Forwards Suppl Info Re Tech Spec Change 87-02,including Info on Operator Action & Procedural Changes That Will Ensure Operator Action in Response to Downscale Failure of Steam Generator Blowdown Radiation Monitor,Per Kim Request
ML20236D496
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 07/27/1987
From: Gridley R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8707300486
Download: ML20236D496 (4)


Text

t,'

.. ; f t 4

r

~

m 1

iiL i

+

  1. 1 g

3

)t

.r i

,,. j,.

(di

- n JW' l

TENNESSEE VALLEYi AUTHORITY.

tp

. 2

. CH ATTANOOGA, TENNESSEE 37401 r

4

,_s.

SN-157B-Lookout, Place' C..

LJUL 271987 7

5 lU.S.lNuclese Re'gulatcry Commission-s ATTN:'LDocument Control Desk iWashington,LD.C. -20555 Gentlemen:

JIn the. Matter of

)

Docket Nos. 50-327' t

a U.{

Tennessee Valley Authority;

)

~50-328',

/

SEQUOYAH NUCLEAR PLANT - TECHNICAL SPECIFICATION CHANGE 87-02

References:

' 1'.

LTVA letter.to NRC dated April 14,.1987,."Sequoyah Nuclear Plant'(SQN) - Technical Specification Change 87,

L'

' Functional-Testing of. Radiation Monitors in Steam-ILi!-

~ Generator: Blowdown and Condensate Domineralizer Lines"

.2.

TVAlettertoNRC~ dated' July 8,'1987 This,information regarding' technical specification 'hange 87-02 is'provided:in c

accordance with'.a request f rom Sang Kim durine, a July 13, 1987Ltelephone; conference call. _provides.information on operator. action'and procedural; changes'that will...ensu're operator action in response:to a dc,wnscale failure of'.the steam generator blowdown rLdiation monitor.

contains the commitments identified in enclosure 1.

If:you have any questions, please telephone M.=R.

Harding at (615):870-6422.

Very truly yours,

- TENNESSEE VALLEY AUTHORITY R. G idley, rector Nuclear Safe y and Licensing Enclosures 3..

cc: see page 2 8707300486 a7072f7

~

PDR ADDCK 05000327 P

PDR Y

\\\\

An Equal Opportunity Empioyer

'-' 'S

~1..

r

L au t

i p U.S. Nuclear Regulatory Commission

.JUL 271987 i

seciEnclosures):

Mr. G.: G. Zech. Assistant' Director (for Inspection Programs office.of Special Projects U.S. Nuclear Regulatory. Commission 101-Marietta' Street, NW,' Suite 2900 1

Atlanta',. Georgia ' 303231 (Mr.

J..A.

Zwolinski,' Assistant Director for Prejects Diviwlon of TVA Projects.

Offica of Speciall Projects -

U.S. Nuclear Regulatory Commission 4350 Bast, West Highway EWW 322.

Jethesda, Maryland 20814-Sequoyah Residen't Inspector-Sequoyah Nuclear Plant i'

2600~Igou Ferry Road Soddy Daisy, Tennessee 37379 l

l i

3

)

1 i

, i- -

i

! :' - ). l i.

'i_.

t C

s,i'

t ENCLOSURE 1 SUPPLEMENTAL INFORMATION REGARDING TVA-SQN-TS-87-02 This enclosure provides informat8 on regarding operator action when a downscale failure of an effluent radiation monitor occurs in steam generator blowdown effluent with the minimum channels operable as required by the technical i

specifica' ions.

l Technical specification 3.3.3.9 requires one minimum channel operable for I

steam generator blowdown effluent radiation monitors before initiating a release. As stated in action 31 of table 3.3-12 with the number of channels operable, less than required effluent releases via this pathway may continue provided grab samples are analyzed for gross radioactivity gamma.

Therefore, during a release to the environment with the minimum required channels operable (one) when a downscale failure occurs, the effluent monitor would be I

declared inoperable and the release terminated per technical specification 3.3.3.9.

After resampling, the release could continue provided the limiting conditions for operation are met.

System operating Instruction (SOI-55),

" Annunciator Response," and Surveillance Instruction (SI-401), " Steam Generator Blowdown Continuous Release," will be revised by July 31, 1987, to ensure that, duting a release of steam generator blowdown effluent to the environment and a downscale failure of a radiation monitor with the minimum channels operable (i.e. one radiation monitor), the release will be immediately terminated and resampled befora continuing the release via this pathway.

l l

l 9

l l

ve l l

EECLOSURE 2 LIST OF C0!!MITHENTS j

1.

Revise SOI-55 by July 31, 1987, to state requirements outlined in 1

enclosure 1.

I 2.

Revise SI-401 by July 31, 1987, to state requirements outlined in enclosure 1 i