ML20236G329

From kanterella
Jump to navigation Jump to search
Forwards List of SAR Titles Received or Expected to Receive from West Valley & SER Commitment Dates.Requests Comments on Cement Solidification Sys SAR by 870930
ML20236G329
Person / Time
Issue date: 07/30/1987
From: Rouse L
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Lohaus P
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
REF-PROJ-M-32 NUDOCS 8708040212
Download: ML20236G329 (2)


Text

_

M-32 3

MEMORANDUM FOR: Paul H. Lohaus, Chief Operations Branch Division of Low Level Waste Management and Decommissioning FROM:

Leland C. Rouse, Chief Fuel Cycle Safety Branch Division of Industrial and Medical Nuclear Safety

'i

SUBJECT:

REVIEW 0F SAR's ON THE WEST VALLEY DEMONSTRATION e!

PROJECT I

We want to be sure that the Low-Level Waste Management staff is aware of the i

Safety Analysis Report (SAR) volumes we have received from the West Valley Demonstration Project (WVDP), and that the responsibilities of our two divisions

)

in reviewing these documents are agreed. To this end we have enclosed a list of the SAR titles we have received or expect to receive from West Valley, along with the dates by which we are committed to respond with a Safety Evaluation Report (SER). We have also indicated in which cases we believe a LLWM contri-bution to the SER is necessary.

In two cases, Class A waste disposal and Class B/C waste di:;posal, we consider the SER's to be solely your responsibility, and have, the'refore, not set due dates.

In the other cases, the NRC West Valley Project Manager will coordinate the comments of our two divisions, along with the contributions of any other divisions that may be required.

In each case, a single NRC SER will be prepared for each SAR volume.

The next SER due is for the cement solidification system. We would appreciate receiving LLWM's comments on the cement solidification system SAR by September 30, 1987.

Original Signed by 870B040212 870730 Leland C. Rouse, Chief FROJ

@2 PDR Fuel Cycle Safety Branch Division of Industrial and Medical Nuclear Safety

?

Enclosure:

As stated W80 'I

'

  • LlMPli3f cc:

R. E. Cunningham i

1 ) (;0f _.

DISTRIBilTION w/ enclosure LProject:M-321 GATerry IMSB R/F FCM._

PDR DHurt FBrown g,

LCRouse IMAF R/F NDavison g..g _

,91) { ProK. # b-

.[b...[

l....

__.[

.. b. r.'.[..........

ldavi' son:

ry

L Rcuse, gg p!Ed NAME:DHurt/as :

wn

..............,........c g....

DATE:7/30/87

7/$l/87
7/P /87
/20/87
7/687
LPDR-= ~g- - -

0FFICIAD' RECORD COPY g/ggj l

- SS.396

JUL 3o jggy i

i WEST VALLEY SAR REVIEW l

SAR VOLUME DATE REC'd DATE SER REVIEW REQUIRED BY

.....?

i DUE IMSB LLWM HLWM SGTR Project Overview and 20 Jun 85 Complete yes no no yes General Information

]

Cement Solidification 17 Nov 86 31 Oct 87 yes yes no no System, Revision 1 Supernatant Treatment 15 Aug 86 30 Sep 87 yes no no no System, Revision 1 Liquid Waste Treatment 4 Aug 86 31 Oct 87 yes no no no System Class A Radioactive 30 Sep 86 no yes no no Waste Disposal Class B/C Radioactive 5 Dec 86 no yes no no Waste Disposal, Revision 1 Vitrification System, 17 Mar 87 1 Sep 88 ycs no yes no Revision 1 Sludge Mobilization not yet yes no no no System ilLW Storage not yet yes no yes no Final D&D not yet yes yes no no i

Waste Shipment not yet yes no no yes l

l

-_______-__-Q