MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20057E4861993-08-0606 August 1993 Trip Repts of NRC Observation of Thermo-Lag Fire Barrier Test Specimen Const by Util for Qualification of Thermo-Lag Fire Barriers Installed in Facility & NUMARC for Generic Qualification of Thermo-Lag Fire Barriers in Industry ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20205T6041988-11-0707 November 1988 Summary of 880929 Meeting W/Util in Rockville,Md Re Plant Sys Branch FSAR Review.Problem Areas Include Reliability of Station Svc Water Sys & Util Relief Request from broad-scope Rule Amend GDC 4 Concerning Pressurizer Surge Line.W/Agenda ML20206E9051988-10-31031 October 1988 Summary of 881005-06 Meetings W/Util in Rockville,Md Re Proposed Changes to Tech Specs.Related Info,Including Meeting Notice W/Agenda,List of Attendees & Annotated Summary of All Unreviewed Generic Changes Encl ML20205N7911988-10-31031 October 1988 Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl ML20207P1081988-10-0404 October 1988 Summary of 880922 Meeting W/Util in Rockville,Md Re Tech Specs & Util Prioritization of 64 Unreviewed Generic Changes Proposed for Facility ML20155G3311988-10-0404 October 1988 Summary of 880111-15 Meeting in Glen Rose,Tx Re Proposed Changes to First Draft Tech Specs.List of Attendees & Viewgraphs Encl ML20207L5201988-10-0404 October 1988 Summary of 880412 Meeting W/Util in Rockville,Md Re Planned Changes to Tech Spec 6.0 Concerning Administrative Controls, Tech Spec Development & Review Schedule & NRC Review of Proposed Tech Spec Changes ML20155C7271988-09-30030 September 1988 Summary of 880921 Meeting W/Util in Rockville,Md Re Chemical Engineering Branch Review of Fsar.List of Attendees,Meeting Notice & Agenda Encl ML20155G2041988-09-30030 September 1988 Summary of 880317-18 Meeting W/Util in Rockville,Md Re Fire Protection Programon Program in Response to Open & Unresolved Items in Insp Rept 50-445/87-22.Util Attends to Submit Advanced Draft FSAR Changes by Early May 1988 ML20155C7241988-09-30030 September 1988 Summary of 880321 Meeting W/Util in Rockville,Md Re Attenuation of Jets from high-energy Line Breaks.Meeting Notice,List of Attendees & Handouts on Jet Impingement Loadings Encl ML20154L7101988-09-20020 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Emergency Plan Since Rev 8 Was Reviewed by Staff & Results of Review Documented in Safety Ser.Meeting Notice & List of Attendees Encl ML20154J8911988-09-19019 September 1988 Summary of 880907 Meeting W/Util in Rockville,Md Re Bounding Analysis for Stress Condition Pressurizer Surge. List of Attendees & Presentation Matl Encl.Proprietary Version of Presentation Slides Also Encl ML20154C1601988-09-0202 September 1988 Summary of 880830 Meeting W/Licensee Representatives at Util Site Re Operator Training Program & License Exam Results. W/List of Attendees,Agenda & Viewgraphs ML20153F0431988-08-31031 August 1988 Summary of 880818 Meeting W/Util & Westinghouse in Rockville,Md Re Application of leak-before-break Methodology to Pressurizer Surge Line.Meeting Notice,Agenda,List of Attendees & Slides Used in Presentation Encl ML20151P1841988-07-28028 July 1988 Summary of 880614 Meeting W/Util Re Radiation Protection Organization.Meeting Notice,Agenda,List of Attendees & Util Presentation Encl ML20206H5171988-07-26026 July 1988 Summary of Allegation Review Committee 880721 Meeting Held by Telephone Re Encl Listed Allegations ML20155F4811988-05-31031 May 1988 Summary of 880523-26 Audit of Util Corrective Action Program in Glen Rose,Tx.Audit Included Review of Util Reasons for Establishing HVAC Design Validation Effort & Review of Scope of QA Technical Audit Program ML20154G3471988-05-16016 May 1988 Summary of 880512 Meeting W/Util in Rockville,Md Re Design Change Involving Backup Meteorological Monitoring Tower at Plant.List of Attendees & Viewgraphs Encl ML20150D9191988-03-17017 March 1988 Summary of 880205 Meeting W/Util in Rockville,Md Re NRC Comments on Ebasco Svcs,Inc Jet Attenuation Calculation, CPE-SI-CA-0000-645 ML20149M0791988-02-18018 February 1988 Summary of 871112 Meeting W/Util in Bethesda,Md Re Jet Impingement Effects in Break Exclusion Region of Main Steam & Feedwater Piping at Plant.Meeting Notice & List of Attendees Encl ML20149H0141988-02-12012 February 1988 Summary of 871207-11 Audit Re Implementation of Procedures for Train C Conduit Supports Less than or Equal to 2 Inches. Lists of Persons Involved W/Audit & Documents Reviewed Encl ML20149D7401988-02-0101 February 1988 Summary of 871216 Meeting W/Util Re leak-before-break Piping Analysis & Amplified Response Spectra for Floors.List of Attendees & Presentation Slides on leak-before-break & Amplified Response Spectra Encl ML20236W2641987-11-25025 November 1987 Summary of 870908-10 Audit of as-built Field Verification Program for Conduit Support Trains a & B & Train C Greater than 2 Inches at Plant.List of Personnel Involved & Walkdown Packages Reviewed During Audit Encl ML20236V9001987-11-25025 November 1987 Summary of 871028-30 Audit W/Util & S&W in Cherry Hill,Nj Re Implementation of Piping Design Criteria ML20236Q4351987-11-0606 November 1987 Trip Rept of 871007 Visit to Corporate Consulting & Development Co,Ltd,In Raleigh,Nc Re Static Tests of HVAC Ductwork ML20236L6241987-11-0505 November 1987 Summary of 870928-1001 Audit of Comanche Peak Response Team third-party Review of Cable Tray/Supports at Ofcs of Tenera in Berkeley,Ca.List of Persons Involved in Audit & Attending Exit Meeting Encl ML20236F1201987-10-20020 October 1987 Summary of 870914 Meeting W/Util & Ebasco Svcs,Inc in New York,Ny Re Resolutions to Generic Technical Issues Re Design of Conduit Supports ML20236F7621987-10-19019 October 1987 Summary of 870915 Meeting W/Util & Util Design Contractors in New York,Ny Re Resolutions to Generic Technical Issues on Structural Integrity of HVAC Design ML20236C3851987-10-16016 October 1987 Summary of 870922-24 Audit at Ofcs of S&W in Cherry Hill,Nj Re Implementation of Pipe Design Criteria.Attendance List Encl 1999-04-26
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20206C8331999-04-26026 April 1999 Summary of 980929 Meeting with Texas Utilities Electric Co Re Licensing Submittals Requesting Exemption to App K & Topical Rept Submitted in Support of Exemption Request .List of Attendees Encl ML20236X4431998-08-0505 August 1998 Summary of 980814 Meeting W/Util Re Use of Caldon Leading Edge Flow Meter for App K Exemption & Power Uprate License Amend on 980714.List of Meeting Attendees Encl ML20198H4361997-12-24024 December 1997 Summary of 971112 Meeting W/Util at NRC Ofcs to Discuss 970228 Responses to 960522 Cable Functionality Safety Evaluation.Licensee Briefly Described Revised Response to Open Item Re Fire Stops.List of Attendees Encl ML20141H9291997-07-30030 July 1997 Summary of 970717-18 Meeting W/Tue Representatives in Glen Rose,Texas Re Licensee Proposed risk-informed Inservice Testing Program.List of Attendees Encl ML20129B5921996-10-16016 October 1996 Summary of 961016 Meeting W/Util in Rockville,Md Re License Amend Request 96-005,inverters & Battery Chargers Mod ML20058J0961993-11-29029 November 1993 Summary of 930920 Meeting W/Util Re Results of Thermo-Lag Tests for Facility Fire Barrier Configurations ML20058F4501993-11-26026 November 1993 Summary of 931006 Meeting Re Possible Implementation of Improved Standard Ts.List of Attendees Encl ML20059K3131993-11-0505 November 1993 Summary of Operating Reactors Events Meeting 93-42 on 931103 ML20056D9841993-05-18018 May 1993 Summary of Operating Reactors Events Meeting 93-17 on 930512 ML20128K0041993-02-11011 February 1993 Summary of 930107 Meeting W/Utils in Rockville,Md to Provide Forum for Licensees to Present Staff W/Info Re Design, Operational & Testing Experience & Justification for long- Term Operability of Alternate Min Flow Path ML20126M2191993-01-0606 January 1993 Summary of 921217 Meeting W/Util Re Findings from Fire Protection Insp on 921116 & Related Fire Protection Issues. List of Attendees & Handouts Encl ML20128D1731992-12-0202 December 1992 Summary of 921027 Meeting W/Util in Rockville,Md to Discuss Fire Barrier Acceptance Criteria ML20126J7941992-01-0404 January 1992 Summary of Meeting W/Util Re Pressurizer Surge Line leak- before-break Analysis ML20058N9711990-08-0909 August 1990 Summary of Operating Reactors Events Meeting 90-20 on 900808 NUREG-0797, Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl1989-09-11011 September 1989 Summary of Meeting on 890905 in Rockville,Md to Discuss Ground Motion Estimates for Criner Tectonic Structure of Southern Oklahoma Aulacongen in Wichita Tectonic Province, Per Section 2.5.2 of Fsar.Viewgraphs Encl ML20245L2621989-08-0909 August 1989 Summary of 890801 Meeting W/Util in Rockville,Md Re Util Proposed Responses to NRC 890711 Request for Addl Info on Plant Operations QA Program.W/Related Info,Including Request for Addl Info,Draft Responses to Questions & Attendee List ML20247K8451989-07-20020 July 1989 Summary of 890710 Meeting W/Licensee in Arlington,Tx to Discuss Options Re Evacuation of Site Personnel During Upcoming Emergency Preparedness Exercise ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20248K5931989-04-11011 April 1989 Summary of 890406 Meeting W/Util Re Proposed Changes to Unit 1 Initial Startup Testing Program.List of Attendees & Slides Used in Util Presentation Encl ML20235G0491989-02-10010 February 1989 Summary of 890123 Meeting W/Util in Rockville,Md Re Revs 9 & 10 to Emergency Plan.Resolutions Proposed for 13 Planning Items ML20205T6041988-11-0707 November 1988 Summary of 880929 Meeting W/Util in Rockville,Md Re Plant Sys Branch FSAR Review.Problem Areas Include Reliability of Station Svc Water Sys & Util Relief Request from broad-scope Rule Amend GDC 4 Concerning Pressurizer Surge Line.W/Agenda ML20206E9051988-10-31031 October 1988 Summary of 881005-06 Meetings W/Util in Rockville,Md Re Proposed Changes to Tech Specs.Related Info,Including Meeting Notice W/Agenda,List of Attendees & Annotated Summary of All Unreviewed Generic Changes Encl ML20205N7911988-10-31031 October 1988 Summary of 881019 Meeting W/Util in Rockville,Md Re Unit 1 Tech Specs.Meeting Notice,Corrected Agenda & List of Attendees Encl ML20207P1081988-10-0404 October 1988 Summary of 880922 Meeting W/Util in Rockville,Md Re Tech Specs & Util Prioritization of 64 Unreviewed Generic Changes Proposed for Facility ML20207L5201988-10-0404 October 1988 Summary of 880412 Meeting W/Util in Rockville,Md Re Planned Changes to Tech Spec 6.0 Concerning Administrative Controls, Tech Spec Development & Review Schedule & NRC Review of Proposed Tech Spec Changes ML20155G3311988-10-0404 October 1988 Summary of 880111-15 Meeting in Glen Rose,Tx Re Proposed Changes to First Draft Tech Specs.List of Attendees & Viewgraphs Encl ML20155C7241988-09-30030 September 1988 Summary of 880321 Meeting W/Util in Rockville,Md Re Attenuation of Jets from high-energy Line Breaks.Meeting Notice,List of Attendees & Handouts on Jet Impingement Loadings Encl ML20155C7271988-09-30030 September 1988 Summary of 880921 Meeting W/Util in Rockville,Md Re Chemical Engineering Branch Review of Fsar.List of Attendees,Meeting Notice & Agenda Encl ML20155G2041988-09-30030 September 1988 Summary of 880317-18 Meeting W/Util in Rockville,Md Re Fire Protection Programon Program in Response to Open & Unresolved Items in Insp Rept 50-445/87-22.Util Attends to Submit Advanced Draft FSAR Changes by Early May 1988 ML20154L7101988-09-20020 September 1988 Summary of 880908 Meeting W/Util in Rockville,Md Re Changes to Emergency Plan Since Rev 8 Was Reviewed by Staff & Results of Review Documented in Safety Ser.Meeting Notice & List of Attendees Encl ML20154J8911988-09-19019 September 1988 Summary of 880907 Meeting W/Util in Rockville,Md Re Bounding Analysis for Stress Condition Pressurizer Surge. List of Attendees & Presentation Matl Encl.Proprietary Version of Presentation Slides Also Encl ML20154C1601988-09-0202 September 1988 Summary of 880830 Meeting W/Licensee Representatives at Util Site Re Operator Training Program & License Exam Results. W/List of Attendees,Agenda & Viewgraphs ML20153F0431988-08-31031 August 1988 Summary of 880818 Meeting W/Util & Westinghouse in Rockville,Md Re Application of leak-before-break Methodology to Pressurizer Surge Line.Meeting Notice,Agenda,List of Attendees & Slides Used in Presentation Encl ML20151P1841988-07-28028 July 1988 Summary of 880614 Meeting W/Util Re Radiation Protection Organization.Meeting Notice,Agenda,List of Attendees & Util Presentation Encl ML20206H5171988-07-26026 July 1988 Summary of Allegation Review Committee 880721 Meeting Held by Telephone Re Encl Listed Allegations ML20155F4811988-05-31031 May 1988 Summary of 880523-26 Audit of Util Corrective Action Program in Glen Rose,Tx.Audit Included Review of Util Reasons for Establishing HVAC Design Validation Effort & Review of Scope of QA Technical Audit Program ML20154G3471988-05-16016 May 1988 Summary of 880512 Meeting W/Util in Rockville,Md Re Design Change Involving Backup Meteorological Monitoring Tower at Plant.List of Attendees & Viewgraphs Encl ML20150D9191988-03-17017 March 1988 Summary of 880205 Meeting W/Util in Rockville,Md Re NRC Comments on Ebasco Svcs,Inc Jet Attenuation Calculation, CPE-SI-CA-0000-645 ML20149M0791988-02-18018 February 1988 Summary of 871112 Meeting W/Util in Bethesda,Md Re Jet Impingement Effects in Break Exclusion Region of Main Steam & Feedwater Piping at Plant.Meeting Notice & List of Attendees Encl ML20149H0141988-02-12012 February 1988 Summary of 871207-11 Audit Re Implementation of Procedures for Train C Conduit Supports Less than or Equal to 2 Inches. Lists of Persons Involved W/Audit & Documents Reviewed Encl ML20149D7401988-02-0101 February 1988 Summary of 871216 Meeting W/Util Re leak-before-break Piping Analysis & Amplified Response Spectra for Floors.List of Attendees & Presentation Slides on leak-before-break & Amplified Response Spectra Encl ML20236V9001987-11-25025 November 1987 Summary of 871028-30 Audit W/Util & S&W in Cherry Hill,Nj Re Implementation of Piping Design Criteria ML20236W2641987-11-25025 November 1987 Summary of 870908-10 Audit of as-built Field Verification Program for Conduit Support Trains a & B & Train C Greater than 2 Inches at Plant.List of Personnel Involved & Walkdown Packages Reviewed During Audit Encl ML20236L6241987-11-0505 November 1987 Summary of 870928-1001 Audit of Comanche Peak Response Team third-party Review of Cable Tray/Supports at Ofcs of Tenera in Berkeley,Ca.List of Persons Involved in Audit & Attending Exit Meeting Encl ML20236F1201987-10-20020 October 1987 Summary of 870914 Meeting W/Util & Ebasco Svcs,Inc in New York,Ny Re Resolutions to Generic Technical Issues Re Design of Conduit Supports ML20236F7621987-10-19019 October 1987 Summary of 870915 Meeting W/Util & Util Design Contractors in New York,Ny Re Resolutions to Generic Technical Issues on Structural Integrity of HVAC Design ML20236C3851987-10-16016 October 1987 Summary of 870922-24 Audit at Ofcs of S&W in Cherry Hill,Nj Re Implementation of Pipe Design Criteria.Attendance List Encl ML20236B1871987-10-0909 October 1987 Summary of 870826-27 Meetings W/Util & Contractors in New York,Ny Re Resolution of Generic Technical Issues Associated W/Cable Tray Hangers.Meeting Notice,List of Attendees & Presentation Matl Encl ML20235V1771987-10-0505 October 1987 Summary of 870902 Public Meeting W/Util & S&W in Cherry Hill,Nj Re Uresolved Large Bore Piping & Pipe Support Issues 1999-04-26
[Table view] |
Text
3-v0 G,Y~~ t p
3 ,M 4 [p aso UNITED STATES
' ~
of" n NUCLEAR REGULATORY COMMISSION W ASHINGTON, D. C. 20555
{ $
i
\ ..... pf October 2, 1987 Docket Nos. 50-445 and 50-446 i APPLICANT: Texas Utilities Electric Company (TV Electric)
FACILITY: Comanche Peak Steam Electric Station, Units 1 and 2
SUBJECT:
SUMMARY
OF MEETING ON AUGUST 25, 1987 - CPSES FSAR CHANGES PIPING DESIGN On August 25, 1987 the NRC staff and its consultants met with representatives of TV Electric (Applicant) and their contractors at the offices of Stone & Webster Engineering Corporation (SWEC) in Cherry Hill, New Jersey. The meeting notice and a list of meeting attendees are provided as Enclosures 1 and 2, respectively.
The purpose of the meeting was to discuss the staff technical review of Amendment 61 of the Comanche Peak Steam Electric Station (CPSES) Final Safety Analysis Report (FSAR) related to changes to the piping design criteria. The changes to the piping design criteria previously used by Gibbs & Hill, Inc.
reflected the alternative analytical methods used by SWEC in its piping requali-fication effort and were initially discussed in a meeting held in the NRC (Bethesda) offices on August 28, 1986.
The staff reviewed the technical acceptability of the FSAR changes and the use of specific ASME Code Cases and later Code provisions as permitted in paragraph NA-1140(f) of the ASME Boiler & Pressure Vessel Code,Section III. The staff review of the use of ASME Code Cases and later Code provisions focused primarily on the technical justifications provided in the applicant's report entitled,
" Documentation of ASME III NA-1140 Review for Piping and Supports," Revision 1, dated August 10, 1987 (Enclosure 3). This report documented the applicant's review performed in order to ensure that the use of design criteria in CPPP-7*
is in conformance with NA-1140(f) of the Code and, in particular, that all related Code requirements are met. The Code of Record for CPSES piping is the ASME Boiler and Pressure Vessel Code Section III, 1974 Edition, including Sunrner 1974 Addenda Subsections NC/ND. The Code of Record for CPSES pipe supports is the 1974 Edition including Winter 1974 Addenda Subsection NF.
The representatives from SWEC presented an overview of the piping design criteria changes which is provided in Enclosure 4 to this memorandum.
As a result of discussions with the applicant, the staff identified several unresolved items where additional information and further staff review is required as discussed below.
- CPPP-7, " Design Criteria for Pipe Stress and Pipe Supports," Revision 3, dated February 23, 1987.
8710300078 871002 PDR ADOCK 05000445 A PDR
.. . . . J
s
- 1. Flexibility and Stress Intensification Factors (1983 Edition-Winter 1984 Addenda Subparagraph "NC/ND-3673.2(b)")
The SWEC piping stress analysis used the later Code provision for stress intensification factors (SIF) for branch connections, butt welds, and socket welds. An independent review by S. E. Moore was documented in a paper entitled, "ASME Code Stress Intensification Factors for Comanche Peak Steam Electric Station Units 1 and 2." The staff has not yet completed its review of the S. E. Moore paper. Upon completion of that review, the staff will discuss the acceptability of the paper in a safety evaluation.
- 2. Overall Review of Related Code Requirements The staff will continue its review of related requirements affected by later Code provisions.
Upon completion of review in this area, the staff will proviae its conclusions in a safety evaluation.
- 3. In_tervening Elements in Relation to Jurisdictional Boundaries (1980 Edition Paragraph NF-1133)
This Code provision allowed non-support items in the component support load path when designed to other standards. The staff required additional information about where this Code provision was applied and how the Owner ensured that the intervening elements are adequately designed.
- 4. Minimum Required Hydrostatic Test Pressure (1974 Edition-Winter 1975 Addenoa Paragraph NC-6221)
The Winter 1975 Addendum revised the minimum post-installation hydro-static test pressure from 1.5 times to 1.25 times the design pressure.
The staff questioned how and where this later Code provision would be implemented.
- 5. Design Requirements for Welds on Linear Supports (1980 Edition-Winter 1982 Addenda Paragraph NF-3324.5)
The staff raised a question concerning design requirements for welds on plate-and-shell supports. SWEC stated that plate-and-shell supports'are not used in pipe support design. The staff will follow-up this item as part of its implementation review.
- 6. Lamellar Tearing (1977 Edition-Winter 1978 Addenda Paragraph XVII-2211, Paragraph NF-3321.1, Paragraph NF-3226) 1 I
This Code provision had been revised to reduce the potential for Lamellar tearing. The applicant controls the potential for lamellar tearing ,
through ultrasonic examinations in susceptible welds. The staff requested i three (3) examples of moment limiting components where UT had been per-formed and d M UT results.
i
t
- 7. Building Settlement Loads on Piping The FSAR Table 3.98-1B was revised to delete " single non-repeated anchor
. movements due to building settlement." The staff requested technical justification. for deleting this loading condition.
The applicant is in the process of responding to the above unresolved staff
. questions. The staff will conduct a follow-up public meeting with the applicant to discuss.their responses. The resolutions to these items will be addressed in a future audit report or safety evaluation.
l Original signed by :)
l David Terao Comanche Peak Project Division )
Office of Special Projects
Enclosures:
- 1. Meeting Notice
- 2. List of Meeting Attendees
- 3. Report entitled " Documentation of ASME III NA-1140 Review for Piping and Supports,"
Revision 1, dated August 10, 1987 ~
- 4. Meeting Agenda dated August 25, 1987 cc: See next page bec: .D. Landers, TES R. Hookway, TES '
G. Moy, TES Distribution:
'Upttet: File 4 NRC PDR LPDR OSP Reading File ]
CPPD Reading File l J. Keppler/J. Axelrad t
C. Grimes P. McKee J. Lyons R. Warnick D. Kelly A. Vietti-Cook M. Malloy
.CPPD-LA
'0GC-Bethesda F.'Miraglia E. Jordan J. Partlow
' ~ ~~~
i
'0FC :CPPD:0SP g :PM PPD:0 g..:.
___.......___..:c ....
- P P P 7:A/D:CPgD:0SP :
..: __ g ._______:____________..:...____...___
NAME :DTerao:cb :AVietti-C k :HM lloy :JLyoq : :
...... : __ ............:._____ ....___:..____________:_____.________:_.. _________ :...____...... j DATE :9/2787 :9/Jg/87 :9/>887 :9/f8/87 : :
I
F ,
3 ;
n W. G. Counsil Comanche Peak Steam Electric Station Texas Utilities Electric Company Units 1 and 2 cc:
Thomas G. Dignan, Jr. . Asst. Director for Inspec. Programs Ropes & Gray Comanche Peak Project Division 225 Franklin Street U.S. Nuclear Regulatory Commission Boston, Massachusetts 02110 P. O. Box 1029 ,
Granbury, Texas 76048 l Robert A. Wooldridge, Esq. Regional Administrator, Region IV Worsham, Forsythe, Sampels & V.S. Nuclear Regulatory Commission Wooldridge 611 Ryan Plaza Drive, Suite 1000 .,
2001 Bryan Tower, Suite 2500 Arlington, Texas 76011- !
Dallas, Texas 75201 Lanny A. Sinkin l Mr. Homer C. Schmidt Christic Institute
' Director of Nuclear Services 1324 North Capitol Street Texas Utilities Electric Company Washington, D.C. 20002 Skyway Tower 400 North Olive Street, L.B. 81 Ms. Billie Pirner Carde, Esq.
Dallas, Texas 75201 Government Accountability Project Midwest Office.
Mr.' Robert E. Ballard, Jr. 104 East Wisconsin Avenue Director of Projects Appleton, Wisconsin 54911 Gibbs and Hill, Inc.
11 Penn Plaza New York, New York 10001 David R. Pigott, Esq.
Orrick, Herrington & Sutcliffe 4 600 Montgomery Street )
Mr. R. S. Howard San Francisco, California 94111
. Westinghouse Electric Corporation P. O. Box 355 Anthony Z. Roisman, Esq. 1 Pittsburgh, Pennsylvania 15230 Suite 600 l 1401 New York Avenue, NW Renea Hicks, Esq. Washington, D.C. 20005 Assistant Attorney General Environmental Protection Division Robert Jablon P. O. Box 12548, Capitol Station Bonnie S. Blair Austin, Texas 78711 Spiegel & McDiarmid l 1350 New York Avenue, NW 1 Mrs. Juanita Ellis, Piv.sident Washington, D.C. 20005-4798 Citizens Association for Sound Energy 1426 , South Polk George A. Parker, Chairman Dallt,'s , Texas 75224 Public Utility Committee J Senior Citizens Alliance Of
, Ms. Nancy H. Williams Tarrant County, Inc.
- CYGhA Energy Services 6048 Wonder Drive 21'l N. California Blvd., Suite 390 Fort Worth, Texas 76133 f Wal,' nut Creek, CA94596
_j
+
~
)
,, W.'G Counsil Comanche Peak Electric- Station '{
Texas Utilities Electric Company Units 1 and 2 ;
j Cc:
Joseph F. Fulbright l Fulbright & Jaworski 1301 McKinney Street Houston, Texas 77010 i
Mr. Donald R. Woodlan Texas Utilities Electric Company Skyway Tower 400 North Olive Street, L.B. 81 i Dallas . Texas 75201 Mr. Jack Redding l c/o Bethesda Licensing j Texas Utilities Electric Company ;
I 3 Metro. Center, Suite 610 )
Bethesda, Maryland 20814 William A. Burchette, Esq.
Counsel for Tex-La Electric Cooperative i of Texas {
Heron, Burchette, Ruckert & Rothwell l Suite 700 l 1025 Thomas Jefferson Street, NW ,
j Washington, D.C. 20007 James M. McGaughy GDS Associates, Inc.
Suite 450 2525 Cumberland Parkway Atlanta, Georgia 30339 Administrative Judge Peter Bloch U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Elizabeth B. Johnson Administrative Judge Oak Ridge National Laboratory P. 0. Box X, Building 3500 :
Oak Ridge, Tennessee 37830 Dr. Kenneth A. McCollom 1107-West Knapp Stillwater, Oklahoma 74075 Dr. Walter H. Jordan Administrative Judge 881 West Outer Drive Oak Ridge, Tennessee 37830 1
1 J
ENCLOSURE 1
-# o,,
UNITED STATES
! n NUCLEAR REGULATORY COMMISSION
$ W ASHINGTON, D. C. 20555 h
/ August 17, 1987
%, . . . . . f Docket Nos.: 50-445/446 MEMORANDUM FOR: Christopher I. Grimes, Director Comanche Peak Project Division Office of Special Projects THRU: Hans E. Schierling, Assistant O' rector for Projects j i ComanchePeakProjectDivisionj9 Office of Special Projects FROM: Annette Vietti-Cook, Project Manager Comanche Peak Project Division Office of Special Projects
SUBJECT:
FORTHCOMING MEETING WITH TV ELECTRIC AND STONE & WEBSTER Date & Tine: Tuesday, August 25, 1987 9:00 a.m.
Location: Stone & Webster Engineering Corporation Cherry Hill Operations Center 3 Executive Campus Cherry Hill, New Jersey
Purpose:
To discuss the design criteria in support of Final Safety Analysis Report Amendment 61 changes for large bore piping
Participants:
NRC Applicant E Terao J. Finneran, et al.
Consultants (Teledyne) xm f r. C e K ')
Annette Vietti-Cook, Project Manager Comanche Peak Project Division Office of Special Projects j i
Hembers of the public planning to attend should contact:
A. Vietti-Cook or M. Malloy (301)492-4555 (301)492-7624 cc: See next page ze ,
._ J
.. j
- ENCLOSURE 2-CPSES FSAR CHANGES RELATED TO PIPING' DESIGN CRITERIA MEETING ON AUGUST 25, 1987 ;
List of Attendees 4 TV Electric B. 5. Dacko S. W. Harrison J. W. Muffet D. M. Rencher SWEC D . Ali j D. M. Bonner 1 L. L. Dietrich j E. Evans M. I. Gilman D. M. Hernon R. Klause E. F. Lewis J. H. MacKinnon F. Ogden E. J. Siskin W. Wang ..
Tenera
-E. A. Was TES(NRCConsultant)
C Hookway ,
i D. F. Landers G. Moy- ;
NRC {
E Terao 1
1 i
l 4
k i
._