ML20236D222
| ML20236D222 | |
| Person / Time | |
|---|---|
| Issue date: | 10/23/1987 |
| From: | Vissing G Office of Nuclear Reactor Regulation |
| To: | Murley T, Sniezek J, Starostecki R NRC |
| References | |
| NUDOCS 8710280075 | |
| Download: ML20236D222 (3) | |
Text
- - _ _ _ - _ - _ _ _ _ _ - _ _ _ - - _ _ - _ _ - _ -
..N po ntoog'o eq UNITED STATES 8"
N NUCLEAR REGULATORY COMMISSION
[
. WASHINGTON, D. C. 20555
,j
)
/
October 23, 1987 q
MEMORANDUM FOR:
T. Murley J. Partlow J. Sniezek F. Congel 1
F. Miraglia J. Roe R. Starostecki S. Black S. Varga B. Boger D. Crutchfield* G. Lainas
(
L. Shao C. Rossi G. Holahan S. Richardson A. Tha.dani W. Lanning R. Cooper THRU:
Lester S. Rubenstein, Director Standardization and Non-Power Reactor Project Directorate Divisi. n of Reactor Projects III, IV, V and Special Projects FROM:
Guy S. Vissing, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects III, IV, V and Special Projects
SUBJECT:
DAILY HIGHL!GHT CONCERNING EXECUTIVE MEETING WITH COMBUSTION ENGINEERING ON THE SYSTEM 80+ DESIGN On October 29, 1987, between 1:00 and 2:00 PM in Room P-422, Combustion Engineering will present an executive overview of the CE System 80+ design.
The System 80+ design is a.PWR consisting of a NSSS, containment, Emergency feedwater system,.and control room.
The review of the System 80+ design has recently started for final design apnroval (FDA) in December 1990 and Design Certification by rulemaking in September 1991. Those scheduled for attendance are:
NRC Combustion Engineering T. Murley Ed. Scherer L. Shao George Davis R. Starostecki Michael Green D. Crutchfield L. Rubenstein A. Thadani J. Richardson G. Vissing fj, 8710200075 871023
/
PDR TOPRP EMVC-E
/
s a C
PDR g
L-
rne-
-a r
j -.
t
~
(
k d[,],]'-
\\'
i
, p.;
s
'f, e
r i I :.'
5
,1 3
7.:
> - (
n w
?,
.; (,
i s'
s t
.'On; November'19,r1987,'CE will provide'a morejcomprenhensive overview of:the-.
ii System 80+ design lto the staff 1n room P.118 between.9:30'AM and 3:00 PM.t s
4 j
d 7.
..)
~
. Guy.;S. Viss'ing,' Project Manager-
-1 standardization-and Non-Power Reactor
. Project Directorate.
,d o
. Division of_ Reactor: Projects III', IV, V d
and Special Projects.
l g
9
-t,
' f.
s l'
i
[.:,
i 1
l
- 5; q,
i s.
'l l,
s 1
i 2
-2 y.
j l
t 1
j :....-
i g
\\ - t
,.... ; ;j
,e
.v,.
jm M 4, ;;.
~
~
~~~ "
~ ~ ~ '
~~ - R R y
9 October. 23,:1987.
j
^
ja.
i se >
=:N i; u.
I 7^.
':f
,,H 1r l0nl November'19,1987, ICE will provide a more comprehensive overview of the t"
-System 80+ design to.the. staff in-room P-118 between,9:30 AM and 3:00 PM.;
~
a l
oriai l
Guy 1.nal sianed by.Vissing, Project; Manager
.l Standardization and Non-Power. Reactor Project Directorate' 3
Division of Reactor Projects III,'IV, V.
and Special Projects
..s N:
j
- DISTRIBUTION
. fCentraldgfles]i[B i
.NRC PDR:
I "PDSNP Reading 1
~GVissing j
LRubenstein-l
- )
PDSNP PDSNP-GVisf)4('
'LRubenstein c10/2A/87.
10/23/87 4
i 1
1 l
1 i
L-i,
.f i
i I
r i
.a
-