License No. NPF-37 g
Connonwealth Edison Company As a result of the inspection conducted on June 24 through July 8,1987, and in accordance with the " General Polic, and Procedures for NRC Enforcement i
,l Actions," 10 CFR Part 2, Appendix C (,1985), the following violation was l
identified:
'l Technical Specifications, Section 6.8.1.a. states that written procedures shall
(
i be established, implemented and maintained covering activities referenced in
!j Procedures Appendix A, of Regulatory Guida 1.33, Revision 2, February 1978.
for abnormal or alarm conditions are required to be written by Part 5 of l
Abnormal Operating Procedure, IBOA Refuel-3, " Spent Fuel Pool l
Append <x A.
{
Level Loss - Unit 1," Revision 51, required, among other things, that the licensee stop all movement in response to the spent fuel pit low level alarm.
l 1
Contrary to the above, during the entire refueling, the licensee faileo to stop all fuel movement while the spent fuel pit level was below the alarm setpoint and the alarm was enunciated.
l This is a Severity Level IV Violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, yor a required to submit to this j
office within thirty days of the date of this.
- e a written statement or explanation in reply, including for each violation:
(1)correctiveaction l
taken and the results achieved; (2) corrective action to be taken to avoid l
further violations; and (3) the date when full compliance will be achieved.
Consideration may be given to extending your response time for good cause shown.