EVETEM ENERGY REE0tAiCEE, INC.
Ouvtp D. Kecsuv. A EffUY7&ns July 30,.1987 U.S. Nuclear Regulatory Commission Wash,ington, D.C.
20555 Attention: Document. Control Desk Gentlemen:
SUBJECT:
Grand' Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No.
CPPR-119 Transmittal of Environmental Protection Program Report for Six Months Ending June 30, 1987 AECM-87/2-0004 Attached is a report entitied "Sumary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 for Six Months Ending June 30, 1987". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Pernit No. CPPR-119.
Please' contact my office if you have any questions concerning this report.
Yours ruly,
\\
.0DK:bms Attachment I
cc:
(See Next Page) 3
)
[.
8708040173 870730 PDR ADOCK 05000417 R
\\
" ## ~*
J16AECM87072304~- 1 1
A ume wee cmyy i
AECM-87/2-0004 Page 2 cc: Mr. T. H. Cloninger (w/a)
Mr. H. L. Thomas (w/o)
Mr. R. B. McGehee (w/a)
Mr. R. C. Butcher (w/a)
Mr. N. S. Reynolds (w/a)
Dr. J. Nelson Grace, Regional Administrator (w/a)
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue i
Bethesda, Maryland 20814 I
J16AECM87072304 - 2
a q;- c
<~
Attachment to AECM-87/2-0004 4,
SUMMARY
OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX MONTHS ENDING JUNE 30, 1987 Construction Highlights o
Unit 2 construction was suspended in September 1985 with approximately 35% of field construction. completed based on the estimated manhours needed to complete the Unit. Minimal Unit 2 activities were for the purpose of long term equipment and structural maintenance.
Vehicular Movement o
No "off limit" violations were observed during the reporting period.
Dust Control o
No dust control violations were observed during the reporting period.
Smoke Control o
No smoke violations occurred during the six-month reporting period.
Erosion Control o
Rainfall was recorded on 45 occasions during the reporting period, with an accumulated rainfall of 31.92 inches.
Chemical & Solid Waste Control o
No violations or improprieties of Mississippi waste disposal regulations occurred.
Noise Control o
No excessive noise levels were detected during the reporting period.
Sediment Basins A & B o
There were no problems with either basin during the six-month reporting period.
l J16AECM87072304 - 4
l 1
e Attachment to AECM-87/2-0004 Regional Groundwater Dewatering Wells o
The 12 regional groundwater wells were read 13 times during the reporting period.
Fluctuations in water levels could be attributed to heavy rainfall prior to monitoring activities.
o The perched aquifer wells were read monthly during the reporting period. No well exceeded the 109 feet Mean Sea Level design basis for GGNS.
Vegetation Survey o
No vegetational abnormalities were observed during the reporting period.
Transmission Lines o
No erosion problems associated with the GGNS transmission lines were identified during the reporting period.