip Sys at Units 2 & 3.Util Is Revising Discussion of Third Std Set Forth in 10CFR50.92 as Provided in Attachment 1
ML20236G999
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/26/1998
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9807070041
Download: ML20236G999 (3)


Text

_ _ _ _ _

s A

10 CFR 50.90

~

v PECO NUCLEAR nwr-c-,

Nuclear Groto Headquarters e

A UNIT or PECO EMRcy 965 Chesterbrook Boulevard Wayne, PA 19087-5691

- June 26,1998 Docket Nos. 50-277 50-278 License Nos. DPR-44 l

DPR-56 1

l U.S. Nuclear Regulatory Commission

~ Attn: Document Control Desk N

Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station, Units 2 and 3 License Change Application ECR 97-02809

Dear Sir / Madam:

This letter is in response to a conference call between PECO Energy Company.

(PECO Energy) and Mr. Mohan Thadani (U. S. Nuclear Regulatory Commission

- (USNRC)- Project Manager) conceming License Change Application (LCA) ECR 97-02809. This LCA, which was submitted to the USNRC on March 20,1998 (letter from G. D. Edwards (PECO Energy) to USNRC), will revise the Technical Specifications (TS) to incorporate an End-of-Cycle Recirculation Pump Trip (EOC-RPT) System at Peach Bottom ~ Atomic Power Station (PBAPS), Units 2 i

and 3.

As a result of this conference call, PECO Energy is revising our discussion of the third standard set forth in 10 CFR 50.92, as provided in the "Information l

Supporting a Finding of No Significant Hazards Consideration" contained in I

l

! of LCA 97-02809. This revision does not alter our conclusion that the proposed change to the PBAPS, Units 2 and 3 Technical Specifications does 3

)

0 not involve a Significant Hazards Consideration. This revision is as follows:

0 9907070041 990626 '

I L

PDR ADOCK OS00027p l

p PDRa

' June 26,1998-Pag 3 2 3.

The orooosed TS chanaes do not involve a significant reduction in a

  • marain of safety.

[ '-

There are no significant reductions in any margin of safety previously y

approved by the USNRC as a result of this change to the TS.The EOC-RPT System will ensure that fuel thermal limits are not exceeded during the limiting transient. In the event that the EOC-RPT System is

' determined to be inoperable,' specific operating limits are provided in the -

' COLR. In all cases, thermal limits are not exceeded and the margin of safety is not significantly reduced.

The plant LOCA response will not chaage for present core configurations (i.e.,9 x 9 fuel) with the EOC-RPT Syst 3m installed. For GE 8 x 8 fuel, which could be used at a future time, there could be a small increase in Peak Cladding Temperature (PCT). This increase would still be well below the 2200 F acceptance limit defined in 10 CFR 50.46.

There will be no significant reduction in the margin of safety as previously.

approved by the USNRC, since the calculated increase in peak cladding temperature for a core containing limiting 8 x 8 fuel design (BP/P8 x 8R) is i

a small increase above the previously analyzed peak cladding '

temperature. Additionally, this modification does not impact the safety '

function of the RRS piping, thus reactor coolant pressure boundary safety--

limits are not affected.

~

If you have any questions, please do not hesitate to contact us.

I Very truly yours, h

~ Garrett D. Edwards Director-Licensing

Enclosure:

Affidavit I

cc:-

H.~ J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident inspector, PBAPS R. R. Janati, Commonwealth of Pennsylvania L

L

___________-____a

I

~ COMMONWEALTH OF PENNSYLVANIA:

l ss.

. COUNTY OF CHESTER a

'I

~J. B. Cotton, being first duly sworn, deposes and says:

That he is Vice President of PECO Energy Company; the' Applicant herein; that he has read the attached additional information conceming License i

Change Application ECR 97-02809, for Peach Bottom Facility Operating.

i l

Licenses DPR-44 and DPR-56,'and knows the contents thereof; and that the' statements and matters set forth therein are true and correct to the best of his knowledge, information and belief, i

l&

W Vice President 1

Subscribed and sworn to I

before me this J4 day of.

1998.

u b.

'/

Notary Public NOTARIAL SEAL carol A. WALTON, Notary Pullte My r

y l

c-

_w _

__