Forwards Description of Scope of Plant Annual Emergency Preparedness Exercise & Objectives to Be Fulfilled,Per Lewis 841011 Request
ML20236E856
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/24/1987
From: Mcdonald R
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NT-87-0284, NT-87-284, NUDOCS 8710300037
Download: ML20236E856 (5)


Text

_. _ -

J e.

l Alabama Power Company

i

~~

i' 600 North 18th Street.

l

' Poet office Box 2641.'

i :

Olrmingham, Alabama 35291-0400.

1 Telephone 205 250-1835 -

Alabama Power-

/ nio V ce President the southem electrc system I

June 24, 1987 i

Docket No.:50-348 Docket No. 50-364 l

i Chief, Emergency Preparedness Section U.: S. Nuclear Regulatory Commission Region,II j

101 Marietta Street, N. W..

' Suite 3000 Atlanta, Georgia 30}03 l-

Dear' Sir:

l Provided herewith is a description of the scope of the Farley

)

1 Nuclear Plant annual emergency preparedness exercise and of the s

objectives to be fulfilled.. This information is provided as requested

.in Mr. Lewis's letter of October 11, 1984.

If you have any questions, please advise.

g f

Yoursver)(trul',

l R. P. Mcdonald RPM /FMJ:emb Enclosures xc :. Mr. W. R. Lilly Mr. A. V. Godwin Mr. D. Moffet Mr. J. Hardeman File A29.13.3.ll j

i l-L-

l s

8710300037 870624 PDR ADOCK 05000348; p

PDR

\\

t Is3r 7

1987 FARLEY NUCLEAR PIANP EMERGENCY EXERCISE SEPTEMBER 10, 1987 I.

Participating Organizations.

Full Participation: Alabama Power Company, the State of Alabama, and Houston County.

Limited

  • Participation: The State of Georgia and Early County.

II.

Purpose A.

To meet the requirements of 10CFR50, Appendix E and I

NUREG-0654/ FEMA-REP-1, Rev. 1.

i B.

To conduct a small-scale exercise that will include the mobili-zation of Alabama Power Company personnel and adequate resources to verify the capability of Alabama Power Company to respond to an accident scenario requiring response.

]

III. Objectives l

A.

On-site Objectives (Alabama Power Company) k 1.

Demonstrate that control room staff can assess the event, I

classify the event, take corrective measures to control the

{

event and activate emergency response procedures.

1 2.

Demonstrate that plant staff can activate and staff the f

Technical Support Center (TSC) and perform accident response 4

activities including:

a.

Dose Assessment b.

Off-site notification and protective action recommendations c.

Post Accident Sampling Activities q

d.

Personnel Accountability for all personnel on-site

.l e.

Radiation Monitoring Team (RMT) Dispatch and Control i

f.

Reclassification of emergency status 3.

Demonstrate the capability to prepare the Emergency Operations Facility (EOF) in a timely fashion for use by the corporate staff upon arrival.**

4.

Demonstrate the capability to turn over EOF functions to the EOF staff when the EOF is activated and staffed.

1 5.

Demonstrate the ability to augment EOF staff with non-essential plant personnel.

]

6.

Demonstrate the adequacy of the plant's communication system j

including: Communication links to Corporate Emergency Operations Center (EOC); News Media Center (NMC);

1 l

communication links to state and local authorities.

l l

2

  • Communications activities only
    • To be tested in a separate drill the day before the exercise. This will allow pre-staging of these activities on the day of the exercise.

i l

i

,, m.;

.7.. Demonstrate the health physics capability to obtain and process

. post-accident liquid samples and to. respond to elevated direct-radiation measurements in the plant.

B.

Off-Site Objectives (Alabama Power Company)-

1.

Demonstrate that corporate staff can be activated:in'a timely.

fashion and dispatched to FNP.*-

I 2.

Demonstrate that Corporate. Headquarters Emergency Operations

' Center (EOC) staff can provide. initial support for:

q a.

EOF activation

  • i b.

Logistics

.j c.

Support organization notification d

d.

Briefing of company management

]

e.

News release preparation 1

3.

Demonstrate that EOF staff can:

a.

Assume the dose assessment function and J

the RMT direction and control function-1 from the TSC staff.

}

1

b. ' Assume the logistics, manpower and engineering function from the EOC.

c.

Prepare and coordinate' news releases and I

activate the NMC.*

q 4.

Demonstrate that.the Public Information Organization can respond to media and public inquiries, establish a rumor control center, and issue and coordinate news releases.

C.

Off-Site Plume Exposure Pathway EPZ' Objectives (State of Alabama-and. Houston County)

1.. Demonstrate that decisions can be communicated with regard to protective measures for the plume exposure pathway EPZ.

2.

Demonstratethatadequatecommunicationscanbemaintalie.d between the Houston County EOC and field units.

3.

Demonstrate that the State of Alabama can activate emergdn'cy worker assembly points, dispatch radiation monitoring teams in a timely manner, provide assessment of a simulated airborne release and ccumunicate their assessment to the Houston County EOC.

I !

4 4.

Demonstrate that the State of Alabama radiation control staff can assess the accident and make appropriate recommendations-to the State's decision makers.

5.

Demonstrate the ability to coordinte a precautionary evacua-tion ** of a school within the 10 mile EPZ.

To be tested in a separate drill the day before the exercise. This will allow pre-staging of these activities on the day of the exercise.

    • The evacuation will be terminated just prior to actual transportation /of j

students.

l

, c.2-

.. s_; ;.

.6;, Demonstrate the. ability to' alert river traffic by..

O coordination with the Alabama Conservation Department.

.D..-Joint Objectives (Alabama Power Company, State of Alabama and.

Houston County)'

~

~

'l. : Demonstrate';that all^ parties can coordinate news releases

.and conduct a joint; news conference.-

2.. - Demonstrate. that adequate technical information can be exchanged'among. involved agencies.

3

.IV.

Exercise Limits

'Ihe exercise' will begin prior to 8 A.M. CDST and conclude by 4:00 P.M.

L

.CDST.

Following proper coordination, the alert and notification system will be. activated by-the State of Alabama.

(

c

/

.E-4A f

_R.____.._._

)

l' l(

)

i

\\ [

/>

s_

l

\\

i h

s,

/

i s

)

,y

)egtomber 10, 1987

)

q j

]J,i t

y.yJMINARY SCENARIO

,C h N F I D E N T I A L -

s

\\

~Jr 4

i.

f The information in this document is to be revealed on a need-to-know basis a

only.

g

'}

TI TIp1987EmergencyExercise$rillbeaIonsofcoolanbaccidtnt(LOCA). The

.sinulated Unit I RCS leak will develop st approximately 7:00 A.M.

The r.\\.

l leakage will ramp to 70 gpm by 8:00 A. E and will be cold-leg non-isolable i

T

.\\s,$ESJURE BOUNDARY LEAKAGE. An Alert is expected to be declared between g

7:6 tA.M. and 8:15 A.M.

At 8:45 A.M. a double-ended break will occur in tho hold-leg resulting in massive RCS leakage, 'A Site Area Emergency is expected to be declared between 8:45 A.M. and 9515 A.M.

At approxitattbf 9:45 A.y., a release from CTMT will begin resulting in a releue.to t)e~

envirom nt. A General Emergency may be conservatively declarciby t'11s tink J.t' the discretion of the Emergency Director. An exercisC controller wi%'.a.llow the process of. troubleshooting and repair of the CTMT re(ease s,

na h%o exercise the radiation monitoring teams (R"?rs).tt will stop progresh just short Mme t This will E.llow l

the RMPs,approximately 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> to verify expected' tn-site and off-site i

rdoses.

g<

a Th\\ySC wil1 be fully staffed aipradiation monitoring teams will be 3

dtspatchea,to perform environmerital acnitoring. The plant will cooldown r

during safety injection.

1 i

/

The EOF will be activat$d and will continue the efforts to track the plume and provide envirpyc6f;al sampling to determine the extent of possible on-site end off sitefcontamination. The EOF staff will be s

, Jurther challe:iged with licerising, public informatsn, engineering and' j'

j logistics supp3rt activities, i ;

The Nen415dia Center will be activated and staffed by representative}es n

from APCo, the State of Alabama and Houston County. Media and public V$

interest.ri,11 he simulated an4 news releases will be prepared and released.

\\

The dri k will terminate 5 ice thtI' radiation monitoring teams have tracked the plume ani the EOF has been staffed and is performing EOF activities.

s

, Term mation will be coordinated with the State of Alabama if occuring prior f:p h.00 P.M. Central. i l

i

,i d'

N \\

'h i

1

\\

1 3

\\f

\\

't i

B-d

\\

s

\\

s U__.____

L