ML20236C664

From kanterella
Jump to navigation Jump to search
Forwards Rev 15 to Physical Security Plan.Rev Formalizes Proposed Change 1 Submitted in .Attachment B Consists of Supplemental Info in Response to NRC Concerns
ML20236C664
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/16/1987
From: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
To: Murley T
Office of Nuclear Reactor Regulation
References
FYV-087-86, VYV-87-178, NUDOCS 8710270288
Download: ML20236C664 (2)


Text

'

I VERhiONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 October-16, 1987 VYV 87-178 FVY 087-86 o c:$

$M U.S. Nuclear Regulatory Commission p $

Office of Nuclear Reactor Regulation

.g Washington, D.C. 20555 Attention:

Dr. Thomas E. Murley Director

References:

a)

License No. DPR-28 (Docket No. 50-271) b) _

Letter, VYNPC to USNRC, VYV 86-350, dated 11/26/86

Subject:

Revision 15 to the Vermont Yankee Physical Security Plan

Dear Sir:

In accordance with the provisions of 10 CFR 50.90, we are requesting your approval of the enclosed Revision 15 to the Vermont Yankee Physical Security l

Plan.

This revision formalizes Proposed Change No.1 to our Physical Security Plan which was submitted as Reference (b).

This submittal also reflects incorporation of comments generated by Ms. J. Gibson, (NMSS) and Mr. R. Dube (RER) as a result of a meeting held at NRC offices in Betheseda, Md. on September 15, 1987. The assessment of these comments is found in Attachment B.

Attachment A to this letter provides the revised Security Plan pages.

Both Attachment A and B are considered SAFEGUARDS INFORMATION and as such, are to be withheld from public disclosure in accordance with the provisions of 10 CFR 73.21.

l DOCUENT TRANSMITTED HEREWITH WHEN SEPARATED FROM ENCLOSURES, CONTAINS SAFEGUARDS INFORMATION.

HANDLE THIS DOCUENT AS i

DECONTROLLED.

I B7102702B8 871016

~

PDR ADDCK 05000271

,f l

F PDR

- U.S. Nuclear Regulatory Commission..

i

, ' October 9,-1987

.,Page 2i We have enclosed ouristandard Document Custody Form and Change Transmittal i

Form for each copy of-the plan revision-required by the'NRC. Please sign and return:these forms.

t We trust that the enclosed information is deemed acceptable; however, should you have any questions, please contact Mr. Thomas Linn, Security Supervisor,-at.our plant site.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION-Warren P. Murphy Vice President and Manager of Operations

Enclosure:

1) Attachment A, Revision 15 to the Physical Security' Plan
2) Attachment 8, Supplemental Information in Response to NRC Concerns cc: Director, Office of Nuclear Reactor Regulation

. Attention: Document Control Desk 3

U.S. Nuclear Regulatory Commission j

Washington, D.C. 20555 (5' copies) l l

I

-l DOCUENT TRANSMITTED HEREWITH WHEN SEPARATED FROM ENCLOSURES,

. CONTAINS SAFEGUARDS INFORMATION.

HANDLE THIS DOCUENT AS DECONTROLLED.

l l

L i

1

[.E_-

!