Advises That Correct Ltr Number for Re Fire Recovery Plan Should Be P-87374 & Not P-87347
ML20236G343
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 10/26/1987
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
P-87383, NUDOCS 8711020503
Download: ML20236G343 (1)


Text

- __

h Public Servico-

= a "/ A,..

2420 W. 26th Avenue, Suite 1000, Denver, Colorado 80211 October 26, 1987 Fort St. Vrain Unit No. 1 P-87383 U.S. Nuclear Regulatory Commission ATTNS:

Document Control Desk Washington, DC 20555 Docket No. 50-267

SUBJECT:

Correction of P-Letter Number Gentlemen:

PSC inadvertently submitted a letter, concerning the Fort St. Vrain fire recovery plan (P-87347) which had been improperly numbered. The correct letter number should be P-87374.

Please destroy letter P-87347 dated October 19, 1987, Williams to Document Control Desk concerning the Fort St. Vrain Fire Recovery Plan and replace it with the correctly dated letter P-87374 (attached).

Should you have any questions concerning this matter, please contact Mr. M. H. Holmes (303) 480-6960 for further information.

Very truly yours, Y

U" W

H. L. Brey, Manager Nuclear Licensing and Fuels Division.

dd N

00 0711020503 871026 h{

PDR ADOCK 05000267

\\

F PDR

i O Pubiic service-

=: <=. -

October 19, 1987 Fort St. Vrain Unit No. 1 P-87374 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 Docket No. 50-267 l

l

SUBJECT:

Fort St. Vrain i

Fire Recovery Plan Gentlemen:

The Public Service Company of Colorado (PSC) is in the process of assessing the cause and the extent of damage resulting from the October 3,

1987 fire in the Fort St. Vrain (FSV) turbine building.

PSC is formulating a detailed plan which encompasses:

(1) the I

recovery from the fire, (2) the return of the Fort St. Vrain plant to operation, and (3) the longer term assessment of the broader implications of the fire in both the technical and operational l

aspects of Fort St. Vrain.

Based on the post-fire cleanup and I

inspections accomplished to date, PSC's initial assessments and a l

detailed fire recovery plan are expected to be ready for review with the NRC in two weeks.

PSC proposes -that a meeting with the NRC be held in two weeks at Region IV headquarters in Arlington, Texas at which time PSC would present its detailed FSV fire recovery plan as well as plans for restart.

Short term and long term activities will be identified to restore the plant to operational status and to prevent future recurrence.

PSC will keep the Senior Resident Inspector fully informed of our progress in the recovery plan process and intends to maintain Fort St. Vrain in a shutdown condition until the issues associated with this matter are resolved.

PSC will be in contact with NRC personnel to set a mutually acceptable meeting date and

time, em m ;

-n O 7 I V J u v / J '/ __ d 7'x n,

y P-87374 October 19, 1987 I

If you have any 1

M. H. Holmes at (questions concerning this matter, please contact Mr.

1 303) 480-6960.

1 Very truly yours, tifs R. O. Williams, Jr.

Vice President Nuclear Operations R0W/MHH:dvd 1

I cc: Regional Administrator, Region IV l

ATTN: Mr. T. F. Westerman, Chief i

Project Section P l

l Mr. Robert Fat rell Senior Resident Inspector Fort St. 5' rain i

4

-l l

I l

l o

1