Advises That Engineering Review & Actions to Prevent Recurrence of Violations Noted in Insp Repts 50-424/86-26, 50-425/86-26,50-424/87-11 & 87-425/87-07 Completed Per 861031 & 870331 Commitments
ML20236D510
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/23/1987
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
GN-1389, NUDOCS 8707300493
Download: ML20236D510 (1)


Text

. _ _ _ _

wawon comv Pott OMce Box 28J NjnMt; ora. Georg a 3093?

7eacho."a 404 554 93W F, 33 404 724 6114. E vt h k

L Georgia Power

. P. D. Ric.

Oce Pres,Jent -

5/pg110 Frpp '

July 23, 1987 Unite'd States Nuclear Regulatory Commission Document Control Desk File:

X78G10 Washington, D. C.

20555 Log:

GN-1389

Reference:

Vogtle Electric Generating Plant - Units 1 & 2 USNRC Inspection Reports 50-424/86-59, 50-425/86-26 and 50-424/87-11, 50-425/87-07; GPC letters GN-1158 dated 10/31/86 and GN-1358 dated 3/31/87 In the correspondence referenced above, Georgia Power Company describtd corrective actions and actions to prevent recurrence relative to discrepancies identified during USNRC. inspections between some FSAR commitments and as-built conditions at the.Vogtle Electric Generating Plant.

These actions were also discussed with cognizant USNRC Region II personnel in a telephone conversation of July 14, 1987.

The engineering review to ensure consistency between the implemerited design and that described in the VEGP FSAR was completed in December 1986.

No discrepancies of safety significance were identified and the discrepancies that were found were corrected in FSAR amendments prior to Unit 1 fuel load.

Actions to prevent recurrence, including retraining responsible engineering personnel and issuance of a memorandum to remind project engineering personnel of the importance of following established design change control procedures, and of timely incorporation of changes into the FSAR when required, were completed as committed in the referenced responses.

This correspondence contains no proprietary information and may be placed in the USNRC Public Document i

Room.

h O

P. D. Rice CWH/PDR/wkl xc:

USNRC - Region II Suite 2900 101 Marietta Street, NW Atlanta, Georgia 30323

[l H. G. Baker D. R. Altman L. T. Gucwa J. P. O'Reilly J. A. Bailey C. W. Hayes

, j R. E. Conwhy G. Bockhold R. W. McManus R. H. Pinson C. E. Belflower Sr. Resident (NRC)

E. D. Groover J. F. D'Amico C. C. Garrett (OPC)

R. M. Bellamy D. Geig (GANE)

J. E. Joiner (TSLA)