Forwards Rev 1,Vol 2 to Pilgrim Nuclear Power Station Apps to Restart Plan
ML20236F115
Person / Time
Site: Pilgrim
Issue date: 10/26/1987
From: Bird R
BOSTON EDISON CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20236F025 List:
References
NUDOCS 8710300153
Download: ML20236F115 (3)


Text

-

aosimousm 1

Executive Offices I

. '(D :

.800 Boylston Street f

(.

Boston, Massachusetts 02199

.]

)

4

-)

Ralph G. Bird Senior Vice President - Nuclear 26 October 1987 4

l U.S. Nuclear' Regulatory Commission

{

Document Control Desk i

Washington, D.C.

20555 i

)

License No:

DPR-35 Docket No:

50-293

Subject:

Pilgrim Nuclear Power Station Restart Plan Updated Results

~

Dear Sir:

~

.The Pilgrim Nuclear Power Station (PNPS) Restart Plan, Volume

1.. and ' Volume 2,

Revision 0 were transmitted to the United States Nuclear Regulatory Commission on July 30, 1987.

This' letter transmits for information, Volume 2,

Revision 1 which is the first ' installment of updated results for the Pilgrim Nuclear Power Station (PNPS) Restart' Plan.

Boston.

Edison presently plans to submit final results (Volume 2,

. Revision 2) to the NRC one week after commencement of the NRC diagnostic inspection.

i The Restart Plan describes the programs, plans and actions considered necessary by Boston Edison Company management for restart and for continued safe and reliable i

operation of Pilgrim Nuclear Power Station.

The Restart Plan consists of two volumes.

Volume 1

is primarily a

programmatic description and contains a limited description i

of the results of Boston Edison's restart efforts.

Volume 2 consists of a set of Appendices that provides additional results.

Appendix 7 to volume 2,

which will provide a summary status of restart actions in the Radiological Action Plan, will be submitted with a future revision of Volume 2 when the Radiological Action Plan has been completely developed, s

BDO3g,g$ $ [6293 l

Fuk i

PDR P

gg l

.q m

Y r

4 g

- m f

I k?

h

[ f:;

~_y*

q wg.

]

  • M 1U.S.-Nuclear Regulatory Commission ~

iDocumentLControl' Desk:

~

26 Octobe'r?19871

-Page.:.

2>

Appendix 9.to : Volume 2 constitutes the. third-status.

1 address-1 summary of actions 1 undertaken byT Boston Edison. to ~

The 1

. concerns - presented; during ' Managements. Meeting 86-41.._

first.. two _ status ' : reports were submitted by-Boston ' Edison

' letters =on 1LMarch 1987 and..6 May.1987.

Future revisions to:

~

Appendix-9, : submitte.d' with ' revisions. to' Volume ' 2 of the -

' Restart Plan,.will be ~ used - to update the status of-these

' actions.

1 1

Appendix 10Lto. Volume 2-presents a summary of the status-

-]

.of BostoniEdison actions;on restart commitments to' NRC.

The

~~f this. summary has been changed since~ Lit,was

-structure o

originally. defined-in : Volume 1 page' V-9.

It ~ now: :will'.

summarize - the issues,.theocorresponding actions and closure.

status but' not the acceptance ciriteria or' recommended closure j

process for-these issues.

The acceptance Lcriteria and the i

do

- Boston' Edison recommended closure' process are included in.the-

- s~

(

Appendix'10' data-base.

The acceptance. criteria,.theiclosure

requirements, and the' closure documentation for. ~ each item will be'available on site for NRC review..

' Appendix.11 to Volume 2 summarizes changes Boston Edison.

1 is making-Ltol certain of the commitments in Appendix 10.

These changes result _ from management : reviews and the basis-for each! change is' identified in Appendix ~11.

l Boston-. Edison submitted the-description. of the Power l

Ascension Program and associated -Boston Edison process 'for assessment of performance during power ascension to the United States Nuclear Regulatory Commission on October 15, 1987.

Accordingly, Boston Edison will not submit Volume 2, Appendix 13 to the NRC.

1 d

j 4

__.___m_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _

-3 76 1

i l

ll>

U.S.: Nuclear Regulatory! Commission Document Control Desk-126 October.1987

Page:' 3

)

o 1

w' Please -feel free to : contact me ' or R. A.

Ledgett of my

]

staff,. if you have-any questions or need. additional 1

information.concerning the PNPS Restart Plan.

{

~!

-4 j i

i 7d R.

G.

Bird l

s Attachment cc:

U.S.. Nuclear Regulatory Commission - Region I

.4)

King of Prussia, PA 19406 i

631 Park Avenue s

William T.

Russell, Regional Administrator U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, PA.19406 R; H. Wessman, Project' Manager

' Division of Reactor Projects I/II Office of Nuclear Reactor' Regulation U.S.

Nuclear Regulatory Commission 7920 Norfolk Avenue Bethesda,-MD 20814 Senior NRC Resident Inspector -

Pilgrim Nuclear Power Station l

I (b

\\