Provides Info Re Status of Issues Re Control Room Habitability Survey of Region IV Plants,Requested During June 1987 Telcon
ML20236F475
Person / Time
Site: Cooper, Arkansas Nuclear, Fort Calhoun, 05000000
Issue date: 07/30/1987
From: Hayes J
Office of Nuclear Reactor Regulation
To: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20236F478 List:
References
NUDOCS 8708030358
Download: ML20236F475 (4)


Text

.--

. JUL 3 01997 v

MEMORANDUM FOR: Blaine Murray, Chief Distribution List l Facilities Radiological Control Section (Docket.Nos.:50-313 -

Region IV w368,1298L285A Public Document room G. Lainas l FROM: John J. fl ayes, Jr., Project Engineer J. Hayes Project Directorate 11-1 PD21 r/f Division of Reactor Projects I/II

SUBJECT:

STATUS OF ISSUES INVOLVING CONTROL ROOM HABITABILITY SURVEY OF REGION IV FLANTS Durirg a June 1987 telephone call with you, you requested that the status of the issues which remain open for plants involved in the' control room l l

habitability survey be provided to you. The status is as follows: )

1) The status of the Cooper Station is reflected in the memorandum to John Craig, Chief, Plant Systems Branch from William Long, Cooper Project Manager dated June 9,1987 and enclosed with this memorandum ,

as Attachment 1.

2) The findings of the survey of " = Fort Calhoun survey have been trans-mitted to the licensee in a lesr dated May 28, 1987, and a response was requested within 45 days. The project manager indicated that the licensee's response will be forthcoming in mid-August. This response will be reviewed by the Plant Systems Branch. A copy of the letter transmitted to the licensee is included as Attachment 2 to this memorandum.
3) The ANO report was issued to the Unit 1 and Unit 2 Project Managers on July 27, 1987. A copy of the report is to be issued to the licensee by

' the Project Managers. A copy of this report is included r.s Attachment 3 and is provided for your use.

If you have any questions concerning the status described above in Attachments 1 - 3, please contact either John Craig of the Plant Systems Branch or the NRR (

project manager, since in my new job I will no longer be working in this area.  !

John J. Hayes, Jr., Project Engineer Project Directorate 11-1 Division of Reactor Projects I/II

Enclosures:

As stated cc: ,See next page

1 1:DRPR S[

Jayps%RP'R E'A sam JCra,ig 7/ 87 7f 87 7f)MJ87

)

8708030350 a70730 PDR ADOCK 05000205 P PDR

cc: E. Adensam l R. Bangart J. Craig G. Dick j R. Lee W. Long l A. Bournia 1

1 1

i l

4 4

i

.< ,w s JK 3 OT s

MEMORANDUM FOR: Blaine Murray, Chief Distribution List Facilities Radiological Control Section Docket Nos. 50-313, ,

Region IV 368, 298, 285 J Public Document room G. Lainas FROM: John J. Hayes, Jr., Project Engineer J. Hayes Project Directorate 11-1 PD21 r/f Division of Reacter Projects I/II

SUBJECT:

STATUS OF ISSUES INVOLVING CONTROL ROOM HABITABILITY SURVEY OF REGION IV PLANTS During a June 1987 telephone call with you, you requested that the status of the issues which remain open for plants involved in the control room habitability survey be provided to you. The status is as follows:

1) The status of the Cooper Station is reflected in the memorandue to John Craig, Chief, Plant Systems Branch from William Long, Cooper Project Manager dated June 9,1987 and. enclosed with this memorandum as Attachment 1.
2) The findings of the survey of the Fort Calhcun survey have been trans-mitted to the licensee in a letter dated May 28, 1987, and a response was requested within 45 days. The project manager indicated that the '

licensee's response will be forthcoming in mid-August. This response will be reviewed by the Plant Systems Branch. A copy of the letter transmitted to the licensee is included as Attachment 2 to this memorandum.

3) The ANO report was issued to the Unit 1 and Unit 2 Project Managers on July 27, 1987. A copy of the report is to be issued to the licensee by the Project Managers. A copy of this report is included as Attachment 3 and is provided for your use.

If you have any questions concerning the status described above in Attachments 1 - 3, please contact either John Craig of the Plant Systems Branch or the NRR project manager, since in my new job I will no longer be working in this area.

John J. Hayes, Jr., Project Engineer Project Directorate 11-1 l Division of Reactor Projects I/II l

Enclosures:

As stated I l

cc: See next page i h!:P lidRPR i

D: PD21:DRPR JHayes EAddnsam 1 I

7/, )'87 pJCraig l 7/QB7 7/)%87 l

a p-C. a 4-cc: E. Adensam R. Bangart J. Craig G. Dick R. Lee

. Long

. Bournia l

i 4

l I

i

!