Text
_. _ -
J e.
l Alabama Power Company
i
~~
i' 600 North 18th Street.
l
' Poet office Box 2641.'
i :
Olrmingham, Alabama 35291-0400.
1 Telephone 205 250-1835 -
Alabama Power-
/ nio V ce President the southem electrc system I
June 24, 1987 i
Docket No.:50-348 Docket No. 50-364 l
i Chief, Emergency Preparedness Section U.: S. Nuclear Regulatory Commission Region,II j
101 Marietta Street, N. W..
' Suite 3000 Atlanta, Georgia 30}03 l-
Dear' Sir:
l Provided herewith is a description of the scope of the Farley
)
1 Nuclear Plant annual emergency preparedness exercise and of the s
objectives to be fulfilled.. This information is provided as requested
.in Mr. Lewis's letter of October 11, 1984.
If you have any questions, please advise.
g f
Yoursver)(trul',
l R. P. Mcdonald RPM /FMJ:emb Enclosures xc :. Mr. W. R. Lilly Mr. A. V. Godwin Mr. D. Moffet Mr. J. Hardeman File A29.13.3.ll j
i l-L-
l s
8710300037 870624 PDR ADOCK 05000348; p
\\
t Is3r 7
1987 FARLEY NUCLEAR PIANP EMERGENCY EXERCISE SEPTEMBER 10, 1987 I.
Participating Organizations.
Full Participation: Alabama Power Company, the State of Alabama, and Houston County.
Limited
- Participation: The State of Georgia and Early County.
II.
Purpose A.
To meet the requirements of 10CFR50, Appendix E and I
NUREG-0654/ FEMA-REP-1, Rev. 1.
i B.
To conduct a small-scale exercise that will include the mobili-zation of Alabama Power Company personnel and adequate resources to verify the capability of Alabama Power Company to respond to an accident scenario requiring response.
]
III. Objectives l
A.
On-site Objectives (Alabama Power Company) k 1.
Demonstrate that control room staff can assess the event, I
classify the event, take corrective measures to control the
{
event and activate emergency response procedures.
1 2.
Demonstrate that plant staff can activate and staff the f
Technical Support Center (TSC) and perform accident response 4
activities including:
a.
Dose Assessment b.
Off-site notification and protective action recommendations c.
Post Accident Sampling Activities q
d.
Personnel Accountability for all personnel on-site
.l e.
Radiation Monitoring Team (RMT) Dispatch and Control i
f.
Reclassification of emergency status 3.
Demonstrate the capability to prepare the Emergency Operations Facility (EOF) in a timely fashion for use by the corporate staff upon arrival.**
4.
Demonstrate the capability to turn over EOF functions to the EOF staff when the EOF is activated and staffed.
1 5.
Demonstrate the ability to augment EOF staff with non-essential plant personnel.
]
6.
Demonstrate the adequacy of the plant's communication system j
including: Communication links to Corporate Emergency Operations Center (EOC); News Media Center (NMC);
1 l
communication links to state and local authorities.
l l
2
- Communications activities only
- To be tested in a separate drill the day before the exercise. This will allow pre-staging of these activities on the day of the exercise.
i l
i
,, m.;
.7.. Demonstrate the health physics capability to obtain and process
. post-accident liquid samples and to. respond to elevated direct-radiation measurements in the plant.
B.
Off-Site Objectives (Alabama Power Company)-
1.
Demonstrate that corporate staff can be activated:in'a timely.
fashion and dispatched to FNP.*-
I 2.
Demonstrate that Corporate. Headquarters Emergency Operations
' Center (EOC) staff can provide. initial support for:
q a.
EOF activation
- i b.
Logistics
.j c.
Support organization notification d
d.
Briefing of company management
]
e.
News release preparation 1
3.
Demonstrate that EOF staff can:
a.
Assume the dose assessment function and J
the RMT direction and control function-1 from the TSC staff.
}
1
- b. ' Assume the logistics, manpower and engineering function from the EOC.
c.
Prepare and coordinate' news releases and I
activate the NMC.*
q 4.
Demonstrate that.the Public Information Organization can respond to media and public inquiries, establish a rumor control center, and issue and coordinate news releases.
C.
Off-Site Plume Exposure Pathway EPZ' Objectives (State of Alabama-and. Houston County)
- 1.. Demonstrate that decisions can be communicated with regard to protective measures for the plume exposure pathway EPZ.
2.
Demonstratethatadequatecommunicationscanbemaintalie.d between the Houston County EOC and field units.
3.
Demonstrate that the State of Alabama can activate emergdn'cy worker assembly points, dispatch radiation monitoring teams in a timely manner, provide assessment of a simulated airborne release and ccumunicate their assessment to the Houston County EOC.
I !
4 4.
Demonstrate that the State of Alabama radiation control staff can assess the accident and make appropriate recommendations-to the State's decision makers.
5.
Demonstrate the ability to coordinte a precautionary evacua-tion ** of a school within the 10 mile EPZ.
To be tested in a separate drill the day before the exercise. This will allow pre-staging of these activities on the day of the exercise.
- The evacuation will be terminated just prior to actual transportation /of j
students.
l
, c.2-
.. s_; ;.
.6;, Demonstrate the. ability to' alert river traffic by..
O coordination with the Alabama Conservation Department.
.D..-Joint Objectives (Alabama Power Company, State of Alabama and.
Houston County)'
~
~
'l. : Demonstrate';that all^ parties can coordinate news releases
.and conduct a joint; news conference.-
2.. - Demonstrate. that adequate technical information can be exchanged'among. involved agencies.
3
.IV.
Exercise Limits
'Ihe exercise' will begin prior to 8 A.M. CDST and conclude by 4:00 P.M.
L
.CDST.
Following proper coordination, the alert and notification system will be. activated by-the State of Alabama.
(
c
/
.E-4A f
_R.____.._._
)
l' l(
)
i
\\ [
/>
s_
l
\\
i h
s,
/
i s
)
,y
)egtomber 10, 1987
)
q j
]J,i t
y.yJMINARY SCENARIO
,C h N F I D E N T I A L -
s
\\
~Jr 4
i.
f The information in this document is to be revealed on a need-to-know basis a
only.
g
'}
TI TIp1987EmergencyExercise$rillbeaIonsofcoolanbaccidtnt(LOCA). The
.sinulated Unit I RCS leak will develop st approximately 7:00 A.M.
The r.\\.
l leakage will ramp to 70 gpm by 8:00 A. E and will be cold-leg non-isolable i
T
.\\s,$ESJURE BOUNDARY LEAKAGE. An Alert is expected to be declared between g
7:6 tA.M. and 8:15 A.M.
At 8:45 A.M. a double-ended break will occur in tho hold-leg resulting in massive RCS leakage, 'A Site Area Emergency is expected to be declared between 8:45 A.M. and 9515 A.M.
At approxitattbf 9:45 A.y., a release from CTMT will begin resulting in a releue.to t)e~
envirom nt. A General Emergency may be conservatively declarciby t'11s tink J.t' the discretion of the Emergency Director. An exercisC controller wi%'.a.llow the process of. troubleshooting and repair of the CTMT re(ease s,
na h%o exercise the radiation monitoring teams (R"?rs).tt will stop progresh just short Mme t This will E.llow l
the RMPs,approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to verify expected' tn-site and off-site i
rdoses.
g<
a Th\\ySC wil1 be fully staffed aipradiation monitoring teams will be 3
dtspatchea,to perform environmerital acnitoring. The plant will cooldown r
during safety injection.
1 i
/
The EOF will be activat$d and will continue the efforts to track the plume and provide envirpyc6f;al sampling to determine the extent of possible on-site end off sitefcontamination. The EOF staff will be s
, Jurther challe:iged with licerising, public informatsn, engineering and' j'
j logistics supp3rt activities, i ;
The Nen415dia Center will be activated and staffed by representative}es n
from APCo, the State of Alabama and Houston County. Media and public V$
interest.ri,11 he simulated an4 news releases will be prepared and released.
\\
The dri k will terminate 5 ice thtI' radiation monitoring teams have tracked the plume ani the EOF has been staffed and is performing EOF activities.
s
, Term mation will be coordinated with the State of Alabama if occuring prior f:p h.00 P.M. Central. i l
i
,i d'
N \\
'h i
1
\\
1 3
\\f
\\
't i
B-d
\\
s
\\
s U__.____
L