1 4
4 L
. TENNESSEE VALLEY AUTHORITY CH ATTANOOGA, TENNESSEE 374o1 SN 157B Lookout Place
- 00T 261. 98T..
U.S. Nuclear Regulatory Comission ATTN: Document' Control-Desk ^
Washington, D.C.
'20555 l
Gentlemen:
i In the Matter'of the
)'
' Docket: Nos. 50-327.
Tennessee Valley Authority'
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) UNITS 1 AND 2 --ENGINEERING CHANGE NOTICE (ECN)
CLOSEOUT AND FINAL SAFETY ANALYSIS REPORT-(FSAR) UPDATES - SUPPLEMENTAL
- RESPONSE Enclosed.is a supplemental' response.that provides additional information about FSAR corrective actions. This supplements my. response to Violation 50-327. -328/87-42: in a letter from me dated September 14, 1987. This-letter also revises the' commitment made in the response provided in a letter to J. Nelson Grace from J. A. Domer dated February 3, 1987.
To the best of my knowledge, I. declare the statements contained herein are complete and true.
Very truly;yours, i
TENNESSEE VAL EY AUTHORITY l
R. Gridley, rector Nuclear Licensing'and Regulatory Affairs
]
Enclosure
')
cc: See page 2' j
/
8710300054 871026 I
PDR ADOCK 05000329 l
t
-O PDR f
An Equal Opportunity Employer
};
c1 '
U.S. Nuclear Regulatory Commission
)
cc (Enclosure):
Mr. G, G. Zech, Assistant. Director for Inspection' Programs Office of Special Projects j
U.S.. Nuclear Regulatory Commission I
101 Marietta Street, NW, Suite 2900 Atlanta, Georgia.30323
' Mr'. J.:A.1Zwolinski, Assistant Director for Projects Division of TVA Projects l
Office of Special Projects U.S. Nuclear' Regulatory Commission 4350 Fast-West Highway EWW'322
.Bethesda, Maryland 20814 Sequoyah Resident Inspector Sequoyah Nuclear Plant-
.2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 l
l l
i
7_-_-_
. ),(
ENCLOSURE SUPPLEMENTAL INFORMATION REGARDING FSAR CORRECTIVE ACTIONS-TVA's original response provided. schedule guidelines for commitments in development of the new FSAR Update Program. The schedule guidelines have been revised as follows:
PHASE 2' MILESTONES SCHEDULE GUIDELINE Preparation of SQN Site Procedure Completed'
. Approval'of Standard for ONP 12/15/87
-by Manager of ONP Preparation of related Divisional 12/15/87
- Procedures
- The revised completion date for the new FSAR Progrrm is December 15, 1987.