June 5, 1998 MEMORANDUM TO:
Thomas T. Martin, Chairman Committee to Review Generic Requirements (original signed by Brian W. Sheron for:]
FROM:
Frank J. Miraglia, Jr., Deputy Director Office of Nuclear Reactor Regulation
SUBJECT:
WITHDRAWAL OF REQUEST FOR CRGR TO REVIEW THE STAFF'S SAFETY EVALUATIONS FOR THE BWR VESSEL AND INTERNALS PROJECT SUBMiTTALS Subsequent to the discussions held by you with Jack R. Strosnider, Acting Deputy Director of the Division of Engineering, the Office of Nuclear Reactor Regulation (NRR) is withdrawing its request to have the Committee to Review Generic Requirements (CRGR) waive review of the staff's safety evaluation (SEs) for the Electric Power Research Institute (EPRI) proprietary guidance reports that have been submitted by the BWR Vessel and Internals Project (BWRVIP).
Specifically, these reviews are of the BWRVIP-03,-14, and -18 reports.
The subject SEs are not complete, in as they contain open issues which require further review before a final SE can be issued. As such, CRGR review at this time is not required. When the open issues have been resolved, the staff will provide the CRGR with the final SEs for review, if required.
CONTACT:
C. E. Carpenter, DE:NRR 415-2169 Distribution:
SJCollins EMCB R/F
! File Center;if PUBLIC DOCUMENT NAME: G:\\BWRVIP\\CRGR-MEM.A
- see previous concurrence INDIC ATE IN BOX: *C"= COPY, "N"nNO COPY OFFICE LPM:EMCB SLS:EMCB SC:EMCB (A)BC:EMCB NAME CECarpenter* A RAHermann*
KRWichman*
EJSullivan*
DATE 06/04/98 06/04/98 06/04/98 06/ /98
.m m
mm b
OFFICE (A)DD:DE (A)D:DE
( AC RR D:1 R d NAME JRStrosnider*
GClainas*
BWSd n
FJM lia DATE 06/04/98 06/04/98 06/ 5 /98 06/ J/98 OFFICIAL RECORD COP' f
'a lo,
98M10 S C Wif 6H@ @ O N gO kN ~q cgW 9006100478 990605 PDR REVQP ERONUPRC i
,\\O,
r MEMORANDUM TO:
Thomas T. Martin, Chairman Committee to Review Generic Requirements FROM:
Frank J. Miraglia, Jr., Deputy Director Office of Nuclear Reactor Regulation
SUBJECT:
WITHDAWAL OF REQUEST FOR CRGR TO REVIEW THE STAFF'S SAFETY EVALUATIONS FOR THE BWR VESSEL AND INTERNALS PROJECT SUBMITTALS Subsequent to the discussions held by you with Jack R. Strosnider, Acting Deputy Director of the Division of Engineering, the Office of Nuclear Reactor Regulation (NRR)is withdrawing its request to have the Committee to Review Generic Requirements (CRGR) waive review of the staff's safety evaluation (SEs) for the Electric Power Research Institute (EPRI) proprietary guidance reports that have been submitted by the BWR Vessel and Internals Project (BWRVIP).
Specifically, these reviews are of the BWRVIP-03, -14, and -18 reports.
The subject SEs are not complete, in as they contain open issues which require further review before a final SE can be issued. As such, CRGR review at this time is not required. When the open issues have been resolved, the staff will provide the CRGR with the final SEs for review, if required.
1 CONTACT:
C. E. Carpenter, DE:NRR 415 2169 I
Distribution:
SJCollins EMCB R/F File Center PUBLIC DOCUMENT NAME: G:\\BWRVIP\\CRGR-MEM.A 4N IND6CATE IN BOX:"C"= COPY W/O ATTACHMENT / ENCLOSURE "E"= COPY W/ATT$NCL,"N"sNO COPY >14C OFFICE LPM MCS SLS:EMC9 h
SC;E Of)
(A)BC:EMCB NAME r
RAHerman n
EJSullivan k umu uma immi umm OFFICE (A)DD:DE (A)D:DE (A)ADT:NRR DD:NRR NAME JRStrosnider GClaina BWSheron FJMiraglia DATE
/ O /98
/98
/
/98
/
/98 OFFICIAL RECORD COPY gi
- u\\
f
- u9 p
t, UNITED STATES y
}
NUCLEAR REC!ULATORY COMMISSION
/
t WASHINGTON. D.C. 30086-4001 June 5, 1998 MEMORANDUM TO: Thomas T. Martin, Chairman Committee to Review Generic Requirements FROM:
. Miraglia, Jr., Deputy Director ice of Nuclear Reactor Regulation
SUBJECT:
THDRAWAL OF REQUEST FOR CRGR TO REVIEW THE STAFF'S SAFETY EVALUATIONS FOR THE BWR VESSEL AND INTERNALS PROJECT SUBMITTALS I
Subsequent to the discussions held by you with Jack R. Strosnider, Acting Deputy Director of the Division of Engineering, the Office of Nuclear Reactor Regulation (NRR) is withdrawing its request to have the Committee to Review Generic Requirements (CRGR) waive review of the staff's safety evaluation (SEs) for the Electric Power Research Institute (EPRI) proprietary guidance reports that have been submitted by the BWR Vessel and intemals Project (BWRVIP).
Specifically, these reviews are of the BWRVIP-03,-14, and -18 reports.
The subject SEs are not complete, as they contain open issues which require further review before a final SE can be issued. As such, CRGR review at this time is not required. When the open issues have been resolved, the staff will provide the CRGR with the final SEs for review, if required.
CONTACT: