June 27,1998
)
Mr. John K. Wood
Vice President - Nuclear
Davis-Besse Nuclear Power Station
Centerior Service Company
5501 North State Route 2
Oak Harbor, OH 43449
SUBJECT:
NRC RADIATION PROTECTION INSPECTION REPORT 50-dS/98010(DRS)
AND NOTICE OF VIOL.ATION
i
Dear Mr. Wood:
On June 11,1998, the NRC completed a routine inspection at your Davis-Besso Nuclear Power
Station. The enclosed report summarizes the results of this inspection.
)
The inspection was an examination of activities conducted under your license as they relate to
i
l
radiation safety and to compliance with the Commission's rules and regulations and with the
conditions of your license. The inspection consisted of a selective examination of procedures
and representative records, observations, and interviews with personnel. Specifically, the
1
inspection focussed on the radiological effluent monitoring and control program, including
process monitor calibration and Offsite Dose Calculation Manual (ODCM) implementation, the
maintenance of the station emergency and control emergency ventilation systems, and the ' solid
i
radioactive waste management and transportation program.
Overall, the radiological effluent monitoring and control, and solid radioactive waste
management and transportation programs were effectively implemented. Effluent releases
remained low,' associated offsite dose ~was calculated in accordance with the ODCM, and both
process monitors and emergency ventilation systems were adequately maintained and
1
calibrated or tested, as applicable. Solid radioactive waste was characterized, packaged, and
j
shipped in accordance with regulatory requirements and station procedures. Station personnel
j
responsible for these areas maintained good oversight of the programs and displayed a sense
.of ownership.
j
However, one violation of regulatory requirements was identified for failing to audit the Process
. Control Program (PCP) and radioactive waste processing activities at the required interval.
Additionally, a weakness was identified with the development of the PCP, conceming the
frequency that dewatered wet wastes were sampled and verified to ensure that regulatory limits
j
.
for free standing liquid were met. Several examples of documentation errors in the annual
,
[ -.
effluent report and ODCM were also identified.
'[
l
h bo
9007020068 990627
1
,
L
ADOCK 05000346
j.
i
i
G
L
1
l
l-
-
__
_ _ _ _ . _ _
. _ _ _ _ _ _ _ _ _ _ _ . . _
-_.
.
._-
- _ _ - _ _
_ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ -
_ - _ - _ - _ - _
__
,e
.
.
~
'J, Wood '
2
.
- The violation is cited in the enclor,ed Notice of Violation (Notice), and the circumstances
surrounding it are described in detailin the enclosed report. Please note that you are required
to respond to this letter and should follow the instructions specified iri the enclosed Notice when
preparing your response. The NRC will use your response, in part, to determine whether
further enforcement action is necessary to ensure compliance with regulatory requirements.
In accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter, its
enclosures, and you response to this letter will be placed in the NRC Public Document Room.
We will gladly discuss any questions you have conceming this inspection.
Sincerely,
Original Signed by Melvyn Leach
John A. Grobe, Director
Division of Reactor Safety
Docket No. 50-346 -
License No. NPF-3
Enclosures:
2. Inspection Report 50-346/98010(DRS)
cc w/encis:
J. Stetz, Senior Vice
President - Nuclear
J. Lash, Plant Manager
J. Freels, Manager
i
l
' Regulatory Affairs
'
M. O'Reilly, FirstEnergy
S; ate Liaison Officer, State
of Ohio
R. Owen, Ohio Department
i
of Health
C. Glazer, State of Ohio
l
Public Utilities Commission
DOCUMENT NAME: G:DRS\\DAV98010.DRS
To receive e copy of this document. Indicate in the bou: "C" a Copy without ettechment/ enclosure "E" * Cgy vnth attechmentienclosure
"N" = No c@y
OFFICE
Rlli
lE
Rlli
lC. Rlli
.,l.
Rlli
l
NAME
Slawinski/Shatthf,( GShear ALS
TKozak % V V /a JGrobe//sM
l
DATE
06/;5798
06/X/98
06/d98
'/ f
06/#/98
OFFICIAL RECORD COPY
_ . _ - _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ - - _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - - ._-___- ___ -_ _ __-_ _ - _ _ _ _ __ __ - - _
fj ',
1 :;
' . < '
J. Wood
3
,
- Distribution:
Project Mgr., NRR w/encls
i
C. Paperiello, Rlli w/encis
j
J. Caldwell, Rlli w/encls
B. Clayton, Rlll w/encls .
SRI Davis-Besse w/encls
DRP w/encls
i
TSS w/encls
!
DRS w/encls -
Rill PRR w/encls
'
PUBLICJE-OHv/encls
b
'
Docket File w/encls
GREENS
LEO (E-Mail)
..
- DOCDESK (E-Mail)
i
!
i
!
- \\;
'
i
L.
)
'
!
I
L
L
010049
l
(
- .
'l
l1
.)