Responds to NRC Re Violations Noted in Insp Rept 50-482/87-20.Corrective Actions:Permanent Signs Posted on Door 36171 & Similar Doors Informing That Doors Part of Control Room Pressure Boundary
ML20236F613
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 10/28/1987
From: Withers B
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
WM-87-0289, WM-87-289, NUDOCS 8711020235
Download: ML20236F613 (3)


Text

________

s' W$LF CREEK NUCLEAR OPERATING CORPORATION Bart D. Withers President arxl CNef Executbre Omcer October 28, 1987 i

WM 87-0289

)

U. S. Nuclear Regulatory Commission ATTH:

Document Control Desk Washington, D. C. 20555 l

Reference:

Letter dated 9/30/87, from J. E. Gagliardo, NRC, to l

B. D. Withers, WCNOC

Subject:

Docket No. 50-482:

Response to Violation 482/8720-01 Gentlemen:

Attached is a detailed response to violation 482/8720-01 which was documented in the Reference.

Violation 482/8720-01 concerns a failure to enter Technical Specification 3.0.3 when both trains of the control room emergency ventilation system were inoperable when a door was blocked open.

If you have any questions concerning this matter, please contact me or Mr.

O. L. Maynard of my staff.

1 Very truly yours, l

l Bart D. Withers President and Chief Executive Officer l

BDW/jad Attachment oc:

P. W. O'Connor (2)

R. D. Martin J. E. Cummins C. A. Hackney 8711020235 871028 f

PDR ADOCK 05000482 I

[O Q

PDR I

l RO. Box 411/ Burlington, KS 66839 / Phone: (316) 364 8831 l

An Equal opportunity Ernployer MfiHCNET

)

p g

.v p

i i

Attachment.-to WM 87-0289:

Page 1 of.2-October 28, 1987.

Technical Skeoirication I

Violation'-(482/8720 01): F_ailure: To Entet g

(TS). 3. _0. 3 9

, Finding:.

Technical ' Specification. 3.0.3 requires, in part, "When a limiting. condition 1

for Joperation.is not ' met,

.except 'as provided'in the tasociated actior:

j requirements, within 1-hour action'shall be initiated to place.the unit in 'a mode in which the specification does not apply..."

l d

TS 3.7.6. requires, "Two iisdependent control room emergency ventilation l

systems shall be operable."

~

')

?

Contrary to the above, on August 20, 1987, the NRC inspector observed both.

1 trains of'the control room emergency ventilation system inoperable when Door

36171 was. blocked open preventing the control room' from being, pressurized to 1

]

greater than or equal.25 inches of water.

b

-}

Reason For Violation:

1 i

i On August'20,

1987, at approximately 1330 CQU _ the NRC Resident. Inspector i

found Door 36171, which separates the ControY) Room from an electrical chase l

area, propped open for rework of penetrations by Facilities and Modification (F&M) personnel.

The Shift Supervisor was awaie of the rework activitf,1 but was unaware that it required thq door to be propped open.

Witt this door

~

open, it was concluded that positiv'e pressure could not be maintal'ned in the

~

Control Room which is' contrary 'to Technical Specifications (TS) and should have resulted in TS 3.0.3 entry;; 3; This violation has been attributed to a failure to ' ef fec tivel y communicate between the. Shift Supervisor involved and the-F&M pirsonnel performing the work activity.

This Technical Specification violation was reported,to ythe NRC in LER 87-034-00.

,j Corrective Steys Which Have Been Taken and Results Achieved: /

The Shi ft Supervisor promptly took compensatory measures upon notification that the door was propped open to restore the operability of both Control Room Emergency Ventilation Systems.

Corrective Steps Which Will_ Be Taken To Avoid Further Violations:

f In order to prevent the recur'rence of this event, the following corrective actions have been implemented:

(1)

Permanent signs have been posted on Door 36171 and two other similar doors informing personnel that the doors are part of the Control Room -

pressure boundary and the Control ?oom must-be contacted prior to initiating any work that would require propping the doors open.

I e

]

p[ 3.

%y

$\\ f

~,

7.,

?

L 'i Pf r

L Attachment to WM 87-0289

)

  1. 1

[ M

'Page'2 of 2

?

I" October 28, 1987' i

Ij%

JP i

w P

(2)

.F&M Engineers have been instructed to include precautionary statements j

into their work packages to emphasize pressure boundary considerations -

prior to' starting work.

(3)-

F&M personnel, including Contractors,. have been instructed to contact-

. Control Room personnel when work could affect a pressure boundary.

{

A change has been made' to' the Control Room. Ventilation Isolation I

-(4)'

L Signal alarm response procedure to close the doors if.open.

I 1

K

'(5)

LER 87-034-00 has been added to Operations' Required Reading to remind fx.

^

' licensed personnel of the importance of considering potential effects 67 on pressure boundaries when authorizing work activities.

er Date When Full Comp,liance Will ~ Be Achieved:

1

  1. j-%I Full. comp 11ance:has been achieved.

Yb:'

a.

=!

k l

l o

n NAE'-

. i_%_m

.&