Forwards Summary of Environ Protection Program Respecting Const of Grand Gulf Nuclear Station Unit 2 for 6 Months Ending 870630
ML20236G238
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 07/30/1987
From: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
AECM-87-2-0004, AECM-87-2-4, NUDOCS 8708040173
Download: ML20236G238 (4)


Text

1

a'
i

(

EVETEM ENERGY REE0tAiCEE, INC.

Ouvtp D. Kecsuv. A EffUY7&ns July 30,.1987 U.S. Nuclear Regulatory Commission Wash,ington, D.C.

20555 Attention: Document. Control Desk Gentlemen:

SUBJECT:

Grand' Gulf Nuclear Station Unit 2 Docket No. 50-417 Construction Permit No.

CPPR-119 Transmittal of Environmental Protection Program Report for Six Months Ending June 30, 1987 AECM-87/2-0004 Attached is a report entitied "Sumary of Environmental Protection Program Respecting Construction of Grand Gulf Nuclear Station (GGNS) Unit 2 for Six Months Ending June 30, 1987". This report is submitted as required by Staff Exhibit 2-A referenced in Subsection 3.E.1 of Applicant's Construction Pernit No. CPPR-119.

Please' contact my office if you have any questions concerning this report.

Yours ruly,

\\

.0DK:bms Attachment I

cc:

(See Next Page) 3

)

[.

8708040173 870730 PDR ADOCK 05000417 R

PDR

\\

" ## ~*

J16AECM87072304~- 1 1

A ume wee cmyy i

AECM-87/2-0004 Page 2 cc: Mr. T. H. Cloninger (w/a)

Mr. H. L. Thomas (w/o)

Mr. R. B. McGehee (w/a)

Mr. R. C. Butcher (w/a)

Mr. N. S. Reynolds (w/a)

Dr. J. Nelson Grace, Regional Administrator (w/a)

U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue i

Bethesda, Maryland 20814 I

J16AECM87072304 - 2

a q;- c

<~

Attachment to AECM-87/2-0004 4,

SUMMARY

OF ENVIRONMENTAL PROTECTION PROGRAM RESPECTING CONSTRUCTION OF GRAND GULF NUCLEAR STATION (GGNS) UNIT 2 FOR SIX MONTHS ENDING JUNE 30, 1987 Construction Highlights o

Unit 2 construction was suspended in September 1985 with approximately 35% of field construction. completed based on the estimated manhours needed to complete the Unit. Minimal Unit 2 activities were for the purpose of long term equipment and structural maintenance.

Vehicular Movement o

No "off limit" violations were observed during the reporting period.

Dust Control o

No dust control violations were observed during the reporting period.

Smoke Control o

No smoke violations occurred during the six-month reporting period.

Erosion Control o

Rainfall was recorded on 45 occasions during the reporting period, with an accumulated rainfall of 31.92 inches.

Chemical & Solid Waste Control o

No violations or improprieties of Mississippi waste disposal regulations occurred.

Noise Control o

No excessive noise levels were detected during the reporting period.

Sediment Basins A & B o

There were no problems with either basin during the six-month reporting period.

l J16AECM87072304 - 4

l 1

e Attachment to AECM-87/2-0004 Regional Groundwater Dewatering Wells o

The 12 regional groundwater wells were read 13 times during the reporting period.

Fluctuations in water levels could be attributed to heavy rainfall prior to monitoring activities.

o The perched aquifer wells were read monthly during the reporting period. No well exceeded the 109 feet Mean Sea Level design basis for GGNS.

Vegetation Survey o

No vegetational abnormalities were observed during the reporting period.

Transmission Lines o

No erosion problems associated with the GGNS transmission lines were identified during the reporting period.